Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.3 LAdmitted-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 UDYAM WB 10 0078972 19CQSPB7095J1Z2 R M MII STATUS AS VERIFIED | KOLKATA | WEST BENGAL | 700060 | ₹71.3 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical BAIKUNTHAPUR S T K K ROAD TRIBENI HOOGHLY 712503 | TRIBENI | HOOGHLY | WEST BENGAL | 712503 | - | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | TECHNO ENGINEERING L1 |
|---|---|---|---|---|
| 1.00OH of Boiler Non-Pr Parts at U#6 | ||||
| 1.01 | Erection of Air / Flue Gas Duct
Expansion Bellow (Single/Double/ Three Leaf) | 200 | Meter | 6,500 ₹13 L |
| 1.02 | Checking & Repairing of Air / Flue Gas Ducts, ESP inlet and outlet Gate, Dampers & APH hoppers etc. | 50 | Metric Tonne | 45,654 ₹22.8 L |
| 1.03 | Replacement of ESP Inlet Distribution Boxes after Fabrication Job. | 1 | Number | 2,80,000 ₹2.8 L |
| 1.04 | Repairing of ESP inlet Distribution Box with proper cutting fabrication and refitting Job. | 3 | Meter | 1,89,000 ₹5.7 L |
| 1.05 | Hiring of Escort Crane with Operator & Fuel. | 1 | Lumpsum | 1,65,000 ₹1.6 L |
| 1.06 | Replacement of Expansion Joint (5/7leaf) | 80 | Meter | 12,000 ₹9.6 L |
| 1.07 | Running Welding Work for Boiler Casing & Air/Flue Gas Duct | 200 | Meter | 550 ₹1.1 L |
| 1.08 | Removing & Re-application of Insulation Work for Boiler Casing & Air/Flue Gas Duct. | 3,000 | Square meter | 490 ₹14.7 L |
Tender Value
₹75.6 L
EMD Value
₹1.5 L
Closing Date
23 Mar 2026, 2:00 pmClosed
GM(K)
GM bldg, KTPS, Mecheda, Purba Medinipur 721137
Service Contract for overhauling of Boiler Non Pressure Parts Air Flue Gas duct Expansion Joints during overhauling of Unit 6 under BM dept
2026_WBPDC_1018216_1
GMOH(6K)/CC/BM/3774/E3841
Open Tender
Support/Maintenance Service
Tender Opening Halll, GM bldg, KTPS, Mecheda
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.5 L
Yes
12 Jun 2026
6 Mar 2026
25 Mar 2026
6 Mar 2026
23 Mar 2026
7 Mar 2026
OH of Boiler Non-Pr Parts at U#6
Erection of Air / Flue Gas Duct Expansion Bellow (Single/Double/ Three Leaf)
Checking & Repairing of Air / Flue Gas Ducts, ESP inlet and outlet Gate, Dampers & APH hoppers etc.
Replacement of ESP Inlet Distribution Boxes after Fabrication Job.
Repairing of ESP inlet Distribution Box with proper cutting fabrication and refitting Job.
Hiring of Escort Crane with Operator & Fuel.
Replacement of Expansion Joint (5/7leaf)
Running Welding Work for Boiler Casing & Air/Flue Gas Duct
Removing & Re-application of Insulation Work for Boiler Casing & Air/Flue Gas Duct.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_2502025.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid