Ahmedabad Municipal Corporation Central Zone
Const. R.C.C. Road and Paver Block at Dudheshwar area, Old Shahpur, Mahendikua area and diff. Places Under Muni.Counisilor, M.P., M.L.A. and Other budget in Shahpur ward.
290449
CENTRAL ZONE E-Tender Notice No.17/2025-2026 Tender No.520
Open
Civil Works - Others
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹7,815
26 Mar 2026
26 Mar 2026
26 Mar 2026
7 Apr 2026
26 Mar 2026
Name of work: - bægÍtul Ntnvwh Jtuzobtk ytJuj swlt Ntnvwh rJM<th ytJ<t Bgwrl.rcÕzekd, Bgwrl.Nt¤t, ytuVem rcÕzekdbtk hevuhekd fhJt
<&t rmrJj Jfolu jd<e ytlw»ttkrdf ftbdehe fhJtlt ftb ctc<u.
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor, Sardar Patel Bhavan,
Danapith, Ahmedabad -
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate sealed tenders from
interested contractors for the following work at different locations within the limit of A.M.C.
1. Name of Work : bægÍtul Ntnvwh Jtuzobtk ytJuj swlt Ntnvwh rJM<th ytJ<t Bgwrl.rcÕzekd, Bgwrl.Nt¤t,
ytuVem rcÕzekdbtk hevuhekd fhJt <&t rmrJj Jfolu jd<e ytlw»ttkrdf ftbdehe fhJtlt
2. Tender Estimated Cost : Rs:- 7,81,527.67 (GST will be paid extra by AMC/Authority at
prevailing rate to the contractor.)
: 1% of the Tender Cost in the form of Rs. 7815.00 (D.D. / Pay
3. Earnest Money
- Order / Local Micr Check/B.G.)
4 Tender Fee Rs : Demand Draft of Rs.900.00
5 S.D. : 5 % of tender amount
6. Time-Limit : 12 months
7. Validity Period : 120 Days
8. (i) Last Date of Submission of :
(ii) Mode of Sending : a) In Sealed cover in duplicate copies by Registered Post A.D,
or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to :
a) Name of work, Tender Notice No. & Tender No.
be made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in : The Price bid shall be submitted online only.
Schedule of Quantities and
Rates It shall not be submitted Physically.
9. Date of Opening : Dt.08.04.2026, 17:00 PM
10 Place of Submission & : Submission of EMD. Tender fee and other Documents during office
Opening of Tender hours: On date.08.04.2026 16:00 pm Central Zone, 3rd Floor, A.M.
Office, Sardar Patel Bhawan, Danapith (Old Wing) .Ahmedabad
Municipal Corporation, C.Z. Office, Ahmedabad-380013.
11 Penalty Due to Delay of work (1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs) but not more then 10% of bill
12 Defect Liability : As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound to
Time permitted to start parts start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and through letter / E-
mail shall be considered legal and binding for the same. Failure of
comply to start the works in 48 hours of intimation as above by
contractor the contractor shall be levied penalty of (1) Rs.1000/- per
day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for
tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above 30 Lakhs). Three
times failures by contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in writing /
binding within 15 days of last notice of penalty.
ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk Ítulj ytuVem/v.J.yu./«tusufx rJCtd îtht
htuz/rcÕzekd/jtRx/c{es Ft<tytu îtht cnth vtzJtbtk ytJujt xuLzh sulwk mcbeNl <t.01-07-
GST 2017 vAe fhJtlwk &tg Au,<uJt <btb xuLzhtubtk <&t nJu vAe Cth vtzJtbtk ytJlth Wvhtuf<
14 ltKtk Ft<w vhuvºt lk-31 <t:-07-07- rJCtd/Ft<tltk <btb xuLzhtubtk (bxehegj+juch mÃjtg mt&u) GST ltk ltuxeVefuNl bwsc
2017 bwsc GST sgtk jtdw vz<tu ntug ðgtk mœhnwk ftbltk Bidder yu GST ltuxeVefuNl bwscle
yuÃjefucejexe ægtlbtk htFelu huxlwk cezekd fhJtlwk hnuNu. S.yum.xe. le hfb yjd &e awfJJtbtk
Signature of contractor
Add. City Engg.(Central Zone)
Name : Ahmedabad Municipal Corporation
Company's Seal :Date :
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT- CENTRAL ZONE.
Name of Work: bægÍtul Ntnvwh Jtuzobtk ytJuj swlt Ntnvwh rJM<th ytJ<t Bgwrl.rcÕzekd, Bgwrl.Nt¤t, ytuVem rcÕzekdbtk hevuhekd fhJt
<&t rmrJj Jfolu jd<e ytlw»ttkrdf ftbdehe fhJtlt ftb ctc<u.
Qty Description of Items Rate Rs. Per Amount Rs.
Excavation for foundation up to1.5 m depth
including sorting out and stacking of useful
materials and disposing of theexcavated stuff
upto 50 Meter lead.(A) Loose or soft soil
5 1.5 to 3.0 mt.depth 158.4 Cu.M.
Excavation for foundation for depth from 1.5 m to
3.0 m including sorting out and stacking of useful
materials and disposing off the excavated stuff upto
50 Meter lead.(C) Hard Murrum
Filling available excavated earth (excluding rock)
in trenches, plinth, sides of foundations etc. in
2 2 layers not exceeding 20 cm. in depth 90.85 Cmt
consolidation each deposited layer by ramming and
Filling in plinth with sand underfloors
3 2 including watering ramming, consolidating and 336.34 Cmt
dressing etc. complete.
Filling in foundation and plinth with murrum or
selected soil in layers of 20 cm. thickness
including watering, ramming and
consolidating etc.
Providing and laying cement concrete1:5:10
(1-Cement: 5- coarses sand and:10-hand
broken stone aggregates 40mm nominal size)
and curing complete excluding cost of
formworkin (A) Foundation and Plinth (upto
Providing and laying cement concrete1:4:8
(1-Cement: 4- coarses and:8-hand broken
6 3 stone aggregates 40mm nominal size) and 2,378.20 Cmt
curing complete excluding cost of formworkin
(A) Foundation and Plinth (upto 10 ton).
Providing and laying cement concrete 1:3:6 (1-
Cement : 3- coarse sand : 6- hand broken stone
7 2 aggregates 40 mmnominal size) and curing 2,652.10 Cmt
complete excluding cost of formwork in (A)
Foundation and Plinth..
Providing and laying cement concrete 1:3:6
(1-Cement:3-coarse sand:6-hand broken
8 2 stone aggregates 20mm nominal size) and 3,419.90 Cmt
curing complete including cost of formwork in (A)
wall caps/coping (upto 10 ton)..
Providing and laying cement concrete work
1:2:4 ((1-Cement:2- coarse sand:4-graded
9 aggregates 20mm nominal size) curing
complete excluding cost of formwork and
Foundations, footings, base or columns and
Slabs, landing, shelves, balconies, lintels,
b 2 beams, girders and cantilivers upto floor two 3,687.20 Cmt
Independent piers, columns, and pillars, upto floor
Provdg. & laying cement concrete 1:2:4 (1
cement : 2 coarse sand : 4 graded stone
aggregates 20 mm nominal size) for
reinforced concrete chhajjas not exceeding
cm. thickness upto floors two level including
finishing the exposed surfaces with cement
mortar 1:3 (1 cement : 3 find sand) to give a smooth
and even surface centering and form work
and curing complete excluding cost of
Providing and laying in position Ready
Mixed M-150 grade concrete for reinforced
cement conctere work, using cement content
as per approved Design Mix manufactured
in fully automatic batching plant and
transported to site of work intransit mixer for a
lead up to 10 kms having continuous agitated
mixer, manufactured as per mix design of specified
grade for reinforced cement concrete work
including pumping of R.M.C. from transit mixer
to site of laying, excluding the cost of
centering shuttering finishing and
reinforcement including cost of admixtures
inrecommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve
work ability without impairing strength and
durability as per direction of theEngineer-in-
charge. Without Fly Ash (Min cement level as per
latest IS456 shall be maintained) (Cement
Providing and laying in position Ready
Mixed M-250 grade concrete for reinforced
cement conctere work, using cement content
as per approved Design Mix manufactured
in fully automatic batching plant and
transported to site of work intransit mixer for a
lead up to 10 kms having continuous agitated
13 1 mixer, manufactured as per mix design of specified 4,567.05 Cum
grade for reinforced cement concrete work
including pumping of R.M.C. from transit mixer
to site of laying, excluding the cost of
centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve
work ability without impairing strength and
durability as per direction of theEngineer-in-
charge. Without Fly Ash (Min cement level as per
latest IS456 shall be maintained) (Cement
Providing and laying in position Ready Mixed M-300
grade concrete for reinforced cement
conctere work , using cement content as per
approved Design Mix manufactured in fully
automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as
per mix design of specified grade for
reinforced cement concrete work including pumping
13 a 1 of R.M.C. from transit mixer to site of 4,800.92 Cum
laying, excluding the cost of centering shuttering
finishing and reinforcement including
cost of admixtures in recommended proportions as
per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing
strength and durability as per
direction of the Engineer - in - charge. Without Fly
Ash (Min cement level as per latest IS
shall be maintained) (Cement level 475 kg )
Providing and laying in position Ready Mixed M-350
grade concrete for reinforced cement
conctere work , using cement content as per
approved Design Mix manufactured in fully
automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as
per mix design of specified grade for
reinforced cement concrete work including pumping
13 b 1 of R.M.C. from transit mixer to site of 4,920.49 Cum
laying, excluding the cost of centering shuttering
finishing and reinforcement including
cost of admixtures in recommended proportions as
per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing
strength and durability as per
direction of the Engineer - in - charge. Without Fly
Ash(Min cement level as per latest IS
shall be maintained) (Cement level 500 kg )
Providing and laying controlled cement
concrete / Ready Mix Concrete of M-200 and
14 curing complete, excluding the cost of form
work and reinforcement for reinforced concrete
Foundations, footings, base of columns, and
Walls from top of foundations /level up to floor Four
Slabs,landing,shelves,Balconies Lintels, Beams,
(C) 2 Girders and Cantilever upto floor 4,187.70 Cu.M.
Columns, pillars, posts, and struts, up to floor Four
Staircase up to floor four level. (excluding
(K) 2 Vertical and horizontal fins up to floor four level. 4,338.40 Cu.M.
Providing and Laying ordinary cement
concrete 1:2:4 (1-Cement 2-coarsesand: 4-
graded stone aggregates 20 mm nominal size)
15 2 and finishing smooth with curing etc. complete 4,849.10 Cum
including the cost of form work but excluding the
cost of reinforsement for R.C.C work in (iv) Slabs
having more than 13 cm and upto 15 cm.thickness
Providing and Laying ordinary cement
concrete 1:2:4 (1-Cement 2-coarsesand: 4-
graded stone aggregates 20 mm nominal size)
15a 2 and finishing smooth with curing etc. complete 5,580.77 Cum
including the cost of form work but excluding the
cost of reinforsement for R.C.C work in (iv) Slabs
having more than 8 cm and upto 10 cm.thickness
Brick work using common burnt clay
building bricks having crushing strength not
16 2 less than 35kg./Sq.Cm.in foundation and plinth
in Cement Mortar1:6 (1-Cement :6 - fine
2 (A) Conventional (upto 10 ton) 2,814.90 Cmt
2 B) Modular 3,021.70 Cmt
Extra Rate for brickwork in Above Item for
17 super structure above plinth level upto floor two
level (B) Conventional
a 2 (A) Conventional (upto 10 ton) 181.5 Cmt
b 2 B) Modular 174.9 Cmt
C) above floor two level Item No. 2(6.13) (A) Floor
D) above floor two level Item No. 2(6.13) (B) Floor
Conventional Per
Half brick masonry in common brunt clay
building bricks having crushing strength not less
than 35 Kg/Sq.Cm. in Cement mortar 1:5 ( 1-
Cement : 5 coarse sand ) in foundation
and Plinth conventional brickwork (up to
Extra for half brick masonry in super structure
19 2 above plinth level upto floor two level 433.4 Smt
(B) conventional
Providing and laying Pre cast Light weight concrete
hollow core wall with hollow core concrete unit
of approved make & size of 92 mm thick,
mm wide and 2400 mm/ 2600 mm/ 2850 mm/
3000 mm/ 3300 mm in legth made from of
controlled cement concrete M20 having cube
compressive strength not less than 20 MP a jointing
with high strength & tensile adhesion non-shrink
cementitious joint compound /P.U. Foam.
(Plaster not required)
Providing and laying Pre cast Light weight concrete
hollow core wall with hollow core concrete unit
of approved make & size of 120 mm thick, 600 mm
wide and 2400 mm/ 2600 mm/ 2850 mm/
mm/ 3300 mm in legth made from of controlled
cement concrete M20 having cube compressive
strength not less than 20MP a jointing with high
strength & tensile adhesion non-shrink
cementitious joint compound/ P.U.Foam. (Plaster
Providing and laying Pre cast Regular
concrete hollow core wall with hollow core
concrete unit of approved make & size of
mm thick, 600 mm wide and 2400 mm/ 2600 mm/
2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M35 having
cube compressive strength not less than 35 MP a
jointing with high strength & tensile adhesion non-
shrink cementitious joint compound/
P.U.Foam. (Plaster not required)
Providing and laying Precast Regular
concrete hollow core wall with hollow core
concrete unit of approved make & size of 120 mm
thick, 600 mm wide and 2400 mm/ 2600 mm/
mm/ 3000 mm/ 3300 mm in legth made from of
controlled cement concrete M35 having cube
compressive strength not less than 35 MP a jointing
with high strength & tensile adhesion non-shrink
cementitious joint compound /P.U.Foam. (Plaster
Providing form work in ordinary timber
planking so as to give a rough finish including
centering, shuttering, strutting and propping etc.
24 height of propping and centering below
supporting floor to celling not exceeding 4 M
& removal of the same for in situ reinforced or
plain concrete work upto floor four level
Foundation, footings, bases of columns etc.
and mass concrete.
(B) Flat surfaces such as soffits of supspened floors
b 1 slabs Landings and the like. (1) Floors etc. upto 200 168 Smt
mm in thickness.
(B) Flat surfaces such as soffits of suspended floor
c 1 roof slabs Landings and the like. (2) Floors etc. 180.6 Smt
above 200mm in thickness.
Vertical surface such as walls (any thickness)
d 1 partitions and the like including attached buttresses 153.3 Smt
& string course & the like.
(ii) Sides And Soffits Of Beam, Haunchings
e 1 Cantilevers, Girders, Bressumers And Lintels 128.1 Smt
Not Exceeding 1 M In Depth.
(G) Columns PillarsPosts and struts. (1) Square
Rectangular Polygonal in plan.
g 1 (2) Circular or curved in plan. 281.4 Smt
(H) (2) Sides and soffits of Beams Beam
h 1 Haunchings canti-levers Girders Bressumers and 173.25 Smt
Lintels exceeding 1M.in Depth.
Providing and fixing 35 mm thick shutters for
Doors, windows and clear story windows
including anodised alluminium butt hinges with
necessary screws.
a 1 (A) Indian Teak Wood (ii) Fully Glazed. 2,380.35 Smt
b 1 (B) Indian Teak Wood (ii) Fully Panelled 3,227.70 Smt
(C) Indian Teak Wood (iii) Partly panelled and
Providing and fixing 35 mm thick shutters for
Doors, windows and clear story windows including
black enamelled M.S.butt hinges with necessary
(A) Indian teak wood. (i) Fully Panelled.(upto
(A) Indian teak wood. (ii) Fully Glazed.(upto
(A) Indian teak wood. (iii) Partly panelled and
partly glazed. (upto 10 ton)
Providing and fixing 35 mm thick panelled,
glazed or panelled and glazed shutters for Doors
27 windows and clear story windows including
anodised alluminium But hinges with necessary
screws and indian teak wood shutters with.
a 1 (A) Plywood sheet panels. 2,699.55 Smt
b 1 (B) Particle board panels 2,672.25 Smt
c 1 (C)Hard board panels. 2,648.10 Smt
d 1 (D) Asbestos sheet panels. 2,659.65 Smt
Providing and fixing 25 mm thick shutters for
cup boards etc. including black enamelled
M.S. butt hinges with necessary screws.(A) Indian
teak wood. (i) Fully Panelled. (upto 10 ton)
Providing and fixing 25 mm thick shutters for
cupboards etc. including anodised alluminium
butt hinges with necessary screws. (A) Indian teak
wood. (ii) Fully Glazed.
Providing and fixing 25 mm thick shutters for
cupboards etc. including anodised alluminium
b 1 butt hinges with necessary screws. (A) Indian teak 2,170.35 Smt
wood. (ii) Partly panelled and partly
Providing and fixing plain asbestos cement sheet
6 mm thick in partitions including fixing to
29 2 fames with screws etc, complete with 50 mm x 224 Smt
12 mm Deodar wood beading (Frames to
be paid separately) (upto 10 ton)
Providing and fixing in partitions 4 mm thick
medium hard board of approved quality including
30 2 fixing to fames with screws etc complete with 50 328 Smt
mm x 12 mm teak wood beading (Frames to
be paid separately) (upto 10 ton)
25 mm thick wooden shelves supported on
40 x 40 mm x 6 mm T or L iron brackets fixed
31 2 at suitable distances but not exceeding 1,360.00 Smt
75 cm. apart with Mango wood or equivalent
quality. (upto 10 ton)
40 mm thick wooden shelves supported on
40 x 40mm x 6 mm T or L iron brackets fixed at
32 1 suitable distances not exceeding 75cm. Apart 1,810.00 Smt
with Mango wood or equivalent quality. (upto
Providing and fixing M.S. round or square bars
with M.S. flats at required spacing in wooden
frames of windows and clerestory
windows.(upto10 ton)
Providing and fixing M.S. grills of required pattern
to wooden frames of windows etc. with M.S. flats
34 2 at required spacings and frame alround, 66.78 kg
square or round bars with round headed bolts and
nuts or by screws (A) Plain Grill. (upto 10 ton)
Providing and fixing M.S. grills of required pattern
to wooden frames of windows etc. with M.S. flats
a 1 at required spacings and frame alround, 95.76 kg
square or round bars with round headed bolts and
nuts or by screws (A) Ornamental Grill. (upto 10 ton)
Providing and fixing glazed louvered glass
windows and ventilators with teak wood frame
10 cm. x 7 cm. size including 3 coats of oil
painting to wood work etc.complete. (upto 10 ton)
Providing and fixing glazed louvered glass
windows and ventilators with teak wood frame
36 2 10 cm.x7 cm. size including 3 coats of oil 3,872.00 Smt
painting to wood work etc.complete.with wooden
louvers plank 12mm thick (upto 10 ton)
Providing and fixing 35 mm thick shutters for
Doors, windows and clere story windows
including Indian teak wood frames 10 cm x 7 cm.
37 2 size including anodized alluminium fixtures 4,026.19 Smt
and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete.(ii)
Providing and fixing 35 mm thick shutters for
Doors, windows and clere story windows
including Indian teak wood frames 10 cm x 7 cm.
38 2 size including black enamelled iron oxidixed 4,821.11 Smt
fixtures and fastenings including primer coat of
approved quality and two coats of oil painting etc,
complete.(ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors,
windows and clerestory windows
including Indian teak wood frames 10 cm x 7 cm.
a 1 size including anodized alluminium fixtures 4,423.65 Smt
and fastenings including primer coat of approved
quality and two coats of oil painting
etc, complete. (iii) Partly panelled and partly glazed.
Providing and fixing 30 mm thick FACTORY
MADE SOLID PANEL PVC DOOR SHUTTER
consisting of frame made out of M.S.tubes of
gauge thickness and size of 19 mm x 19 mm for
stiles and 15 mm x 15 mm for to p and bottom
rails.M.S. frames hall have a coat of steel
primers of approved make and manufacture, M.S.
frames hall be covered with 5 mm thick heat
moulded PVC ‘C’ channel of size 30 x 50 mm
formings tiles, and 5 mm thick 75 mm wide PVC
sheets for to prail, lock rail and bottom rail on either
side, and 10 mm (5 mm x 2) thick, 20 mm wide
cross PVC sheet as gap insert for to p rail and
bottom rail, Panelling of 5 stiles and rails with
mm wide x 5 mm thick PVC sheet beading
on eighter side, and joined together with
solventcement adhesive,. An additional 5 mm thick
PVC strip of 20 mm width is to be stculkon the
interiors ide of the ‘c’ channel using PVC
solventcement adhesive etc. complete as per
direction of Engineer incharge, manufacture’s
specification and drawing.
Providing and fixing in position collapsible
steel shutters with vertical channels 20 x 10 x
2 mm braced with flat iron diagonal 20 x6 mm size
with top and bottom rails T iron 40 x 40 x 6 mm
with 38 mm dia steel pulleys complete with bolts,
units, locking arrangements, stoppers, handles,
including a priming coat of red lead paint &
Providing and fixing 1 mm thick M.S. sheet
sliding shutters with frame and diagonal
braces of 40x40x6 mm angle iron, 3.15 mm
M.S.gusset plates at Junctions and corners
41 1 mm dia. pulley, 40x40x6 mm angle and T- 2,625.00 Sqm
iron huide rail at top and bottom
respactively with handles, stoppers and locking
agangement etc, including applying a priming
coat of red lead paint. (upto 10 ton)
Providing and fixing rolling shutters of approved
make made of 80 mm wide M.S.laths inter-
locked together through their entire length and
jointed together at theends by end locks mounted
on specially designed pipe shaft with bracket
plates, guide channels and arragements
for inside and out side locking with
push-pull operation including the cost of hood
cover and spring etc. complete. (A)
Shutters having width below 3.5 M.
Providing and fixing rolling shutters of approved
make made of 80 mm wide M.S.laths inter-
locked together through their entire length and
jointed together at theends by end locks mounted
on specially designed pipe shaft with bracket
plates, guide channels and arragements
for inside and out side locking with
push-pull operation including the cost of hood
cover and spring etc. complete. (A)
Shutters having 3.5 M. & Above
Providing & Fixing in position Alluminium doors
with frame using approved quality anodised
extruded alluminium section as approved by
Engg.in charge(Jindal alluminium) (a)
Frame sections 101.6x44.45 mm (b) Shutter
bottom vertical & top section 83.5x44.45 (wt.1.31
kg/mt.)(at 1.31 kg/mt) (c) Shutter bottom
43 1 section at 114.3x44.45 mm at (1.37kg/mt) 2,900.00 Smt
Shutter middle section at 100x44.3 wt.(1.37 kg/mt)
incl.providing & installing 5 mm thick
approved color Acrylic sheet of standard
quality fixed with glazing chips on upper pannel &
Laminated sheet on lower pannel (wtt.0.13
kg/Rmt) etc.comp.as direction of engg.in
Providing and fixing extruded aluminum window
having extruded aluminum Colour
Powder Coated section frame main outer size
Kg/mt,horizontal Four track member size 122.20mm
Kg/mt,vertical member of size 122.20mm x
31.75mm x 1.50mm ,@ Wt. 1.398 Kg/mt with
44 1 sliding shutters of horizontal member size 40mm x 2,500.62 Sq. M.
0.456Kg/mt,vertical member of size 40mm x 18mm
x 1.29mm @ wt.of 0.456Kg/mt,@ with
5 mm thick transparent bronze colour tinted float
glass with powder coated aluminum
fittings and fixtures and transparent silicon sealant
glass fixing to frame as per details etc
complete for window.
Providing & Fixing in position Alluminium vents
with frame using approved anodised extruded
alluminium section as approved by Engg. In
charge.(Jindal alluminium) units equivalent
Approved Rate)Frame section of 63.50 x
mm. (wt. 0.68Kg/Rmt) incl. Providing & Installing
5 mmthick approved color Acrylic sheet of
standard quality etc. comp.
Providing and fixing standared extruded of
alluminium section of size 63 mmx38.10
mmx1.2 mm (Jindal Section:2434, @ Wt.0.643
Kg/mt) with colour anodized alluminium
frame for ventilation with 5 mm thick frosted
glass as details etc complete for Ventilation
Providing and fixing standared extruded of
alluminium section of size 63.50 x 38.10 x
47 1 mm,@ Wt 1.094Kg / Rmt with colour Powder 2,141.88 Sq.M.
Coated alluminium frame with 5 mm thick
transparent bronze colour tinted float glass as
details etc complete for Fix Partition
Providing and laying 40 mm thick marble chips
flooring rubbed and polished (I.E.terrazo) to
granolithic finish with under layer 30 mm thick
cement concrete1:2:4 (1-Cement: 2-coarse sand:
4-graded stone aggregate 10 mm and
down gauge) and to player 10 mm thick with white,
black or white and blak marble cihps of required
sizes from 1 mm to 4 mm nominal size laid in
cement marble powder mix 3:1 (3- Cement:1-Marble
powder by weight) in proportion of 4:7 (4-
Cement: 7-marble chips by volume) (C)
Medium Shade pigment with approx 50%
white cement and 50% ordinary cement (In top
layer only) (upto 10 ton)
Providing and laying marble chips skirting
(Terrazo) or dedo rubbed, and polished to
Granolithic finish to player 6 mm white, black or
white and black marble chips of size from
smallest to 4 mm nominal size laid in cement
marble powder mix 3:1 (3-Cement: 1 marble
powder by weight) in proportion of 4:7 (4-cement
marble powder mix: 7-marble chips by volume) (B)
Light shade pigment with white cement (In top layer
Providing and laying white glazed tiles 6mm thick in
flooring treads of steps and landing laid
50 1 on a bed of 12mm thick cement mortar 1:3 (1- 726.6 Sq.M.
cement : 3-coarse sand ) finishing with flush
pointing in white cement.
Providing and laying Ceramic tiles 6 mm thick in
flooring treads of steps and landing laid on a bed of
51 1 12 mm thick cement mortar 1:3 (1- cement :3- 696.15 Sq.M.
coarses and) finishing with flush pointing in white
cement. (upto 10 ton)
Providing & Fixing 20 mm thick Mirror Polished
Decorative Granite Board with Computerised
Golden Letters Discription as per
instructions of engg. in charge to M.S. frame
structure for Inaugaration & Public Handover
Function (N.S.)
Providing and laying Vitrified tiles 8 to 10 mm thick,
36''x36'' in flooring treads of steps and landing laid
on a bed of 12 mm thick cement mortar 1:3
(1-cement:3-coarses and) finishing with flush
pointing inwhite cement. (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick,
24''x24'' in skrting risers of steps and dedo on
54 1 mm thick cement plaster 1:3 (1- cement: 819 Sqm
3-coarse sand) and jointed with white
cement slurry (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick,
in skrting risers of steps and dedo on 10 mm
55 1 thick cement plaster 1:3 (1-cement:3- coarse 1,326.15 Sqm
sand) and jointed with white cement slurry (upto
Providing and laying 24" x 24" vitrified Tiles
8 to 10 mm th. Double Charged gloosy/ Matt
of Approved make as approved by Adl.C.E. /
consultants in flooring over 20 mm thick cement
mortar 1:6 (1 cement : 6 coarse sand)on new
surface& jointed with colour cement slurry incl
with flush pointing & cleaning the surface etc.
Providing and laying 24" x 24" vitrified 8 to
10 mm th.Double Charged Gloosy / Matt
tiles of Approved make as Approved by Adl.C.E.
/ Consultants for upto 10 cm high skirting as
57 20 approved by Engineer in charge over 10 mm 165 Rmt
thick cement mortar 1:6 (1 cement : 6 coarse
sand)on new surface& jointed with colour cement
slurry incl with flush pointing & cleaning the
surface etc. comp.
Providing and laying polished Kota stone slab
flooring over 20 mm (Average) thick base of
cement mortar 1:6 (1-cement:6-coarses and)
or L.M.1.1.5 (1-Lime putty:1.5-coarses and)
laid over and jointed with grey cement slurry mixed
with pigment to match the shade of slab
including rubbing and polishing etc. complete. (A)
25 mm thick (upto 10 ton)
Providing and laying marble stone slab flooring over
20mm (average)base of cement mortar 1:6 (1-
cement : 6 coarse sand) or L.M. 1:1.5(1- lime putty :
59 1 1.5 - coarse sand) laid and jointed with gray cement 1,752.45 Sq.M.
slurry including rubbing and polishing complete. (A)
Marble slab 25mm
Providing and laying polished Kota stone slab
flooring over 20 mm (Average) thick base of
cement mortar 1:6 (1-cement:6-coarses and) or
L.M.1.1.5 laid over and jointed with grey
cement slurry including rubbing and polishing
etc.complete. (B) 30 mm thick (upto 10 ton)
Providing and laying polished kota stone slab
mm thick in risers of steps, skirting Dedo and pillars
laid on 10 mm thick cement mortar 1:3 (1-Cement
61 1 :3 coarses and) and jointed with gray cement 932.4 Sq.M.
slury mixed with pigment to match the shade of
slab including rubbing and polishing
etc.complete. (upto 10 ton)
Providing and laying cement concrete
flooring 1:2:4 (1-cement: 2-coarses and:4-
62 1 graded stone aggregate 20mm nominal size) laid 198.45 Sq.M.
in one layer and finished with a floating coat of
neat cement. (A) 40mm thick. (upto 10 ton)
Providing and laying cement concrete
flooring 1:2:4 (1-cement: 2-coarse sand:4-
63 1 graded stone aggregate 20mm nominal size) laid 232.05 Sq.M.
in one layer and finished with a floating coat of
neat cement. (B) 50mm thick. (upto 10 ton)
Providing and fixing pre-cast concrete kerb
stone of gray cement based concrete block
cm length, 30 cm height and 15 cm thick of M250
64 1 grade concret as per approved design and 327.17 Rmt
including excavation for fixing in proper line and
level, filling the joint with C:M 1:3 (1 cement :3
fine sand) etc complete. (upto 10 ton)
Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick
with grade of concrete M300 pnumatic compressed /
vibrated mechanically and as per
approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling
and filling the joint with sand in proper line and level
as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing and laying broken china mosaic flooring
for terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to
plain or slope and to be tempered to bring mortar
creme out upto surface using white cement
including rounding off junctions and extending
them up to15 cm along the wall, clearing with
water and oxalic acid etc.asdirected.
Providing and laying coloured glazed tiles
of the size 300 mmx200 mmx8 mm/300
mmx450 mmx8 mm in skirting, risers of steps
and dedo on 10 mm. thick cement plaster 1:3
(1cement: 3 coarse sand) & jointed with white
Providing corrugated G.I. sheet of class-3
roofing fixed with glavanished iron J or
L Hooks, Bolts and nuts 8 mm diameter with
68 1 bitumen and G.I. limpet washer or G.I. limpet 793.1 Sqm
washer. filled with white lead complete excluding
the cost of purlins, Rafters and Trusses. (1)
mm thick sheet.(up to10 ton)
Providing ridges or hips 600 mm over allin plain
69 15 G.I. sheet class-3 fixed with G.I. J or L Hooks 493.5 Sqm
and nuts 8 mm dia G.I. Limpet and bitumen
washer complete. (1)
Providing and fixing 150 mm wide 450 mm over all
semi circular plain G.I.sheet class-3 gutter with
70 2 Iron brackets 40 mmx3 mm size Bolts, Nuts, 435.75 Sqm
washers etc. including making necessary
connection with rain water pipes. (i) 0.80 mm thick
Providing and fixing five courses water profing
treatment with bitumen felt consisting of
second and fourth course of blown/ bitumen
or/and residual bitumen applied hot at
kg.per Sq.M.of area for each course and first
course with fibre base bitunen saturated under
lay type land third course with fibre base self
finished felt type 2 grade 1 and fifth and final
course of stone grit 6 mm and down size or pea
sizes gravel spread at
Cu.Metre/Sq.metre preparation of surface
excluding grading complete. (upto 10 ton) including
Providing and fixing on wall face C.I. Rain water
pipe including filling the joints with spun yarn soaked
in neat cement slurry and cement mortar
1:2(1- Cement : 2-fine sand) (A) 75 mm dia.
Providing 15 mm thick cement plaster in
single coat on Rough (Similar) side of single or
73 2 half brick walls for interior plastering up to floor 116.55 Sqm
two level and finished even and smooth in (i)
Cement mortar 1:3 (1-cement :3-sand)
Providing 20mm thick sand faced cement plaster on
walls upto height 10 metres above ground level
74 2 consisting of 12mm thick backing coat of C.M. 1:3 198.45 Sqm
(1-cement : 3-sand) and 8mm thick finishing coat of
C.M. 1:1 (1-cement : 1-sand) etc. complete.
Colour washing with lime on wall surface (two
coats) over and including a primary coat of
75 5 white washing to give an even shade after 8.19 Sqm
through brooming the surface to remove all dirt,
dust, mortar drops and other foreigh matter.
Removing dry or oil bound distemper by
a washing and scraping and sand papering
the wall surface smooth including necessary
repairs to scratches complete.
Distempering with dry distemper of approved brand
and manufacture (two coats) and of required
shade on wall surfaces of given an even shade,
77 5 over and including a priming coat of 31.29 Sqm
whiting after thoroughly brooming the surface
free from mortar dropping and other foreign
Distempeing (Two coats) with oil bound
distemper of approved brand and
manufacture and of required shade on wall
surfaces to give an even shade, over and
including a priming coat with distemper
primer of approved brand and manufacture
after thoroughly brushing the surface free from
mortar dropping and other foreign matter
and also including preparing the surface even
and sand papered smooth.
Extra Coat for Above Item over above for
79 5 every subsequent coat of approved brand and 20.06 Sqm
Wall painting (two coats) with plastic emulsion
paint of approved brand and manufacture
on undecorated wall surface to give an even
shade including throughly brushing the surface
free from mortar droppings and other foreign
matter and sand papered smooth.
Extra over item for every sub sequent coat of
81 5 wall painting with plastic emulsion paint of 22.26 Sqm
Extra over item for painting with plastic emulsion
81 a 5 paint of approved brand on ceilings and sloping 3.57 smt
Applying priming coat over new steel and other
metel surface after and including preparing
the surface by throughly cleaning, oil, grease,
82 5 dirt and other foreign matter and scoured 22.89 Sqm
with brushes fine steel wood, scrapers and sand
paper with ready mixed priming paint brushing
Painting two coats (excluding priming coat)
on new steel and other metal surface with
enamel paint, brushing, interior to give an even
shade including cleaning the surface an even
shade including cleaning the surface of all dirt, dust
and other foreign matter.
Painting one coats (excluding priming coat) on
previously painted steel and other metal surface
84 5 with enamel paint, brushing to give an even 34.5 Sqm
shade including cleaning the surface of all dirt,
dust and other foreign matter.
85 5 Extra over item for every sub sequent coat of paint. 33.6 Sqm
Painting two coats (excluding priming coat)
on new steel and other metal surface with
86 5 synthetic enamel paint, brushing to give an even 47.36 Sqm
shade including cleaning the surfaceofalldirt,dust
and other foreign matter.
Painting one coats (excluding priming coat) on
previously printed steel and other metal surface with
87 5 synthetic enamel paint, brushing to give an even 29.19 Sqm
shade including cleaning the surface of all dirt, dust
and other foreign matter.
Extra over Above item for every sub sequent
Painting two coats (excluding priming coat)
on external surface of new rain water, soil, waste
and vent pipes and fittings with ready mixed
bituminous brushing, black, anti corrosive to
give an even shade including cleaning of all dirt,
dustand other foreign matter.(75 mm dia)
Painting two coats (excluding priming coat)
on external surface of new rain water, soil, waste
and vent pipes and fittings with ready mixed
bituminous brushing, black, anti corrosive to
give an even shade including cleaning of all dirt,
dust and other foreign matter.(100 mm dia)
Painting two coats (excluding priming coat)
on new wood and wood based surface with
enamel paint, interior to give an even shade
91 5 including cleaning the surface of all dirt, dust 26.78 Sqm
and other foreign matter sand papering and
stopping. (a) Ready mixed paint
brushing wood primier pink.
Painting one coats (excluding priming coat) on
previously painted wood and wood based
surface with enamel paint, to give an even shade
including cleaning the of all dirt, dust and other
foreign matter.(b) Ready mixed paintbrushing
priming for enamel
Extra over Above item for every sub sequent
Painting two coats (excluding priming coat)
on new wood and wood based surface with
ready mixed paint, brushing, oil, gloss, semi gloss
to give and even shade including cleaning of all
dust, dirt and other foreign matters and
papering and stopping.
Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats) to
give an required shape even shade after
thoroughly brushing the surface to remove all dirt,
and remains of loose powdered
materials.etc complete
Applying two coats of Birla (white cement
based) or Asian (acryliclapy-putty) or
equivalent & two coats of primer of approved
96 5 brand and manufacture on new wall surface to 47.41 Sqm
give an even shade including thoroughly brushing
the surface free from mortar dropping and other
foreign matter and sand papered smooth.
Painting two coats (excluding priming coat)
on new wood and wood based surface with
enamel paint, interior to give an even shade
including cleaning the surface of all dirt, dust
and other foreign matter sand papering and
Writing letter or figures on any surface with
black japan paint (stops, comas, hyphens and
98 5 the like not to be measured and paid for 2.1
separately) (i) Block (Letters/Figures) (Per
10 Letter pet CM.HT)
Extra over items for using thick white paint
99 5 instead of black japan paint. (i)Block 0.08
(Letters/Figures)
Writing letter or figures on any surface with per
black japan paint (stops, comas, hyphens and letter
the like not to be measured and paid for per
separately) (ii) Indian(Letters/Figures) Cm/Ht
Extra over items for using thick white paint
101 5 instead of black japan paint. (ii) Indian 0.08
(Letters/Figures)
Painting lines, deashes, arrows, letters etc on
roads, Air fields and like in two coats with road
102 5 marking paint, brushing including cleaning the 81.27 Sqm
surface of all dirt, dust and other foreign matter.
(i)Over 10cmi n width
Painting lines, deashes, arrows, letters etc on
roads, Air fields and like in two coats with road
103 5 marking paint, brushing including cleaning the 8.09 Rmt
surface of all dirt, dust and other foreign
matter.(ii) Upto 10 cm in width
Painting lines, deashes, arrows, letters etc on
roads, Air fields and like in one coats with road
104 5 marking paint, brushing including cleaning the 33.6 Sqm
surface of all dirt, dust and other foreign matter.
(i)Over 10cm in width
Painting lines, deashes, arrows, letters etc on
roads, Air fields and like in one coats with road
105 5 marking paint, brushing including cleaning the 3.68 Sqm
surface of all dirt, dust and other foreign matter.
(ii) Upto 10cm in width
Demolition including stacking of serviceable
106 2 materilas and disposal of unserviceable materials 698.25 Cu.M.
with all lead and lift. (i) R.C.C. work
Demolition of Brick work and stone masonry
including stacking of serviceable materil as and
disposalof unserviceable materials with all lead
and lift.(ii) In Cement Mortar.
Dismentaling tiled of stone floors laid in mortar
including stacking of serviceable materil as and
disposal of unserviceable materials with all lead
Dismentaling of sheet roofing including
ridges, Hips, Valleys, Gutters etc. stacking of
109 1 serviceable materil as and disposal of 31.5 Sqm
unserviceable materials with all lead and lift.(i)
G.I.sheet roofing.
Dismentling steel work including distempering
and stacking the materials with all lead and lift.
Dismentling doors, windows, ventilators etc.
(wood or steel) shutters including
chowkhats architraves, hold fasts and other
attachment etc. complete and stacking the
material within all lead and lift.(i) Not exceeding
Dismentling doors, windows, ventilators etc.
(wood or steel) shutters including
chowkhats architraves,hold fasts and other
attachment etc. complete and stacking the
material with in all lead and lift.(ii) Exceeding
Dismentling barbed wire in fencing including
making rolls and also including dismentling
fencing posts including all earth work concrete in
base and making good the disturbed
ground stacking useful materials as directed
and disposing as directed and disposing
of the unserviceable materials with all lead and
Dismentling C.I. pipes G.S.W. pipes abd A.C.
rain water pipes with fittings and clamps
including stacking the materials with all lead and lift
(for any dia, of pipe)
Dismantling santtary fittings like wash basin .
W.C. pan Indian and Europe an type, flushing
tank etc. including stacking the materials with all
Scraping oil paint from steel and other metal
116 1 surface and making the surface even (with 32.55 Smt
Hand Scraping.)
Removing and scraping of old deteriorated
plaster of any thickness from wall /
117 1 R.C.C member including stacking of 12.92 Smt
serviceable material and disposal of
unserviceable from site of work with all lead and lift
Providing and fixing M.S. fan clamps of
118 1 shape and size as specified in existing R.C.C. 112.35 Each
slab including cutting chase and making good.
Cutting out cracks of roof terrace to V-section,
119 1 cleaning out, wetting, grouting with cement and 41 Rmt
sand slurry 1:3 (1-cement 3-sand ) (upto 10 ton)
Cutting out cracks roof terrace to V-Section
cleaning out and filling solidly with a hot
mixture of bitumen and clean dry sand (1:1 by
weight) (up to 10 ton)
Providing & Fixing in position Alluminium
doors with frame using approved quality
anodised extruded alluminium section as
approved by Engg.in charge(Jindal alluminium)(a)
Frame sections 101.6x44.45 mm (b)
Shutter bottom vertical & top section
121 1 Shutter bottom section at 114.3x44.45 mm at (1.37 2,900.00 Sq. M.
kg/mt) Shutter middle section at 100x44.3 wt.(1.37
kg/mt) incl.providing & installing 5 mm thick
approved color Acrylic sheet of standard quality
fixed with glazing chips on upper pannel &
Laminated sheet on lower pannel (wtt.0.13
kg/Rmt) etc.comp.as direction of engg.in
Providing & Fixing in position Fully Panelled /
Partly Panelled Partly Glazed / Fully Glazed
Alluminium doors with frame using approved
quality anodised extruded alluminium
section as approved by Engg. In charge.(Jindal
alluminium )(a) Frame sections 101.6x44.45 mm
b) Shutter vertical & top section 83.5x44.45
122 1 (wt. 1.31 kg/mt.)( at 1.31 kg/mt) © Shutter 4,583.00 Sq.M.
bottom section at 114.3 x44.45mm at ( 1.37 kg/mt
) Shutter middle section at 100x44.3 wt. (1.37
kg/mt ) incl. providing & installing 5 mm thick
Glass of standaed quality fixed / 12 mm thick
Laminated sheet with glazing chips (wt. 0.13 kg/
Rmt) in panels etc. comp. as per Detail Given
& direction of engg.in charge.
Providing & Fixing in position Alluminium
window 2/3/4 track sliding / fix type with
frame using approved anodised extruded
123 1 alluminium section as approved by Engg. In 4,518.00 Sq. M.
charge.(Jindal alluminium) units equivalent.
including P/F installing 5 mm thick clear/tinted
Glass of standard quality etc.comp.
Providing & Fixing in position Alluminium vents
with frame using approved anodised extruded
alluminium section as approved by Engg. In
124 1 charge.(Jindal alluminium) units equivalent Frame 4,218.00 Sq. M.
section of 63.50 x 38.50 mm. (wt.0.68 Kg/Rmt)
incl. Providing & Installing 5 mm thick Glass
of standard quality etc. comp.
Providing and fixing of Ridge flashing for
roof panel shall be made out of 0.5 mm
thick pre coated GI sheet. The Pre coatedsheet
shall be of minimum 240 mpa steel grade
confirming to IS 14246:1995 and shall have zinc
coating of minimum 120 gsm as per
IS:277:1992, 5-7 microns epoxy primer on
125 1 both side of the sheet and polyester top coat 15- 458.85 Sqm
18 micron. The PP GI Sheet shall have
plastic protective guard film of minimum
microns to avoid scratches during
transportation. The ridge shall be fixed to the steel
members by poprivetor self drilling/self
stitching fastners @ maximum 450mm c/c along
length of capping/flashing etc complete .
Supplying and fixing vinyl flooring over the
surface having 1-2 mm thickness as per
directed by engineer incharge etc as
completed (N.S.)
Providing and laying 15mm bamboza
wooden flooring as per architect's drawing
with all necessary details as directed by the
project consultants. Use underlay for better
result as per Detail specifications and directed by
the project consultants. (N.S.) Approved Rate )
Providing and fixing 1.20 Metre high fencing
with 2.0 Metre long M.S. Angle posts 40 mm x
mm x 6 mm and oil painting 3 coats fixed at
2.5 Mt, C/c. with five Horizontan lines and two
128 1 diagonals of galvanised steel barbed wire 320.25 Rmt
weighting 9.38 Kg. per 100 Metre, strained and
fixed to posts with G.I, staples including fixing
the posts in ground with 0.5 M x 0.5.M x 0.5 M.
block in C.C 1:5:10 etc complete.
Renovation and Repairing work in Chainlink
fencing any size and also refixing work incl.
129 1 febrication work with all materails to be 735 Rmt.
painted one coat of primer and twocoats of
paint as directed inline and level. (N.S.)
Constructing a sink (chowkedi) with C.C. 1:2:4,
12 cm. thick over B.B. masonry in C.M, (1:6) in
front and dwarf wall 1.0 Mt. high and 23 cm. thick
cement plaster to masonry / in C.M.1:3) and
cement concrete flooring in 1:2:4: mix
5cm.dia.drain pipe etc.complete.
Constructing a cooking platform 60 cm. width and
70 cm high resting on B.B. Masonry walls 23 cm.
thick in C.M. (1:6) with (i) Fixing or precast
131 1 R.C.C. 1:2:4) 8 cm. thick slab with marble chips 622.65 Rmt
set in C.M. (1:6) (6 mm thick terrazo) with
plastering on exposed faces walls in C.M. (1:4)
Extra rate for using Ready Mix Concrete of
any grade for below ground level to vertical upto
any floor with delivery & suction Pipe & Pump etc.
The rate includes fule, pump operator, skilled
labor, driver etc completed and as per direction of
engineer in charge
P/A Tremix with dewartering machine and
floater machine on constructed CC work for
finishing the surface as per requirement. The
rate including all machinaries, labor, loading,
unloading, transportaion etc complete as per
direction given by engineer incharge.
Carring out timber treatment to all wood work
including drilling holes and spraying oil based
chemical solution on surface of timber work for
termite control including labour and material etc.
complete. Using Chlordene 20 EC. As
Per 6113_part III Consentration Weight1.00 percent
134 1 is recommended one litre chemical emulsion dillute 36.65 Smt
with 9 liter of kerosene precent
concentration. Total dillute concrentration
will be 10 litre inclusive of the litre
chemical emulsion appication 0.75 / Litre
chemical per one Sqmt printed two coat wood
Applying general insecticide pest control
treatment to floors, cup boards etc
including labour material etc. complete.
Using Heptachloride 20 EC. As Per
6113_pests Consentration Weight 0.50 percentis
135 1 recommended one litre chemical emulsion dillute 61.43 Smt
with 39 liter of water will give. Total dillute
concrentration will be 40 litre inclusive of one
litre chemical emulsion appication 0.5 Litre
chemical / Sqm of surface is recommended
Carring out plinth treatment to post construction /
existing structure by spraying chemical solution
for termite control treatment including labour and
material consist ment with I.S. specification.
Using Chlordene and Chior purfiles 20 EC. As
Per 6131_paret-II Consentration Weight on
percentis recommended i.e one litre 20 EC
chemical emulsion with 19 liter give 1%
concrentration inclusive of one litre chemical
emulsion appication attherate of 5 Litre
chemical / Sqm of surface is recommended
Carrying out wall treatment for termite control
including spraying with chemical solution in oil
base (0.5 Lit./Sq.M.) including labour and
material Using Hepachlor concentration
EC. As Per IS.6316_paret-II Consentration by
Weight 0.50 percentis recommended
i.e one litre chemical emulsion dillute with
39 liter go fIS concrentration total dillite
concentration will be 40 litre inclusive of one
litre chemical emulsion appication at the rate of
7.5 Litre chemical / Sqm of surface is recommended
Providing erecting and fixing double coated
Syntex PVC.(ISI) water tank of required
capacity each with all necessary fittings and
connection etc. complete on terrace.
Providing and fixing to wall, ceiling and floor
galvanised Mild steel tubes (Medium grade)
139 of the following nominal bore, tube fitting and
clamps including making good the wall ceiling and
5 (A) 15mm (upto 10 ton) 162.75 Rmt
5 (B) 20mm (upto 10 ton) 205.8 Rmt
2 (C) 25mm (upto 10 ton) 283.5 Rmt
5 (D) 32mm (upto 10 ton) 357 Rmt
2 (E) 40mm (upto 10 ton) 436 Rmt
2 (F) 50mm (upto 10 ton) 569.1 Rmt
Providing and laying in trenches galvanised
mild steel tubes (Midium grade) of the
140 following nominal bore, and tube fitting (Earth
work in trenches to be measured and paid for
5 (A) 15mm (upto 10 ton) 124.95 Rmt
2 (B) 20mm (upto 10 ton) 161.7 Rmt
2 (C) 25mm (upto 10 ton) 232.05 Rmt
2 (D) 40mm (upto 10 ton) 354.9 Rmt
2 (E) 65mm (upto 10 ton) 584.85 Rmt
2 (H) 80mm (upto 10 ton) 750.75 Rmt
Making connection of galvanised Mild steel
distribution branch with galvanised mild steel main
141 5 50 mm to 80 mm nominal bore by 400.05 Each
providing and fixing tee including cutting and
threading the pipes complete.
Providing and fixing to wall ceiling and floor
Kg.F/Cm2 working pressure poluthene pipes of
the following out side Dia. Low densidy,
complete with special falnge compression
type fittings,wall clips etc.including making
good the wall ceiling and floor.
Providing and fixing to wall ceiling and floor
10.0Kg.F/Cm2 working pressure polythene pipes
of the following out side Dia. Low densidy,
complete with special falnge compression
type fittings, wall clips etc. including making
good the wall ceiling and floor.
5 (C) 32mm 77.6 Rmt
5 (D) 40mm 82.95 Rmt
5 (F) 75mm 186.9 Rmt
Providing and fixing cast iron (Spun) Nahni
trap of the following nominal diameter of self
cleaning design with C.I. screaed down or higned
grating including cost of cutting and making
good the walls and floor 100 mm inlet and 50 mm
outlet.(C)100mm dia.
Providing and fixing water closet squatting Pan
(Indian type W.C.Pan) size 580 mm (Earth
145 1 work, bed concrete, foot rest and trap to be 617.4 Each
measured and paid for separately) (A) Vitreous
China. (I)Long pattern = White colour
Provdg. & fixing wall mounted White / Color
Vitreous China European water closet
146 1 with integral P trap of "Cera" - Clair Series or 4,250.00 No.
equivalent incl. seat cover , Chair Bracket etc.
complete as per direction of engg. In charge.(N.S.)
Providing and fixing wsh down water closet
(Europe an type, W.C.Pan) with integral P or S
trap including jointing the trap with soil pipe in
147 1 Cement Mortar1:1 (1- Cement:1-fine sand) 919.8 Each
(Seal and cover to be measured and paid
forseparately) (A) vitreous China Pattern :(i) in
Provdg. & Fixing Flat Back Large Urinal of White/
colour of "Cera" or " Hindware" incl. C.P. Brass
148 1 waste coupline , waste pipe, 1,850.00 No.
pvcconnection etc. Complete.( size
Providing & Fixing Angle cock of " Ess Ess" -
Trend series or equivalent standard make
as approved by engg. in charge all complete.
Providing and fixing 100 mm size P or S trap
for water closet squatting pan including jointing
150 1 the trap with the pan and soil pipe in cement 207.9 Each
Mortar1:1 (1-Cement : 1-Fine sand)(A) Vitreous
China.Pattern in white colour
Providing and fixing wash basin with single hole
for pillar tap with C.I.or M.S. brackets painted
white including sutting holes and making good the
same but excluding fittings. (A) Vitreous China:
(ii) Flat Back wash basin 550 mm x v 400 mm
size.(i) In white colour.
Providing and fixing Kitchen sink with C.I. or M.S.
brackets, painted white including cutting holes
152 1 in walls and making good the same but 2,009.70 Each
excluding fittings. © Vitreous China Sink. (i)
mm x 450 mmx 150 mm size
Providing and fixing 600 mm x 450 mm bevelled
edge mirrror of superior glass mounted on
153 1 mm thick A.C. sheet or ply wood sheet and fixing 609 Each
to wooden pluge with C.P. brass screws and
Providing and fixing chromium plated brass halftrun
154 flush cock of approved quality including
fixing in pipe line etc. complete.(ii) 25mm dia.
Provdg. & fixing White / Color Vitreous china
Counter wash basin with signle hole for pillar tap
of "Cera " - Concord series of 550 x425 mm size
to be fiited in stone counter with necessary
brackets painted white incl. cutting holes and
making good the same .Cost Includes P/F C.P.
brass waste coupline, 32 mm dia fisher union
mm dia. Pillar cock & Angle cock of " Ess Ess"-
Trend series ,32 mm dia. Waste pipe etc.
complete as per dir. of engg. in charge.
Providing and fixing washbasin with single holefor
pillar tap with C.I. or M.S. brackets painted
white including sutting holes and making goodthe
same but excluding fittings.(A) Vitreous
China:(ii) Flat Back washbasin 550 mm x v400mm
size. (i) In white colour.
Providing & Fixing S.S.304 Grade Sink of
Nirali / Krishna or Equivalent Make for
Kitchen Platform of size : 24":x18" as per
Direction of engg. In charge
Providing and fixing C.P. brass towel rail
comlete with C.P.brass brackets fixed to
wooden plugs with C.P. brass scews.(B) 600mm
Providing and fixing 600 mmx120 mm glass
shelf with C.P. brass bracket and guard rail
complete mixed to wooden plug with C.P.brass
Providing and fixing toilet paper holder. (A)
Providing and fixing screw down bib taps of
161 following size. (A) Brass screw down bib tap
polished bright.
1 (i) 15mm dia. 198.45 Each
1 (ii) 20mm dia. 248.85 Each
Providing and fixing screw down bib taps of
162 following size. (B) Brass chromium plated screws
1 (i) 15mm dia. 218.29 Each
1 (ii) 20mm dia. 250.97 Each
Providing and fixing screw down bib taps of
following size. © Gun metal screw down bib tap.
1 (i) 15mm dia. 185.6 Each
1 (ii) 20mm dia. 207.78 Each
Providing and fixing pillar tap, capstan head,
164 screw down high pressure with screws, shanks
1 (i) 15mm dia. 360.7 Each
1 (ii) 20mm dia. 414.39 Each
Providing and fixing Gun metal check or non-
return fullway wheel valve.
1 (i) 15mm dia. 218.29 Each
1 (ii) 20mm dia. 238.13 Each
1 (III) 25 MM DIA 491.44 Each
1 (E) 40mm dia 775.09 Each
Providing and fixing chromium plated brass
166 half trun flush cock of approved quality including
fixing in pipe line etc. complete.
1 (i) 20mm dia. 297.66 Each
1 (ii) 25mm dia. 308.17 Each
1 (iii) 32mm dia. 322.18 Each
Providing and fixing Urinal or approved
quality including conecting the Urinal with
167 1 waste pipe , tap etc.complete. (A) White earthen 690.9 Each
ware flat back or corner type size 430mm x
Providing and fixing Urinal of approved
quality including connection with trap and
168 1 with integral longitudinal flush pipe. (A) Squating 1,023.75 Each
plate pattern white earthen ware 550mm x
Providing and fixing chromium plated, bottle
169 1 trap with necessary couplings of approved quality 328.01 Each
for wash basin.
Providing and fixing ball cock ofapproved quality
as directed. (A) Copper Metal (i) 25mm dia.
Providing and fixing ball cock of approved
quality as directed. (B)Abonite (i) 25mm dia.
Filling with good Quality thor as and where
directed by the Architect / Engineer-in-charge,
172 1 in sunk in layers of 15 cm. thickness, including 3,850.00 Cmt
watering, ramming well etc. complete, as
directed by the Architect / Engineer-in-charge .
Providing laying and jointing in true line and level
mm dia. U.P.V.C. Pipe (SCH-40) for cold
water including fittings make PRINCE/
SUPREME/ ASTRAL/ FINOLEX or equivalent as
approved by Engineer In Charge. Pipe shall be
173 1 fixed on the wall with the help of clamp at 84.87 Rmt
every two metre C/C or shall be concelled as
directed including necessary fittings etc.
including testing of pipe and joints and fixing the
same with solvent, including cost of all
materials.adhesive
Providing laying and jointing in true line and level
mm dia. U.P.V.C. Pipe (SCH-40) for cold
water including fittings make PRINCE/
SUPREME/ ASTRAL/ FINOLEX orequivalent as
approved by Engineer In Charge. Pipe shall be
174 1 fixed on the wall with the help of clamp at 107.29 Rmt
every two metre C/C or shall be concelled as
directed including necessary fittings etc.
including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of
Providing laying and jointing in true line and level
mm dia. U.P.V.C. Pipe (SCH-40) for cold
water including fittings make PRINCE/
SUPREME/ ASTRAL/ FINOLEX or equivalent as
approved by Engineer In Charge. Pipe shall be
175 1 fixed on the wall with the help of clamp at 139.2 Rmt
every two metre C/C or shall be concelled as
directed including necessary fittings etc.
including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of
Providing laying and jointing in true line and level
mm dia. U.P.V.C. Pipe (SCH-40) for cold
water including fittings make PRINCE/
SUPREME/ ASTRAL/ FINOLEX or equivalent as
approved by Engineer In Charge. Pipe shall be
176 1 fixed on the wall with the help of clamp at 173.03 Rmt
every two metre C/C or shall be concelled as
directed including necessary fittings etc.
including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of
Providing laying and jointing in true line and level
mm dia. U.P.V.C. Pipe (SCH-40) for cold
water including fittings make PRINCE/
SUPREME/ ASTRAL/ FINOLEX or equivalent as
approved by Engineer In Charge. Pipe shall be
a 1 fixed on the wall with the help of clamp at 228.61 Rmt
every two metre C/C or shall be concelled as
directed including necessary fittings etc.
including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of
Providing in line level plumb, fabricating
and fixing three row horizontal barbed wire
fencing and punched tape concertina coil of
turns per meter of 610 mm dia fixed with clips on
top of the angle iron posts. The punched tape
concertina coil having sharp barbs at every 25 mm
spacing shall be 0.5 mm thick and 19 mm width
177 1 and weighting 13 kg/100 mt. (Average) as per 390 Rmt
manufacture's specification. The rate shall
also include providing and fixing 1.20 mt.total
long MS angle 40 x 40 x 6 mm @3.00 mt.c/c
spacing embaded in RCC column, angle posts
shall be painted with one coats of red oxide and two
coats of enamel paint of approved quality at top
Fixing sun film for protection sunlight in black or any
178 1 colour as as directd by engineer In Charge.(Market 850 Smt
Providing & Fixing 3 mm thick F.R.P.sheet of
Approved Quality & Color / Pattern as per
Consultant's design also includes required
fabrication structure in the grid of 2'-0x2'-0 size
using hollow pipe of16 gauge & size 2"x1" &
179 1 1"x1" ,G.I. & Bitumen Washers, Silicon paste 1,930.00 SqM
application for fixing the sheet . Rate also
includesnecessary bending, cutting, labor charges
, Zinc Primer coat & Two coats of oil painting of
color as approved by consultants & making
good the wall. (N.S.)
Providing 2 mm thick F.R.P. Gutter with necessary
M.S. Supporting Brackets. (N.S.)
Hiring charges for J.C.B.machine inclduing cost
181 1 of fuel, operator, dirver etc.. ( 12 hours 600 Hrs.
sift day/night) (N.S.)
To provide tractor with hydraulic trolley, driver,
Nos. of Labor with all tools like bucket drum,
showels, trikam, pavadas, etc,, to
182 1 carryout different works during monsoon for 12 3,000.00 No.
Hrs. Shift. Work shall be carried out as per
the instrucitons of Engineer In-Charge.No extra
charged shall be paid for night shift.
Roller Blind Providing and fixing Roller Blind
curtain fixed on window level on wooden
batten and curtain lift with cotton thin rope,
183 1 make of aerolax or equivalent design and 3,285.00 Smt
colour as per instruction by engineer – in –
Charge with necessary hardware fitting, material
and labour etc complete.
Providing & Fixing Door closer - complete of
184 1 Approved make to wooden / Aluminium Doors as 560 No.
per direction of engg. In charge.
Providing and fixiing M.S. Fan clamps type 1 of
mm dia M.S. bar bent to shape with hooked ends of
185 1 R.C.C. slabs during laying incl. painting the exposed 83.16 No.
protion of loops, all as per standard design
Providing cement vata (10cm. x 10 cm. size) quarter
186 1 round in cement mortar 1:1 including neat cement 18.69 Rmt
finishing, watering etc. complete.
Making Water connection from exi.Muni. Water line
Providing and applying fibere reinforced
cementitious micro concrete work in
cellings and beams incl.mixture of
CEMSCREED HM (F) fair mate company
material, FBR bonding agent material with
water in suItable proportion anti corrosive
treatment on exposed beam,celling steel bars with
safeCore R incl.all kind of labour
etc.comp.including three coat of white
wash.(Approved Rate)
Providing and Fixing 1 H.P. Electrical monoblock or
submarcible water pumps withmotor and required
cable and switch board of approved brand and
make etc.comp.as directed.
.Providing TMT Bar FE 415 reinforcement for R.C.C.
5 work including bending, binding and placing in 62.61 Kg.
position complete up to floor two level (up to 10 ton)
ProvidingTMTBarFE500/500Dreinforcement for
R.C.C.workincluding bending,binding and placing in
b 5 position complete upto floor two level placing in 71.71 Kg.
position complete upto floor two level placing in
position complete upto floor two level(upto 10 ton)
Providing and fixing 30mm thick solid both side
prelam PVC door shutter (sintex door-equivalent)
with necessary alluminium fitting with EL-7 section
Conveyance charge of Earth,Lime, Murrum, building
rubbish earch manure or sludge and excavated rock
and fly ash,aggregate of any kind etc.comp.upto
Providing and laying polished granite stone slab
mm thick in risers of steps, dedo and pllars laid on
193 2 10 mm thick cement mortar 1:3 (1 cement:3 coarse 2,690.00 Smt
sand) and jointed with gray cement slurry including
rubbing & polishing etc.complete.
Wall panelling with 12 mm MDF fixed to existing
alluminium framing and making grove as per
design and finished with royal plastic paint as per
instruction of engineer incharge. (N.S.)
Providing and laying 15mm bamboza
wooden flooring as per architect's drawing
with all necessary details as directed by the
project consultants. Use underlay for better
result as per Detail specifications and directed by
the project consultants. (N.S.) (Approved Rate )
Applying two coats of Birla
(whitecementbased) or Asian (acryliclapy-
putty) or equivalent & two coats of primer of
approved brand and manufacture on new wall
surface to give an even shade including thoroughly
brushing the surface free from mortar dropping
Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to
197 50 give an required shape evenshade after thoroughly 75.6 Sq.M.
brushing the surface to remove all dirt, and remains
of loose powdered materials.etc complete
198 1 High Back Chairs for vip Lounge 6,750.00 Each
:Supplying and installation of “Revolving High
Back” chairs. The chairs must be
robust, ergonomically designed and
comfortable. Seat & Back Assembly -1.2
cm thick hot pressed plywood and upholstered
with Fabric and Molded Polyurethane
Foam with PVC lining all around. Back
foam is designed with contoured lumber
support for extra comfort. Chairs Dimension -
Width 55 cm, Depth 60 cm Height 103 –
cm, Seat Height(SH) 44 – 56.5 cm. The
Polyurethane foam should be molded with density
45+/-2 kg/m3 & Hardness = 16+/-2
kg/m3onHampden machine at 25%
compression. Arm Rest - One-piece Black
integral skin polyurethane with 50-70 shore. `D’
Type Handle and reinforced with MS insert.
Centre Pivot Mechanism - 360o revolving type
17o maximum tilt on pivot at centre Tilt tension
adjustment. Upright locking. Telescopic
Bellow Assembly - The bellow should be 3 piece
telescopic type and injection molded in black
Polypropylene. Hydraulic Height Adjustment - The
Hydraulic height adjustment should be provided with
adjustment stroke of at least 10cms.
Pedestal Assembly - The pedestal should be
injection molded in Black powder coated MS
on and fitted with 5 nos. twin wheel castors.
Twin wheel castors - The twin wheel castors
should be injection molded in Black Nylon
The complete item as per architect /engineer in
Providing and supplying Medium Back Chair
for Control room MODEL LIKE HOF OCT
172 Revolving synchro tilting mechanism
based chair with gas lift for adjustable height
and medium curved back with seat and back PU
molded cushion with MS pipe frame structure
and white foam layer for seat and molded PU
foam. White foam layer for back covered with
199 2 thick cloth and draped with cloth of 5,500.00 Each
approved shade. (min. of Rs.150/meter). 5 legged
revolving molded nylon chair base with good
quality of PU castors with 2 years replacement
guarantee. The chair to have wide polyurethane arm
rest of approved shape. Complete chair should be
in suitable shape. Rates to be inclusive of
all taxes and free delivery at site. The complete
item as per architect /engineer in charge
Providing and fixing storage, entire unit to be
made from 19 mm th. and 12mm Ply with
1.0mm &. 8 mm th. Laminate. Shelves to be
made from 19mm Ply with both side laminate.
Rate shall include necessary approved
mortise locking systems, S S Handle pair 2" to
4" height and necessary hardware. Over all
storage to be completed with necessary hard
ware and accessories completed as per
drawing and design as given by Architect.
Existing storage repairing and veneer on top
Providing and fixing of Louvers On Existing d.c
panel Providing and fixing 35mmthk. Louvers
shutter made up from Ghanateak frame with
135x75mm and shutter frame as per detail and
fixing aluminum louvers which is specified
readymade powder coated aluminum grill
panel louvers .and applying melamine spray polish
all exposed wood work. Overall door to be
completed with necessary hardware and
accessories completed as per drawing and
design as given by Engineer In charge/Architect.
Providing and fixing flush door shutters, solid
core construction with frame of first class
hardwood with cross board and face veneer or
plywood face panels, with both side 1 mm
laminate finishing including anodized aluminum
butt hinges with necessary screws. Decorative
type and pine wood core anodized minimum
no 150 mm long aluminum butt hinges in flush
door shutters with 2 no of brass holdfast
mm long 1 no brass tower bolt 250 mm long and
two no of 150 mm long brass door handle .
Decorative both side laminated Flush door 35 mm
thick. with frame of 10 cm x 7 cmt Indian teak
wood frame including all necessary fitting
fixtures hardware screw and adhesive etc fixing
up to all lead and lift height up to 45 mtr from GL
etc complete as per direction of engineer in
P/M/F chainlink jali 8'x4' size as per details sketch &
instructionof engineer in charge same as lal darwaja
garden pattern consisting of 3'dia. M.S black pipe 'A'
class 5'4" ht. fixed at 8'9" c/c in C.C 1:2:4 block of
9"x9"x9" size chain link jali of size 2"x2"x10 gauge
203 10 fixed in 35x35x5 mm MS angle frame 8'x4' size with 1,230.00 Rmt
MS flat of size 25x3 mm welded jali etc.comp.The
jali is to be welded to MS pipe with MS flat as
instruction given.The M.S pipe and the M.S angle
frame are to be painted one coat of primer and two
coats of paint as directed in line and level. (N.S)
Providing & Fixing masonary wall with porbandar
lachiya stone with well dressed grooveas per
directed by engg.in charge for foundation, plinth or
super structure level (above plinth level upto floor
204 two level) in cement mortar 1:5 (1-cement : 5-fine
sand) incl.pointing the joint with white cement and
yellow oxide powder in proportion to match stone
colour the joints should be thread grooved as per
exi. lake stone pitching apperance
(A) stone masonary wall/stone dressed single faced
(size 15"x8"x9")
2 (B) stone coping (size 15"x8"x4") 510 Rmt
2 (C) stone coping (size 15"x8"x9") 790 Rmt
2 (D) stone column (size 15"x15") 10,710.00 Cmt
2 (E) stone column top (size 20"x20"x9") 685 No.
Supplying and fixing of 300 mm-L x 15 mm-B x
380 mm-H Kerb block for Footpath in M-20
grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timbaor equivalent
quality for pre-cast blocks,
reasonablyexposed finish/ formwork
mould with well equippedwith vibratory system
for kerb stones of approved design including
curing, etc. complete, including thecost of
formwork etc. complete. The rate shall also
include necessary cutting of asphalt, fixing
the Kerbstones in line and level on 5 cm thick
sand bedding withnecessary
equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of
thekerbstones. Filling of zari alone the sides of the
kerbstone fixed with Bituminous concrete
Bituminousconcrete / C.C. mixed in proper
position to flush withthe road surface as
directed by Engineer in change to form a
portable mixture.a) Laying on 5 cm thick Sand
Providing and Laying of Rubber Moulded Paver
Block Grey/Coloured 60 mm thick, M-35 Grade of
any size ; shape (Usually Uni-Paver Blocks) using
black trap good quality aggragate of 20 mm nominal
size for footpath, parking areas, service lanes
and other areas as mentioned in the
drawing/instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate
providing and laying paver blocks as per required
grading and specification. The paver block shall be
206 2 mechanically compacted. The work of paving 501.6 Smt
blocks shall be executed in line and level by skill
mason of flooring work only. It should be laid in such
a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it
should be cut by machine only and carting. The
finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel
or such type of materials shall not be allowed for
production. Laying on 5cms thick sand beddding
Provoding and fixing flush door shutters, solid core
construction with frame of first class hard wood with
cross board and face veneer or ply wood face
panels, including anodised alluminium butt hinges
with necessary screws. (B) Non- decorative type
and block board core anodised alluminium butt
hinges in flush door shutters (2) 35 mm thick.
Labour work for fixing any kind of paving with
cement pointing in CM 1:2, including watering,
ramming etc comp. as dir.For pavement
I) Laying on Sand bedding as per requirement to fix
the C.C.Block / Nibhada Stone in Line & Level
Box type metal letters forming composite box made
from 1mm thick stainless steel plate of grade
having brush finish of following font size to be fixed
at Main Gate in english and or Gujrati and including
fixing charges approved before fixing by clent /
A 2 400mm high 1,000.00 Nos.
B 2 300 mm high 750 Nos.
C 2 230 mm high 565 Nos.
Providing and fixing false ceiling at all height
including providing and fixing of frame work made of
special sections, power pressed from M.S. sheets
and galvanized with zinc coating of 120 gms/sqm
(both side inclusive) as per IS : 277 and consisting
of angle cleats of size 25 mm wide x 1.6 mm thick
with flanges of 27 mm and 37mm, at 1200 mm
centre to centre, one flange fixed to the ceiling with
dash fastener 12.5 mm dia x 50mm long with 6mm
dia bolts, other flange of cleat fixed to the angle
hangers of 25x10x0.50 mm of required length with
nuts & bolts of required size and other end of angle
hanger fixed with intermediate G.I. channels
45x15x0.9 mm running at the spacing of 1200 mm
centre to centre, to which the ceiling section 0.5 mm
thick bottom wedge of 80 mm with tapered flanges
of 26 mm each having lips of 10.5 mm, at 450 mm
centre to centre, shall be fixed in a direction
perpendicular to G.I. intermediate channel with
connecting clips made out of 2.64 mm dia x 230 mm
210 2 long G.I. wire at every junction, including fixing 850 Smt
perimeter channels 0.5 mm thick 27 mm high having
flanges of 20 mm and 30 mm long, the perimeter of
ceiling fixed to wall/partition with the help of rawl
plugs at 450 mm centre, with 25mm long dry wall
screws @ 230 mm interval, including fixing of
gypsum board to ceiling section and perimeter
channel with the help of dry wall screws of size 3.5 x
25 mm at 230 mm c/c, including jointing and
finishing to a flush finish of tapered and square
edges of the board with recomme-nded jointing
compound , jointing tapes , finishing with jointing
compound in 3 layers covering upto 150 mm on
both sides of joint and two coats of primer suitable
for board, all as per manufacturer’s specification and
also including the cost of making openings for light
fittings, grills, diffusers, cutouts made with frame of
perimeter channels suitably fixed, all complete as
per drawings, specification and direction of the
Engineer in Charge but excluding the cost of
Providing and fixing wall acoustical paneling using
ecotone Slato/ Anutone slato or equivalent Acoustic
Panel make Slats L-16 of size
128mmx2430mmx16mm thick up to 2400mm high
as per the following specification :-Slats L-16- 2mm
@16mm, 32 x 128 x 2430 mm high grade Pine
wood base Medium Density Fiber acoustic boards
with Tongue & Groove Edge,2mm slot perforation @
16mm centre, slates perforations, The acoustic
should be furnished with a Black absorbent felt
backing with an airflow resistance of 330- 460 Ns/m³
(DIN 53887),wood practical core,NRC : should be
Up to 0.75,should meet the safety requirements of
EN 14190. Fixing :- Sound Strut CC18 screw fixed
horizontal/vertical to wall at every 600mm c/c. Metal
cleat can be fixed on top edges of Sound Strut
CS55 fixed directly by stamping to the CS55 and
IC91 which is screw fixed directly to the wall where
ever required with a backing black color fabric as
approved by Architect and as specified including all
accessories, material & labor complete as directed
by Architect / Engineer.
Providing & Fixing SPEED BUMP - #2 No (1 black,
1 yellow) 350 x 500 x 50 mm, Size per color End
Cape 350 MM x 175 MM x 50 MM TOP DESIGN -
Lining Top flat ANTI SKID PATTERN FOR GRIP
COLOUR :- YELLOW & BLACK BODY MATERIAL
:- MODIFIED THERMOPLASTICS (Polymer
Rubberized ) • ECO FRIENDLY RECYCLE
RUBBER Packing :- 4 pcs/ woven Bag Load
Capacity :- 20 MT Fitting ( Fixing on TRAKE) :-4
holes & END CAPE :- 2 HOLE HEX Bolts with
Washer Epoxy for Bolt Fitting etc. complete as
directed by EIC .
Providing & Fixing in position 24 MM exposed grid
suspension system with “P “ Grid profile false ceiling
system using 600 MM X 600 MM ecotone/anutone
or equivalent make Glass Fiber Ceiling Tiles having
tegular edges & 0.90 NRC value and approved
surface design (with NRC of 0.90) and edge profile
Tegular placed in a suspended grid of size 600 MM
X 600 MM made from hot dipped GI Steel sections,
rotary stitched, main tee of size 24 X 42 X 3000 MM
X 0.40 MM thickness suspended at every 600 MM
c/c along length of ceiling with 4 MM dia, Pre-
straightened G.I.Wire with necessary level adjusters
& intermediate cross tees of size 24 X 38 X 600 MM
X 0.40 MM thickness shall be inserted in to slots
between the main tees at 600 MM centers in
direction vertical to the main tees, where in the main
tees are resting on the periphery on wall angles of
size 24 MM X 24 MM X 3000 MM X 0.40 MM
thickness including providing necessary openings
for light fixtures, diffusers etc.
Providing and fixing of Roller blind curtain/blackout.
The fabric shall be woven from formulated platisol
extruded over a polyaster yarn.The fabric shouldl be
214 1 weaved to provide subtle view of the side of the 2,610.00 Smt
blind and should offer elimination of glare and
sunlight radiance upto a minimum of 80%.The fabric
shall be flame retardant.
Providing and applying Texture Paint (Rustic Finish)
on external plastered surfaces, pattern as per
sample approved by the Architect. including
preparing surface, using roller to get approved
texturised surface. Job to include making required
215 1 surface preparation, to receive Texture paint finish 425 Sq.m
etc. All complete as per detail drawing, as specified
and as directed by Architect / Consultant / Project -
In - Charge. The rates shall be inclusive of
Scaffolding, all material, labour etc. complete. as
directed by EIC.
Providing and fixing PVC/Gpsysum plain colour
false ceiling with grid type with aluminium
frame from gypsteel, fastners ,props, Finishing as
per architectural drawing allowing openings
for A.C. Diffusers, Light/Electrical Points etc
–complete, Prior to fixing on frame.(Brand :
Anutone or equivalent ) (N.S.) or as directd by
engineer In Charge.
Provdg. & laying S.W. Gully trap with brick masonry
chamber & water tight G.T.Stone including fixing of
covervSquare mouth trap 100 mm x100 mm size P-
Providing cement vata (10cmx10cmsize) quarter
218 2 roundin cement mortar 1:1 including neat cement 18.69 Rmt.
finishing, waterin getc. complete.
Providing and laying (to level or slopes) and jointing
with stiff mixture of Cement Mortar in proportion 1:1
Salt glazed stoneware pipes including testing of
pipes and joints complete.(A) 100mm dia.
Providing and laying (to level or slopes) and jointing
with stiff mixture of Cement Mortar in proportion 1:1
Salt glazed stoneware pipes including testing of
pipes and joints complete.(B) 150mm dia.
Constructing brick masonry chamber for
underground C.I. Inspection chamber and bends
with bricks having crushing strength not less than
35Kg/Cm2 in C.M. 1:5 C.I. cover with frame (Light
duty) 455mm x 610mm intenal dimensions total
weight of cover with frame to be not less than 38Kg.
(Wt. of cover 23 Kg.) and Wt. of frame 15Kg. )
221 1 (R.C.C. top slabe with 1:2:4 mix (1-cement :2- 2,566.20 Each
coarse sand :4-graded stone aggregate 20mm size)
foundation concrete 1:5:10 inside plaster 15mm
thick with cement mortar 1:3 finished smooth with a
floating coat of neat cement on walls and bed
concrete etc. complete.(i) Inside dimensions
455mmx 610mm and 450mm deep for single pipe
Constructing brick masonry chamber for
underground C.I. Inspection chamber and bends
with bricks having crushing strength not less than
35Kg/Cm2 in C.M. 1:5 C.I. cover with frame (Light
duty) 455mm x 610mm intenal dimensions total
weight of cover with frame to be not less than 38Kg.
(Wt. of cover 23 Kg.) and Wt. of frame 15Kg. )
222 1 (R.C.C. top slabe with 1:2:4 mix (1-cement :2- 3,029.95 Each
coarse sand :4-graded stone aggregate 20mm size)
foundation concrete 1:5:10 inside plaster 15mm
thick with cement mortar 1:3 finished smooth with a
floating coat of neat cement on walls and bed
concrete etc. complete.(i)Inside dimensions 500mm
x 700 mm and 450mm deep for pipe line
with one or two inlets.
Providing, supplying and fixing precast C.C. blocks
(M-20) edge kerb having size of 75 x 300 x 300 mm
depth and as per design conveying it to the site,
jointing into C:M 1:3 and racking out the joints incl.
necessary excavation of asphalt, soil
etc..completed.
Constructing a cooking Sandwich platform 60 cm.
width and 70 cm high resting on B.B.Masonry walls
224 1 23 cm.thick in C.M.(1:6) with (ii) Fixing black 754.95 Rmt.
Granitee 30mm thick laid on precast R.C.C. (1:2:4)
slab with plastering on exposed faces of wall in C.M.
(1:4) etc complete.
Providing and fixing hard drawn steel wire fabric
75mm x 25mm mesh or weight not less than
kg. per Sq.M. to window frames etc. including60 x
20mm beading of teak wood.
Providing & fixing 15 cm wide chicken mesh jali with
nails & then application of 15 mm plaster on
R.C.C.& masonary joints as per dir.of engg.in
Providing and laying cement concrete flooring
1:2:4 (1-cement : 2-coarse sand : 4-graded stone
227 2 aggregate 20mm nominal size) laid in one layer 232.05 Smt.
and finished with a floating coat of neat cement.
(A) 50mm thick.
Providing and constructing, Underground (U/G)
water tank of specified capacity, on specified
location, for all depths, in controlled CC of M-200
grade with bottom slab, top slab and RCC walls,
including cost of form work and
reinforcement,with inside and outside plaster in
228 10 CM 1 :3 and water proofing treatment as per IWP 6.5 Litre
specification,including injection, grouting, etc.
complete. The rate includes for providing and
fixing two nos. 0.6m. x 0.6 m. size medium duty CI
manhole cover/s at top, including wash out pipe
line and inlet and outlet connections etc.
Providing & Fixing of Armstrong Mineral Fibre
Acoustical Suspended Ceiling System with Dune
(Bevelled Tegular) Edge Tiles With Armstrong
15mm Exposed GRID. The tiles should have
Humidity Resistance (RH) of 99%, NRC 0.5, Light
Reflectance ≥85%, Thermal Conductivity k =
- 0.057 w/m K, Colour White, Fire Performance
UK Class 0 / Class 1 (BS 476 pt - 6 &7) in module
size of 600 x 600 x 15mm , suitable for Green
Building application, with Recycled content of
32%. The tile shall be laid on Armstrong
Silhouette profile grid system with 15mm white
flanges incorporating a 6mm central reveal in
white/black colour and with a web height of
45mm and a load carrying capacity of minimum
15.68 Kgs/M2 & minimum pull out strength of
100 Kgs.. Silhouette, Main Runners & Cross Tees
to have mitred ends & “birdsmouth” notches to
provide mitred cruciform junctions. The T
Sections have a Galvanizing of 90 grams per M2
and need to be installed with Suspension system
of Armstrong make. Warranty Certificate and Test
Reports for NRC, CAC and Fire rating shall be
provided by Vendor.
Mineral Fibre Acoustic Modular Ceiling Tile
should be GREENPRO certified and qualifies as
GREEN PRODUCT certified by CII Green Products
and Services Council.INSTALLATION: To comprise
main runner spaced at 1200mm centres securely
fixed to the structural soffit using Armstrong
suspension system (specifications below) at
1200mm maximum centre. The First/Last
Armstrong suspension system at the end of each
main runner should not be greater than 450mm
from the adjacent wall. Flush fitting 1200mm
long cross tees to be interlocked between main
runners at 600mm centre to form 1200 x 600 mm
module. Cut cross tees longer than 600mm
require independent support. 600 x 600mm
module to be formed by fitting 600mm long flush
fitting cross tees centrally between the 1200 mm
cross tees.Perimeter trim to be Armstrong wall
angles of size 3000x19x19mm, secured to walls at
450 mm maximum centres. Installation should be
carried out as per Armstrong recommended
procedure.ARMSTRONG SUSPENSION SYSTEM
accessories manufactured and supplied by
Armstrong World Industries consisting of M6
Anchor Fasteners with Vertical Hangers made of
Galvanised steel of size 26 x 26 x 25 x 1.2mm with
a Galvanised Thickness of 80gsm, A pre
Straightened Hanger wire of dia – 2.5 mm of
m length., thickness of 80gsm and a tensile
strength of 344-413 MPa, along with Adjustable
hook clips of 0.8mm thick, galvanised spring steel
for 2.68 mm with a minimum pull strength of
kg. The adjustable clip also consists of a 3.5 mm
aquiline wire to be used with the main runner.
Providing and fixing PVC Printed pain colour false
ceiling with grid type with alluminium frame
consisting of 600mm x 600mm 3mm thick plain
PVC sheet used as panel insert in a frame work
made using anodized alluminium T section of size
1 x 1 (235 x 25mm, 19 gauge or 1 mm thick) in
square pattern of grid sizes of 2 x 2 (600 x
600mm) The alluminium frame work is supported
from the cceiling with the help of G.I. hook and
G.I. wire/6mm M.S. rods of required sizes to
maintain proper level etc. The aluminium frame
work is supported on side wall with the use of
alluminium L section of size 1 x1 (25 x 25mm)
angles etc. complete as per direction of Engineer
in charge. Manufactures specification and
Providing and supplying of labour for necessary
manual excavation, cleaning, Shifting of Material
231 1 Or any other, or for any other work as directed by 450 No
Engineer In charge. The Rate includes Handcart
A 1 Mukadam/supervisior/karigar 425 No
B 1 Fitter/Plumber/Mason 800 No
C 1 WELDER/ Gas cutter at Day /night 800 No
Supplting of welding machine / gas cutter
D 1 including cost of welding rods/gas, 1500 No
Transportation, including carting from site to
E 1 Mazdoor at Day Male/Female 348.2 No's
Constructing Manhole with R.C.C. top slab in
1:2:4 mix (1-cement :2-coarse sand : 4-graded
stone aggregate 20mm nominal size) foundation
concrete 1:3:6 mix (1-cement : 3- coarse sand :6-
Brick bats 40 + 50mm size) inside plastering
15mm thick with Cement Mortar 1:3 (1-Cement :
3-coarse sand) finished with a floating coat of
neat cement and making channels in cement
concrete 1:2:4 mix (1-Cement :2-Coarse sand :4-
stone aggregate 20mm nominal size) finished
smooth complete including curing and festing (i)
Inside size 900mm x 1200mm and 1.5M.
deep including C.I. cover with frame size 560mm
diameter total weight of cover and frame to be
not less than 128 kgs. (Wt. of cover 64 Kg. and
Wt. of frame 64 Kg.)(A) With 230mm thick walls
of brick msonry using brick having crushing
strength not less than 35Kg./ Sq.cm. in Cement
Mortar 1:5 (1- Cement: 5- Coarse sand) (2) B type
depth 1.50 Metre for 150mm diameter sewer
Supplying electric breaker machine for RCC slab
or asphalt demolishing work on site by using
operator, fuel, power supply etc.complete as
directed. (no payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
down work) (Based on Previously approved rate
CatchPit Jali Fixing P/F FRC catch pit jali with
frame 600mm x 600mm clear opening etc. comp.
As directed by engineer in charge. (Based on
Central Store Rate)
Providing and fixing concealed center point to
wall ceiling & floor CPVC (SDR 13.5) PIPE
having National Sanitation Foundation (NSF) seal
for potable water of following dia. nominal
bore tube fittings and clamps including making
good the wall, ceiling and floor etc. complete.
A 5 15 MM DIA 137.55 Rmt
B 2 20 MM DIA 179.55 Rmt
C 2 25 MM DIA 228.87 Rmt
D 2 32 MM DIA 317.9 Rmt
E 2 40 MM DIA 426.36 Rmt
F 2 50 MM DIA 655.29 Rmt
Providing and fixing cast iron steps of size 500mm
236 1 x 150mm x 22.5mm and painting with two coats 108.15 Each
of Anti-corrosive paint etc. complete.
Supplying and fixing C.I. cover 300mm x 300mm
237 1 without frame for Gulley trap (Standard pattern) 569.97 Each
te weight of cover to be not less 4.53 Kg.)
Providing and fixing to wall ceiling and floor
10.0Kg.F/Cm2 working pressure polythene
pipes of the following out side Dia. Low
densidy, complete with special falnge
compression type fittings, wall clips etc.
including making good the wall ceiling and floor.
2 (F) 75mm 186.9 Rmt
Providing and fixing sheet glass, selected quality
(Type-C) bedded in putty and fixed with
239 2 wooden beading including the cost of wooden 811.65 Smt
beadings of first class teakwood and necessary
cutting of glass. (2) 6 mm thick.
Providing and fixing rough cast wired glass, 6mm
thick bedded in putty and fixed with
240 2 wooden beading including the cost of wooden 659.58 Smt
beadings of Indian teak wood and necessary
cutting of glass. (C) Wired - figured glass
Net Amount in Rs.
Contractor’s Quoted Rate: -
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl.City Enginee
Date: (Central Zone)
As per account department(A.M.C.) circular no. 56, Dt.19/09/2016 Bank guarantee of
said work must be of Ahmedabad city branch, which mentioned as bellow.
(A) Guarantee issued by following bankswill be accepted as SD/EMD on
permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period
up to March 31,
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(2) RBL Bank (The Ratnakar Bank Ltd.)
(3) IndusInd Bank.
(4) Karur Vysya Bank.
(6) FEDERAL Bank.
(7) SOUTH INDIAN Bank.
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Mehsana Urban Co-Operative Bank Ltd.
(4) Nutan Nagarik Sahakari Bank Ltd.
(5) Saurashtra Gramin Bank.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SPECIAL CONDITION OF CONTRACT
1.0 The Contractor shall have to maintain all required registers for quality control, material management
and progress of the work as per the AMC's prevailing circulars and as directed by engineer- in-charge
on daily basis.
1.1 Contractor has to manage proper storage of all the materials.
1.2 Contractor has to use good shuttering material for the project.
1.3 Contractor has to take all risk policy & workman compensation policies of the project & should be
effective up to handing over the possession. Incase of any Incident i.e. fatal accident that occurs at site,
complete responsibility will be of the Contractor.
1.4 Contractor is responsible for all liasioning for seeking all the permission required during the
1.5 Municipal Commissioner reserves the rights to reduce / increase the scope of work up to any extent
without assigning reason thereof and the contractor has to execute the BOQ items at his tender rate
1.6 All rates quoted by the contractor to be inclusive of all applicable taxes (GST).
1.7 The Contractor shall make his own arrangements for the engagement of all staff and labour, local or
other, and for their payment, housing, feeding, transport and other facilities according to prevailing
1.8 AMC may at its discretion no coplains/no work for a period, single or multiple works at any given
time. once the work is given by SMS, Phonecalls, Whatsapp, Letter; the contractor has to attend the
work within 24 hours. Failure of the same shall invite penalty of 10,000/- per occurance. Repeated
failure of more than 3 times, the contractor shall be blacklisted. No further claim shall be entertained
and the work shall be carried out of current market rate and supervision charges of 27% at the risk
and cost of contractor after the due date of intimation.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different
sites simultaneously. Contractor's having labour force available during festivals shall only apply.
Contractor can not stop the work due to on availably of labour force. In case progress is delayed,
contractor shall be penalized 0.1% of Tender amount per day for work done after time limit, maximum
up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor
shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by the
Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean as
a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be taken
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is in
the form of a designation containing the number of the specification of the material and prefix 'M' e.g.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used in
the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall
be stone at site of work in a systematic manner. Materials shall be stored in such a manner as to
prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation of their
quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site
of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers and
in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works during execution shall be kept in sufficient numbers and in good
working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
29. All necessary safety measures and precaution (including those laid down in the various relevant Indian
Standards) shall be taken to ensure the safety of men, materials and machinery on the works as also of
the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days (120)
from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank Guarantee, pay
order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (Central Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Monthafter the order to start the works. Progress of work should be in
proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor
shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be
responsible for any damage to public. If any incident happen, during the execution of work. In case of
dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor
shall have to give site clean of all rubbish during the work and at the time of completion of work and hand
over the site with final finishing of the work as directed. All the rejected materials shall be removed from
site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and
he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for
extra rate for subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders
for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own
during the period. If any tenderer withdraw or makes any modifications or addition in the terms and
conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation shall
without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and black
list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the
penalty of Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable to
the contractor. Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable.
Form B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat
booklets of Building Works & and Road Works Specifications published by Gujarat Book Depot,
Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (Central Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Name of Work: bægÍtul Ntnvwh Jtuzobtk ytJuj swlt Ntnvwh rJM<th ytJ<t Bgwrl.rcÕzekd, Bgwrl.Nt¤t, ytuVem rcÕzekdbtk hevuhekd fhJt
<&t rmrJj Jfolu jd<e ytlw»ttkrdf ftbdehe fhJtlt ftb ctc<u.
Excavation for foundation upto 1.5 M depth including sorting out and stacking useful materials
disposing of the excavated stuff upto 50 meter lead in loose or soft soil.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary
excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and
rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be
property of the Government and be conveyed and stacked as directed. within 50 M. lead. The roots of the trees
coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume full
responsibility for alignment, elevation and dimension of each and all parts of the work. Contractor shall supply
laborers, materials, etc. required for setting out the reference marks and bench marks and shall maintain them
as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as
shown in the drawings or as directed. The contractor shall do the necessary shoring and shutting or providing
necessary slopes to a safe angle, at his own-cost. The payment for such precautionary measures shall be paid
separately if not specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be allowed for bringing it to
level, if mistake or any other reason excavation is made. deeper or wider that shown on the plan or directed. The
extra depth or width shall be made up with concrete of same proportion as specified for the foundation concrete
at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in
layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to a place as
directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches
shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to slopping and sloping back as found necessary on
account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum
The rate shall be for a unit of one cubic meter.
Filling available excavated earth in trenches, plinth, sides of foundation etc. incl. watering and
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water thoroughly
after each layer and shall be properly consolidated with rammers so that no hollow voids remain there. In
general the work shall be carried out in the best manner so that no hollow voids remain after work. Workmanship
in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
filling in plinth with sand under floors including watering, ramming consolidated and dressing etc.
Sand shall conform to M.
The sand to be used for filling shall be free from salts, organic or other foreign matter, All clods of earth shall be
As soon as the work in foundation has been completed and measured, the site of foundation shall be cleared of
all debris, brick bats, mortar dropping etc; and filled with sand in layers not exceeding 20 Cms. Each layer shall
be adequately watered rammed and consolidated before the succeeding layer is laid. The sand shall be
rammed with iron rammers where feasible and with the butt ends of crow-bars, where rammer cannot be used.
The plinth shall be similarly filled with sand in layers not exceeding 20 Cms adequately watered and
consolidated by ramming with iron or wooden rammers. When nfilling reaches finished level, the surface shall be
flooded with water for at least 24 hours and allowed to dry and then rammed and consolidated.
The finished level of filling shall be kept to shape intended to be given to floor.
In case of large heavy duty flooring like factory flooring, the consolidation may be done by power rollers, where
so specified. The extent of consolidation required shall also be as specified.
Mode of measurement and payment :
The payment shall be made for filling in plinth and trenches, No deduction shall be made for shrinkage
or voids if consolidated as instructed above
The rate includes cost of collecting carting sand with all lead and labour for filling the same in plinth under floors.
The rate shall be for a unit of one cubic meter.
Filling in foundation and plinth with murrum or selected soil in layers of 20 cm. thickness
including watering, ramming and consolidating etc. Complete
Filling in foundation and plinth with murrum or selected soil shall be filled in layers not exceeding 20 cms. in depth
and water thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids remain after
work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Providing and laying cement concrete1:5:10 (1-Cement: 5-coarses sand and:10-hand broken stone aggregates 40mm
nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarses and:8-hand broken stone aggregates 40mm
nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete1:3:6(1-Cement:3-coarse sand:6-hand broken stone aggregates
40mm nominalsize) and curing complete excluding cost of formworkin(A)Foundation and Plinth (upto
Providing and laying cement concrete 1:3:6 (1-Cement:3-coarse sand:6-hand broken stone aggregates 20mm
nominal size) and curing complete including cost of formwork in (A) wall caps/ coping (upto 10 ton)
Providing and laying cement concrete work 1:2:4 ((1-Cement:2-coarse sand:4-graded aggregates 20mm
nominal size) curing complete excluding cost of formwork and reinforcement ( up to {(a) to (c)}
Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregates 20 mm
nominal size) for reinforced concrete chhajjas not exceeding 10 cm. thickness upto floors two level
including finishing the exposed surfaces with cement mortar 1:3 (1 cement : 3 find sand) to give a
smooth and even surface centering and form work and curing complete excluding cost of
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6, Grit
shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete mix
shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by volume.
Concrete work shall have exposed concrete surface or as specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond approximately
to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume respectively.
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight (0.0342
Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of dry Proportion of fine Quantity of
aggregate by volume aggregate to coarse water per
concrete per 50 Kgs, of cement aggregate 50 Kgs. of
to be taken as the cement
sum of individual maximum.
volume of fine and
coarse aggregates,
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
aggregate by volume but
M-150 (1:2:4) 220 ” subject to and upper 32 “
limit of 1:1/2 and lower
2.4 The water cement ratios shall not more than those specified in the above table. The cement content of
the mix specified in the Table shall be increased if the quantity of water in a mix has to be increased to
overcome the difficulties of placement and compaction so that the water cement ratio specified in the
Table is not exceeded.
2.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to give
a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means
2.6 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in no
case greater than surround all reinforcement thoroughly and to fill the corners of the form.
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally
considered satisfactory.
2.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum
size of coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance
between the main bars, or 5 mm less than the minimum cover to the reinforcement whichever is smaller.
2.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may not
be important and the nominal maximum size may sometimes be as greater than the minimum cover.
2.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence that
with the passage of time, neither the compressive strength of concrete is reduced nor are other requisite
qualities of concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in
terms of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes of
suitable sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be
cms x 25 cms. and 40 cms deep. White measuring the aggregate and sand, the box shall be filled
without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry
volume and in case of damp sand, allowances for bulkage shall be made.
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and so maintained throughout the construction. Measured quantity of
aggregate, sand, cement required for each batch shall be poured into the drum of the mechanical mixer
while it is continuously running. After about half a minute of dry mixing, measured quantity of water
required for each batch of concrete mix shall be added gradually and mixing continued for another one
and half a minute. Mixing shall be continued till materials are uniformly distributed and uniform color of
the entire mass is obtained and each individual particle of the coarse aggregate shows complete coating
of mortar containing its proportionate amount of cement. In no case shall the mixing be done for less
than 2 minutes after all ingredients have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons, it
shall be done on the smooth watertight platform large enough to allow efficient turning over the
ingredients of concrete before and after adding water. Mixing platform shall be so arranged that no
foreign material gets mixed with concrete nor does the mixing water flow out. Cement in required
number of bags shall be placed in a uniform layer on top of the measured quantity of fine and coarse
aggregate, which shall also be spread in a layer of uniform thickness on the mixing platform. Dry coarse
and fine aggregate and cement shall then be mixed thoroughly by turning over to get a mixture to
uniform color. Specified quantity of water shall then be added gradually through a rose-can and the
mass turned over till a mix of required consistency is obtained. In hand mixing quantity of cement shall
be increased by 10 percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting
in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of concrete from
the mixture shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump of
10mm to 25mm. shall be adopted when vibrators are used and 80mm when vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to
permit him to inspect and accept the false work and forms as to their strength, alignment, and general
fitness but such inspection shall not relieve the contractor of his responsibility for the safety of men,
machinery, materials and for results obtained. Immediately before concreting, all forms shall be
thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter
with helper shall invariably be kept present throughout the period of concreting. Movement of labour and
other persons shall be totally prohibited for reinforcement laid in position. for access to different parts,
suitable mobile platforms shall be provided so that steel reinforcement in position is not disturbed. For
ensuring proper cover, mortar blocks of suitable size shall be provided so that steel reinforcement in
position is not disturbed. For ensuring proper cover, mortar blocks of suitable size shall be cast and tied
to the reinforcement. Timber kapachi or metal pieces shall not be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so transported
and placed that no contemination, segregation or loss of its constituent material takes place.
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately before
placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge has
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete shall
not be placed against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall compacted in its final position within 30 minutes of its
discharge from the mixer. Except where otherwise agreed to by the Engineer-in-charge concrete shall
be deposited n horizontal layers to a compacted depth of not more than 0.45 meter when internal
vibrators are used and not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a
height exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in such
a way as to avoid segregation. When concreting has to be resumed on a surface which has hardened, it
shall be roughened, swept clean, thoroughly wetted and covered with a 13 mm thick layer of mortar
composed of cement and sand in the same ratio as in the concrete mix itself. This 13 mm layer of
mortar shall be freshly mixed and placed immediately before placing of new concrete. Where concrete
has not fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or bristle
brushes, care being taken to avoid dislodgment of any particles of coarse aggregate. The surface shall
then be thoroughly wetted, all free water removed and then coated with neat cement grout. The first
layer of concrete to be placed on this surface shall not exceed 150 mm in thickness and shall be well
rammed against old work particular attention being given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as
concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable condition
shall be kept at site so that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before the
initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During compaction, it shall
be observed that needle vibrators are not applied on reinforcement which is likely to destroy the bond
between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain, running
water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be
covered with wet sacking, hassain or other similar absorbant material approved, soon after the initial set
and shall be kept continuously wet for a period of not less than 14 days from the date of placement.
Masonary work over foundation concrete may be started after 48 hours of its laying but curing of
concrete shall be continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being
tested i.e. the sampling should be spread over the entire period of concreting and cover all mixing units.
The minimum frequency of sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of samples
in the work samples the works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each
sample, five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be
taken on each day of the concreting as per above frequency. The number of specimens may be suitably
increased as deemed necessary by the Engineer-in-charge when procedure of tests given above
reveals a poor quality of concrete and in other special cases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 150 Kg/Cm at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the locentral value is not less than 85% of the specified strength. If the
concrete made in accordance with the proportions given for a particular grade, does not yield the
specified strength; such concrete shall be classified as belonging to the appropriate lower grade.
Concrete made in accordance with the proportions given for a particular grade shall not, however, be
placed in a higher grade on the ground that the test strength are higher than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the form
work. While fixing the time for removal of form work, due consideration shall be given to local conditions,
character for the structure, the weather and other condition that influence the setting of concrete and of
the materials used in the mix. In normal circumstances (generally where temperatures are above 20 C)
and where ordinary concrete is used, forms may be struck after expiry of periods specified in item No
9.1(A) for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the concrete.
Before the soffit and struts are removed, the concrete surface shall be exposed, where necessary in
order to ascertain that the concrete has sufficiently hardened. Centering shall be gradually and uniformly
lowered in such manner as to permit the concrete to take stresses due to its own weight uniformly and
gradually. Where internal metal ties are permitted, the or their removable parts shall be extracted
without causing any damage to the concrete and remaining holes filled with mortar. No permanently
embedded metal part shall have less than 25 mm cover to the finished concrete surface. Where it is
intended to re-use the form work, it shall be cleaned and made good to the satisfaction of the Engineer-
in-charge. After removal of form work and shuttering, the Executive Engineer shall inspect the work and
satisfy by random checks that concrete produced is of good quality.
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete
member and used for shuttering or any other purpose shall be cut inside the cement concrete member
to a depth of at least 25 mm below the surface of the concrete and the resulting holes be filled by
cement mortar. All fine caused by form joints, all cavities produced by the removal of form ties and all
other holes and depressions honeycomb spots, broken edges or corners and other defects shall be
thoroughly cleaned, saturated with water and carefully pointed and rendered true with mortar of cement
and fine aggregate mixed in the proportions used in the grade of concrete that is being finished and of
as dry consistency as is possible to use. Considerable pressure shall be applied in filling and pointing to
ensure thorough filling in all voids. Surfaces which are pointed shall be kept most for a period of
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or character
as to effect the strength of the structure materially or to endanger the life of the steel reinforcement, he
may declare the concrete defective and require the removal and replacement of the portion of the
structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The
concrete laid in excess of section shown on drawings or as directed shall not be measured. No
deduction shall be made for –
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and
steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for producing
concrete of specified strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced
concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams
girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level (D)
Staircase up to floor two level (E) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried out
for reinforced concrete work for work as specified in item 1.2. In addition, the following stipulations shall
be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar 1:2
(1 cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified cover
shall be placed between the bars and shuttering as to secure and maintain the requisite cover of
concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done below it.
The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain their
position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars are
not likely to be incorporated with succeeding mass of concrete within the following 10 days. This coat of
thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix manufactured in fully automatic batching plant and
transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing
and reinforcement including cost of admixtures in recommended proportions as per IS:9103 to accelerate/
retard setting of concrete, improve work ability without impairing strength and durability as per direction
of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be maintained)
(Cement level 320 kg )The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in
depth and water thoroughly after each layer and shall be properly consolidated with rammers so that no
hollow voids remain there. In general the work shall be carried out in the best manner so that no hollow
voids remain after work. Workmanship in general confirm to C –2.
Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere work, using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site
of work intransit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design
of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in
recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability without
impairing strength and durability as per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as
per latest IS456 shall be maintained) (Cement level 320 kg )The earth obtained from excavation shall be filled in
layers not exceeding 20 cms. in depth and water thoroughly after each layer and shall be properly consolidated
with rammers so that no hollow voids remain there. In general the work shall be carried out in the best manner so
that no hollow voids remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere
work, using cement content as per approved Design Mix manufactured in fully automatic batching plant
and transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work ability without impairing strength and durability as
per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 400 kg )
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere work, using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to
site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to
site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures
in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability
without impairing strength and durability as per direction of theEngineer-in-charge. Without Fly Ash (Min cement
level as per latest IS456 shall be maintained) (Cement level 400 kg )
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement conctere
work, using cement content as per approved Design Mix manufactured in fully automatic batching plant
and transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work ability without impairing strength and durability as
per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 450 kg )
Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement conctere work, using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to
site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to
site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures
in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability
without impairing strength and durability as per direction of theEngineer-in-charge. Without Fly Ash (Min cement
level as per latest IS456 shall be maintained) (Cement level 450 kg )
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS
shall be maintained) (Cement level 475 kg )
Providing and laying in position Ready Mixed M-350 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash(Min cement level as per latest IS 456shall be
maintained) (Cement level 500 kg )
Materials & Workmanship :
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Grit shall conform to M-8.
Coarse aggregate shall conform M-12 B.
The proportioning of cement and aggregates shall be done by weight and necessary precautions shall be taken
in the production to ensure that the required work cube strength is attained and maintained. The controlled
concrete shall be in grades of M-100, M-150, M-200, M-250, M-300, M-350, M-400, with prefix controlled added
to it. The letter ‘M’ refers to mix and numbers specify 28 days works cube compressive strength of 150 mm
cubes of the mix expressed in Kg. / Cmt.
The proportion of cement, sand and coarse aggregates shall be determined by weight. the weight batch
machine shall be used for maintaining proper control over the proportion of aggregates as per mix design.
The strength requirements of different grades of concrete shall be as under:
Grade of Concrete Compressive strength of 15 cms 28 cubes in Kg./Cmt. at with I.S.
days conducted in accordance 516-1959
Preliminary test Work test
In all cases, the 28 days compressive strength specified in above table above be the criteria for acceptance or
rejection of the concrete
Where the strength of a concrete mix as indicated by tests, lies in between the strength of any two grades
specified in the above table such concrete shall be classified in for all purposes as concrete belonging to the
lower of the two grades between which its strength lies.
The proportions for ingredients chosen shall be such that concrete has adequate workability for conditions
prevailing on the work in question and can be properly compacted with means available except where it can be
shown to the satisfaction of the Engineer-in-charge, that the supply of properly graded aggregate of uniform
quality can be maintained till the completion of work. Grading of aggregate shall be controlled by obtaining the
coarse aggregates, in different sizes and being in them in the right proportions as required. Aggregate of
different sizes shall be stocked in separate stock piles. The required quantity of material shall be stock piled
several hours, preferably a day before use. The grading of coarse and fine aggregate shall be checked as
frequently as possible, the frequency for a given job being determined by the Engineer-in-charge to ensure that
the suppliers are maintaining the uniform grading as approved for samples used in the preliminary tests.
In proportioning concrete, the quantity of both cement and aggregate shall be determined by weight. Where the
weight of cement is determined by accepting the maker’s weight per bag a reasonable number of bags shall be
weighted separately to check the net weight. Water shall either be measured by volume in calibrated tanks or
weighed. All measuring equipments shall be maintained in clean and serviceable condition. Their accuracy shall
be periodically checked.
In is most important to keep the specified water cement ratio constant and at its correct value. To this end,
moisture content in both fine and coarse aggregates shall be determined by the Engineer-in-charge, according
to the weather conditions. The amount of mixing water shall then be adjusted to compensate for variations in the
moisture content. For the determination of moisture content in the aggregates, I.S. 2389(Part III) shall be
referred to. Suitable adjustments shall also be made in the weights of aggregates due to variation in their
moisture content. Minimum quantity of cement to be used in concrete shall not be less than 220 Kgs./M 3 in
plain concrete and not less than 250 Kg/M3 in reinforced concrete.
Mode of measurement and payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete laid in
excess of section shown on drawings or as directed shall not be measured. No deduction shall be made for –
Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and steps etc.
up to 500 Sq. Cm. in section.
Opening up to 0.1 Sq. M.
The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position, vibrating
and compacting, finishing, as directed, curing and all other incidental expenses for producing concrete of
specified strength. The rate excludes the cost of form work.
Providing and laying controlled cement concrete / Ready Mix Concrete of M-200 and curing
complete, excluding the cost of form work and reinforcement for reinforced concrete work in:
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded stone
aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the cost of
form work but excluding the cost of reinforsement for R.C.C work in (iv) Slabs having more than 13 cm
and upto 15 cm.thickness
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded stone aggregates
mm nominal size) and finishing smooth with curing etc. complete including the cost of form work but excluding
the cost of reinforsement for R.C.C work in (iv) Slabs having more than 13 cm and upto 15 cm.thickness
Mode of Measurement shall be on cubic meter basis.
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded
stone aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the
cost of form work but excluding the cost of reinforsement for R.C.C work in (iv) Slabs having more
than 8 cm and upto 10 cm.thickness
Mode of Measurement shall be on cubic meter basis.
Item No. 16(A) :
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1- Cement :6 - fine sand) (B) Conventional
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall
conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before use or
as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of through wetting
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except when
necessary to complete to bond; closer in such case shall be cut to required size and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first be
properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face shall be
flushed with mortar before the next brick is laid and pressed against it. On copletion of course, the vertical joints
shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint shall be
truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The thickness of
brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s sprit
level, square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent checking
during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected brick
work shall be kept not more than one meter over the rest of the work. Where this is not possible, the work shall
be raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in wall
shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed 12 mm. The
face joints shall be raked out as directed by taking tools daily during the progress of work, when the mortar is
still green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period
seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the top of
concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for the foundation
bed, before foundation masonry is started. When puccas flooring is to be provided flush with the top to plinth,
the inside plinth offset shall be kept lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to plinth.
The limiting dimensions not exceeding those shown on the plans or as directed shall be final. Battered, tapered
and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding in
masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area does not
exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed 10 Cms. and
the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc. for
concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Brick work using common burnt clay building bricks having crushing strength not less
than 35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1-Cement :6 - fine sand)
Extra for brickwork in super structure above plinth level upto floor two level (B) Conventional
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall
conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before use or
as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of through wetting
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except when
necessary to complete to bond; closer in such case shall be cut to required size and used near the ends of
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first be
properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face shall be
flushed with mortar before the next brick is laid and pressed against it. On copletion of course, the vertical joints
shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint shall be
truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The thickness of
brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s sprit level,
square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent checking during
the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected brick work
shall be kept not more than one meter over the rest of the work. Where this is not possible, the work shall be
raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in wall
shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed 12 mm. The
face joints shall be raked out as directed by taking tools daily during the progress of work, when the mortar is still
green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period
seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the top of
concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for the foundation
bed, before foundation masonry is started. When puccas flooring is to be provided flush with the top to plinth, the
inside plinth offset shall be kept lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to plinth.
The limiting dimensions not exceeding those shown on the plans or as directed shall be final. Battered, tapered
and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding in
masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area does
not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed 10 Cms. and
the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc. for
concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Half brick masonry in common brunt clay building bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:5 ( 1-Cement : 5 coarse sand ) in foundation and Plinth
conventional brickwork (up to 10 ton)
The rate shall be for a unit of Sq. Mt.
Extra for half brick masonry in super structure above plinth level upto floor two level (B) conventional
Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to M-3. Sand shall
conform to M-6. Cement mortar shall conform to M-11.
Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall conform to item No.
except the brick work of half bricks shall be carried out.
Cement mortar used in masonry work shall be in proportion of 1 part of cement and 5 part of sand by volume.
All bricks shall be laid strecher wise, breaking joints with those in the upper and lower courses. The wall shall be
taken truly plumb. All courses shall be laid truly horizontal and all vertical joints shall be truly vertical. The bricks
shall be laid with frogs upwards. A set of masons tools shall be maintained on work as required for frequent
Mode of measurement and payment:
The half brick masonry work in foundation and plinth shall be measured under this item, the limiting dimensions
shall not exceed those shown in the plan or as directed. Any work done extra over the specified dimensions
shall be ignored.
The relevant specifications of item No. 7 shall be followed. The length shall be measured nearest to one Cm.
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of
approved make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
mm in legth made from of controlled cement concrete M20 having cube compressive strength not less
than 20 MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound
/P.U. Foam. (Plaster not required)
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of approved
make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth
made from of controlled cement concrete M20 having cube compressive strength not less than 20 MP a jointing
with high strength & tensile adhesion non-shrink cementitious joint compound /P.U. Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of
approved make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
mm in legth made from of controlled cement concrete M20 having cube compressive strength not less
than 20MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound/
P.U.Foam. (Plaster not required)
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of approved
make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth
made from of controlled cement concrete M20 having cube compressive strength not less than 20MP a jointing
with high strength & tensile adhesion non-shrink cementitious joint compound/ P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Regular concrete hollow core wall with hollow core concrete unit of
approved make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
mm in legth made from of controlled cement concrete M35 having cube compressive strength not less
than 35 MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound/
P.U.Foam. (Plaster not required)
Providing and laying Pre cast Regular concrete hollow core wall with hollow core concrete unit of approved
make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth
made from of controlled cement concrete M35 having cube compressive strength not less than 35 MP a jointing
with high strength & tensile adhesion non-shrink cementitious joint compound/ P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of
approved make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
mm in legth made from of controlled cement concrete M35 having cube compressive strength not less
than 35 MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound
/P.U.Foam. (Plaster not required)
Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of approved make
& size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M35 having cube compressive strength not less than 35 MP a jointing with
high strength & tensile adhesion non-shrink cementitious joint compound /P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing form work of ordinary timber planking so as to give a rough finish including centering
shuttering, strutting and propping etc. height of propping and centering below supporting floor to
celling not exceeding 4 m. and removal of the same for in site reinforced concrete and plain concrete
work in foundations, footing, bases of columns, and mass concrete. ( up a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not be less
than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so constructed as
to remain sufficiently rigid during the placing and compacting of the concrete. Adequate arrangements shall be
made by the contractor to safe guard against any settlement of the form work during the course of concreting
and after concreting. The form work of shuttering, centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form before the
concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treated.
The surface shall be then coated with soap solution applied before concreting is done. Soap solution for the
purpose shall be prepared by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of
raw linseed oil or form oil of approved manufacture may be applied in case steel shuttering is used. Soap
solution or raw linseed oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the
coating does not get on construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of following
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete
surface. Before the soffits form work and struts are removed, the soffits and the concrete surface shall be
exposed where necessary in order to ascertain that the concrete has sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely of the
form work and concrete work before, during and after pouring concrete. Watch should be kept to see that
behavior of centering and form work is satisfactory during concreting. Erection should also be such that it would
allow removal of forms in proper sequence without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the loads
without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before concreting. But
this will not relieve the contractor of his responsibility for strength, adequacy and safety of form work and
centering. If there is a failure of form work or centering, contractor shall be responsible for the damages to the
work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be provided
and removed on completion work by contractor at his own expense. The scaffolding, hoisting arrangements and
ladders etc. shall be strong enough to with stand all live, dead and impact loads expected to act and shall be
subject to the approval of the Engineer-in-charge. However, contractor shall be solely responsible for the safety
of the scaffolding, hoisting arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford easy
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost of
materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering propping,
bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams,
columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clear story windows including
anodised alluminium butt hinges with necessary screws.
(A) Indian Teak Wood (ii) Fully Glazed. (upto 10 ton)
(B) Indian Teak Wood (iii) Partly panelled and partly glazed. (upto 10 ton)
(C) Indian Teak Wood (iii) Partly panelled and partly glazed.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clear story windows including black
enamelled M.S.butt hinges with necessary screws..
(A) Indian teak wood. (i) Fully Panelled.(upto 10 ton)
(B) Indian teak wood. (ii) Fully Glazed.(upto 10 ton)
(C) Indian teak wood. (iii) Partly panelled and partly glazed. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick panelled, glazed or panelled and glazed shutters for Doors windows
and clear story windows including anodised alluminium But hinges with necessary screws and indian
teak wood shutters with.
(A) Plywood sheet panels. (upto 10 ton)
(B) Particle board panels (upto 10 ton)
(C) Hard board panels. (upto 10 ton)
(D) Asbestos sheet panels. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 25 mm thick shutters for cup boards etc. including black enamelled M.S. butt
hinges with necessary screws. (A) Indian teak wood. (i) Fully Panelled. (upto 10 ton)(a to b)
Providing and fixing 25 mm thick shutters for cup boards etc. including black enamelled M.S. butt hinges with
necessary screws. (A) Indian teak wood. (i) Fully Panelled. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing plain asbestos cement sheet 6 mm thick in partitions including fixing to fames with
screws etc, complete with 50 mm x 12 mm Deodar wood beading (Frames to be paid separately) (upto
Providing and fixing plain asbestos cement sheet 6 mm thick in partitions including fixing to fames with screws
etc, complete with 50 mm x 12 mm Deodar wood beading (Frames to be paid separately) (upto 10 ton)
Item should be executed as per site require ements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing in partitions 4 mm thick medium hard board of approved quality including fixing to
fames with screws etc complete with 50 mm x 12 mm teak wood beading (Frames to be paid separately)
Providing and fixing in partitions 4 mm thick medium hard board of approved quality including fixing to fames
with screws etc complete with 50 mm x 12 mm teak wood beading (Frames to be paid separately) (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
25 mm thick wooden shelves supported on 40 x 40 mm x 6 mm T or L iron brackets fixed at suitable
distances but not exceeding 75 cm. apart with Mango wood or equivalent quality. (upto 10 ton)
25 mm thick wooden shelves supported on 40 x 40 mm x 6 mm T or L iron brackets fixed at suitable distances
but not exceeding 75 cm. apart with Mango wood or equivalent quality. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron brackets fixed at suitable
distances not exceeding 75cm. Apart with Mango wood or equivalent quality. (upto 10 ton)
40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron brackets fixed at suitable distances
not exceeding 75cm. Apart with Mango wood or equivalent quality. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of
windows and clerestory windows.(upto10 ton)
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of windows
and clerestory windows.(upto10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by
screws (A) Plain Grill. (upto 10 ton)
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at required
spacings and frame alround, square or round bars with round headed bolts and nuts or by screws (A) Plain Grill.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm. x 7 cm.
size including 3 coats of oil painting to wood work etc.complete. (upto 10 ton)
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm. x 7 cm. size
including 3 coats of oil pa inting to wood work etc.complete. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm.x7 cm.
size including 3 coats of oil painting to wood work etc.complete.with wooden louvers plank 12mm thick
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm.x7 cm. size
including 3 coats of oil painting to wood work etc.complete.with wooden louvers plank 12mm thick (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including Indian
teak wood frames 10 cm x 7 cm. size including anodized alluminium fixtures and fastenings including
primer coat of approved quality and two coats of oil painting etc, complete.(ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including Indian teak
wood frames 10 cm x 7 cm. size including anodized alluminium fixtures and fastenings including primer coat of
approved quality and two coats of oil painting etc, complete.(ii) Fully Panelled.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including Indian
teak wood frames 10 cm x 7 cm. size including black enamelled iron oxidixed fixtures and fastenings
including primer coat of approved quality and two coats of oil painting etc, complete.(ii) Fully Panelled.
Wood for shutter shall conform to M-29 (2) Anodised aluminium butt hinges shall conform to M-43.
Workmanship: The item covers the requirement of preparation of shutters for doors, windows, clerestory
windows, their supply and fixing.
Panelled shutters shall be constructed in the form of timber frame work of styles and rails with panel, inserted of
type as specified in the detailed drawings. Panel shall be fixed by providing grooves in the style and rails. The
styles and rails shall be joined to each other by mortise and tenon joints at right angles.
All members of the shutters shall be straight without any warp or how and shall have smooth, well planed faces
at right angles to angles to each other.
The size of styles and rails shall be as per drawing or as directed. Styles and rails of shutters shall be made of
one piece only.
Timber paneling:
Thickness of the panel shall be as specified in the item as shown in the drawing or as directed. If the
panel is made from more than one piece, the pieces shall be finished as shown in the detailed drawings and
shall be joined with continuous groove with specified size. The end pieces of the panel and the top and bottom
of the panel shall be provided with continuous tongue to frame into groove of the frame shutter. An air space of
1.5 mm shall be left in the groove of frame shutter while fixing the panels in it.
The faces of the panel as well as various pieces of the panel shall be closely fitted to the size of the grooves.
Finishing of the corners of raised panel edges shall be done as shown in drawings or as directed.
Fixtures & Fastenings:
The rate shall include anodised aluminium butt hinges including fixing with iron screws. The size and number of
hinges shall b as per table given in annexure-1.
Mode of measurements and payment:
The rate for shutter includes cost of providing block and clear for keeping the shutter in open position as
The dimension of the shutter shall be measured clear size of the shutter in close position between the
grooves of the frame.
The rate shall be for a unit of one sq. meter.
(A) (II)Providing and fixing 35 mm thick fully glazed shutters for doors, windowsand clerestory windows
including anodised aluminium butt hinges with necessary streces, Indian Teak Wood.
Materials: Teak wood shall conform to M-29. Glass shall conform to M-38. Anodised aluminium butt hinges
shall conform to M-43.
The relevant specifications of item No. 10.12(A) I shall be followed except that the 35 mm thick shutters
fully glazed for doors, windows and clerelstory windows including aluminium butt hinges with necessary screws.
The glass panels shall be embodied in putty and secured to the rebate by wooden beds or mouldings
shape and size as approved with counter sunk screws of suitable size.
The glass panel shall be properly cut to fit the rebates of the frames and sashes fully with a light minus
margin of about 1.5 mm on all sides. Before glazing the frame shall be primed and prepared for painting so that
wood may not draw oil out of putty.
The rebate shall be putted to an extent to provide bedding all round the glass.
The glass shall then be bedded in putty and fitted to frames with wooden beads or mouldings as
directed and secured with counter sunk screw. The screw shall be spaced not more than 10 mm form each
corner and not more than 200 mm apart.
The size of the rebate in the frame and size and shape of beads or moulding shall be as per detailed
drawings or as directed. The beds or mouldings shall have mitered corners.
Mode of measurement and payment:
The relevant specifications of item No. 10.12(A)(I) I shall be followed.
The rate shall be for a unit of one sq. meter.
A) (III)Providing and fixing 35 mm thick partly panelled and partly glazedshutters, or doors, windows
including anodized aluminium butt hinges with necessary screws, Indian teak wood.
Materials: Teak wood shall conform to M-29. Glass shall conform to M-38. Anodised aluminium butt hinges
shall conform to M-43.
Workmanship: The relevant specifications of item No. 10.12(A) (I) and 10.12(A)(II) shall be followed except that
the 35 mm thick shutters shall be partly panelled and partly glazed for door windows, clerestory windows etc., as
Mode of measurement and payment:
The relevant specifications of item No. 10.12(A)(I) shall be followed. Teak wood incl.Brass fixtures and
S.S.Hingers as approved by Engg.in charge.
The rate shall be for a unit one sq. meter.
Providing and fixing 30 mm thick FACTORY MADE SOLID PANEL PVC DOOR SHUTTER consisting of
frame made out of M.S.tubes of 19 gauge thickness and size of 19 mm x 19 mm for stiles and 15 mm x
mm for to p and bottom rails. M.S. frames hall have a coat of steel primers of approved make and
manufacture, M.S. frames hall be covered with 5 mm thick heat moulded PVC ‘C’ channel of size 30 x
mm formings tiles, and 5 mm thick 75 mm wide PVC sheets for to prail, lock rail and bottom rail on either
side, and 10 mm (5 mm x 2) thick, 20 mm wide cross PVC sheet as gap insert for to p rail and bottom rail,
Panelling of 5 stiles and rails with 30 mm wide x 5 mm thick PVC sheet beading on eighter side, and
joined together with solventcement adhesive,. An additional 5 mm thick PVC strip of 20 mm width is to
be stculkon the interiors ide of the ‘c’ channel using PVC solventcement adhesive etc. complete as per
direction of Engineer incharge, manufacture’s specification and drawing.
PVC doors shall be provided with EZ-7 section doorframe as mentioned in the item description. The size of
the door shall be as per the drawing. The overall thickness of PVC doors shall be 24 mm. The aluminium
fixtures and fastenings shall be fixed to the shutters as directed by the engineer-in-charge.
The doors shall be of Sintex or any other approved make.
The holes for the hardware to be fitted shall be marked first on the door (for hinges, handle, tower bolt,
aldrop etc.); pilot holes of 3 mm shall be pre-drilled and then hinges is to be fitted on door. Screws shall not
hammered on the door but fastened by hand/electric screw driver.
Mode of measurement:
The rates of the PVC doors shall be on the basis of area in sq.mt. of PVC doors procured and fixed by the
contractor. No separate payment for the aluminum fixtures and fastenings shall be payable.
Providing and fixing in position collapsible shutters with vertical channels 20 x 10 x 2 mm braced with
flat iron diagonal 20 x 6 mm size with top and bottom rails T iron 40 x 40 x 6 mm with 38 mm dia steel
pulleys complete with bolts, units, locking arrangements, stoppers, handles, including a priming coat of
red lead paint & approved make.
Materials: The collapsible steel gate shall conform to M-33.
T-rails shall be fixed to the floor and to the lintel at top by means of anchor bolts, embedded in cement concrete
on floor and lintel. The anchor bolts shall be placed approximately at 45 mm centers alternatively in the two
flanges of the T iron. In the bottom runner (T-iron) shall be embedded in the floor and proper groove shall be
formed along the runner for the purpose. The collapsible gate shall be fixed at the sites by fixing the end double
channels in the T-Iron rail and also by hold fasts bolted to the end double channel and fixed in the masonry of
the side walls or the otherwise.
In case where the collapsible gate is not required to the lintel beams or slop above, a tee iron suitably
designed may be fixed at the top embedded in masonry and provided with necessary clamps and roller
arrangement at the top.
All the adjoining work damaged while fixing of gate shall be made good to match the existing work
without any extra payment.
All the members of the collapsible gate including T-Iron shall be thoroughly cleaned of rust, scales, dust
etc. and given a priming coat of red lead before fixing them in position.
Mode of measurements and payment:
The collapsible gate shall be measured in sq. meter. The height of the gate shall be measured as the
length of double channels and breadth from outside to outside of the end fixed double channels in open position
of the gate. The rate includes providing handles, locking arrangements, stoppers etc.
The rate shall be for unit of one sq. meter.
Providing and fixing 1 mm thick M.S. sheet sliding shutters with frame and diagonal braces of 40x40x6
mm angle iron, 3.15 mm M.S.gusset plates at Junctions and corners 25 mm dia. pulley, 40x40x6 mm
angle and T-iron huide rail at top and bottom respactively with handles, stoppers and locking
agangement etc, including applying a priming coat of red lead paint. (upto 10 ton)
Providing and fixing 1 mm thick M.S. sheet sliding shutters with frame and diagonal braces of 40x40x6
mm angle iron, 3.15 mm M.S.gusset plates at Junctions and corners 25 mm dia. pulley, 40x40x6 mm angle and
T-iron huide rail at top and bottom respactively with handles, stoppers and locking agangement etc, including
applying a priming coat of red lead paint. (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for unit of one sq. meter.
Providing and fixing rolling shutters of approved make made of 80 mm wide M.S.laths inter-
locked together through their entire length and jointed together at theends by end locks mounted on
specially designed pipe shaft with bracket plates, guide channels and arragements for inside and out
side locking with push-pull operation including the cost of hood cover and spring etc. complete. (A)
Shutters having width below 3.5 M.
Providing and fixing rolling shutters of approved make made of 80 mm wide M.S.laths inter-locked
together through their entire length and jointed together at theends by end locks mounted on specially designed
pipe shaft with bracket plates, guide channels and arragements for inside and out side locking with push-pull
operation including the cost of hood cover and spring etc. complete. (A) Shutters having width below 3.5 M.
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for unit of one sq. meter.
Providing & Fixing in position Alluminium doors with frame using approved quality anodised extruded
alluminium section as approved by Engg.in charge(Jindal alluminium)(a) Frame sections 101.6x44.45
mm (b) Shutter bottom vertical & top section 83.5x44.45 (wt.1.31 kg/mt.)(at 1.31 kg/mt) (c) Shutter bottom
section at 114.3x44.45 mm at (1.37 kg/mt) Shutter middle section at 100x44.3 wt.(1.37 kg/mt)
incl.providing & installing 5 mm thick approved color Acrylic sheet of standard quality fixed with glazing
chips on upper pannel & Laminated sheet on lower pannel (wtt.0.13 kg/Rmt) etc.comp.as direction of
Metalic Color Anodized Aluminum alloy used in the manufacture of extruded sections for the fabrication
of doors, windows, ventilators shall confirm to designation HE9-WP of IS:733.
Transparent sheet glass shall confirm to the requirements of IS:2835. Wired and figured glass shall be
as per IS:5437. Builder's hardware of fittings & fixtures shall be of the best quality from approved manufacturers.
All aluminum doors, windows, ventilators and partitions shall be of the type and size as specified. The
doors, windows, ventilators shall confirm to the requirements of IS: 1948. Aluminum windows, shall confirm to
IS: 1949, if so specified. All aluminum units shall be supplied with Metallic color anodized finish. The minimum
anodic film thickness shall be 0.015 mm. Doors, windows and ventilators shall be of an approved manufacture.
Fabrication of the units shall be with the extruded sections, cut to correct lengths, mitred and welded at the
corners to a true right angle conforming to the requirements of IS: 1948. Tolerance in overall dimensions shall
be within ± 1.5mm. The frames and shutters shall be free from warp or buckle and shall be square and truly
plane. Punching of holes, slots and other provisions to install fittings or fixtures later shall be made at the correct
locations, as per the requirements.
Aluminium swing type doors, aluminum sliding windows, partitions shall be as specified. IS: 1948 and IS:
shall be referred to incorporates the sizes, shapes, thickness and weight per running meter of extruded sections
for the various components of the units. However, new sizes, shapes, thickness with modifications to suit snap-
fit glazing clips etc. are being continuously being added by various leading manufacturers of extruded sections,
which are available in the market. As such, the sections of the various components of the unit proposed by the
Contractor, will be reviewed by the GSDWICL and will be accepted only if they are equal to or marginally more
than that given in the codes/as specified.
Specific provisions as stipulated for steel doors, windows, and ventilators under related clause shall also be
applicable for this item work. Glazing beads shall be of the snap-fit type suitable for the thickness of glazing
proposed as indicated in the items of works prepared by the Contractor. A layer of clear transparent lacquer
shall be applied on Aluminium sections to protect them from damage during installation. This lacquer coating
shall be removed after the installation is completed.
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing and fixing extruded aluminum window having extruded aluminum Colour Powder
Coatedsectionframemainoutersize127mmx38.10mmx1.35mm(ofJindalSectionno:2443,@Wt.1.384Kg/mt),
horizontal Four track member size122.20mm x31.75mm x1.10mm (ofJinda lSection no:8787,@
Wt.1.205Kg/ mt) ,vertical member of size122.20mm x31.75 mm x1.50 mm (ofJindal Section
no:8935,@Wt.1.398Kg/mt) with sliding shutters of horizontal member size 40mmx18mmx1.29
mm(ofJindal Section no:8949 @wt.of0.456 Kg/mt), vertical member of size 40mmx18mmx
1.29mm(ofJindal Section no:8947 @wt.of0.456Kg /mt/Section 8948,@Wt.0.457Kg/mt) with 5mmt hick
transparent bronze colour tinted float glass with powder coated aluminum fittings and
fixturesandtransparentsiliconsealantglassfixingtoframeasperdetailsetccompletefor
Providing and fixing extruded aluminum window having extruded aluminum Colour Powder Coated
section frame main outer size127mmx38.10mmx1.35mm(ofJindalSectionno:2443,@Wt.1.384Kg/mt),horizontal
Four track member size122.20mm x31.75mm x1.10mm (ofJinda lSection no:8787,@ Wt.1.205Kg/ mt) ,vertical
member of size122.20mm x31.75 mm x1.50 mm (ofJindal Section no:8935,@Wt.1.398Kg/mt) with sliding
shutters of horizontal member size 40mmx18mmx1.29 mm(ofJindal Section no:8949 @wt.of0.456 Kg/mt),
vertical member of size 40mmx18mmx 1.29mm(ofJindal Section no:8947 @wt.of0.456Kg /mt/Section
8948,@Wt.0.457Kg/mt) with 5mmt hick transparent bronze colour tinted float glass with powder coated
aluminum fittings and fixturesandtransparentsiliconsealantglassfixingtoframeasperdetailsetccompletefor
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing & Fixing in position Alluminium vents with frame using approved anodised extruded
alluminium section as approved by Engg.in charge.(Jindal alluminium) units equivalent (Approved Rate)
Frame section of 63.50 x 38.50 mm (wt.0.68 Kg/Rmt) incl.Providing & Installing 5 mm thick approved
color Acrylic sheet of standard quality etc.comp.
Providing & Fixing in position Alluminium vents with frame using approved anodised extruded
alluminium section as approved by Engg.in charge.(Jindal alluminium) units equivalent (Approved Rate) Frame
section of 63.50 x 38.50 mm (wt.0.68 Kg/Rmt) incl.Providing & Installing 5 mm thick approved color Acrylic sheet
of standard quality etc.comp.
Mode of measurement
Measurement will be given on the Smt. basis of actual area of the Aluminum section.
Providing and fixing standared extruded of alluminium section of size 63 mmx38.10 mmx1.2 mm (Jindal
Section:2434, @ Wt.0.643 Kg/mt) with colour anodized alluminium frame for ventilation with 5 mm thick
frosted glass as details etc complete for Ventilation
Providing and fixing standared extruded of alluminium section of size 63 mmx38.10 mmx1.2 mm (Jindal
Section:2434, @ Wt.0.643 Kg/mt) with colour anodized alluminium frame for ventilation with 5 mm thick frosted
glass as details etc complete for Ventilation
ITEM SHALL BE EXTUCUTED AS PER INSTRUCTION GIVEN BY ENGG. INCHARGE.
ITEM SHALL BE PAID IN SMT
Providing and fixing standared extruded of alluminium section of size 63.50 x 38.10 x 1.95mm,@ Wt
1.094Kg / Rmt with colour Powder Coated alluminium frame with 5 mm thick transparent bronze colour
tinted float glass as details etc complete for Fix Partition
ITEM SHALL BE EXTUCUTED AS PER INSTRUCTION GIVEN BY ENGG. INCHARGE.
ITEM SHALL BE PAID IN SMT
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to granolithic
finish with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand: 4-graded stone
aggregate 10 mm and down gauge) and to player 10 mm thick with white, black or white and blak marble
cihps of required sizes from 1 mm to 4 mm nominal size laid in cement marble powder mix 3:1 (3-
Cement:1-Marble powder by weight) in proportion of 4:7 (4-Cement: 7-marble chips by volume) (C)
Medium Shade pigment with approx 50% white cement and 50% ordinary cement (In top layer only)
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to granolithic
finish with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand: 4-graded stone aggregate
10 mm and down gauge) and to player 10 mm thick with white, black or white and blak marble cihps of required
sizes from 1 mm to 4 mm nominal size laid in cement marble powder mix 3:1 (3-Cement:1-Marble powder by
weight) in proportion of 4:7 (4-Cement: 7-marble chips by volume) (C) Medium Shade pigment with approx 50%
white cement and 50% ordinary cement (In top layer only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic finish
to player 6 mm white, black or white and black marble chips of size from smallest to 4 mm nominal size
laid in cement marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in proportion of 4:7 (4-
cement marble powder mix: 7-marble chips by volume) 20 mm thick with under 14 mm thick layer
cement plaster 1:3 (1-cement: 3-coarse sand) (C) Medium shade pigment with appox 50% white cement
and 50% ordinary cement (In top layer only) (upto 10 ton)
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic finish to
player 6 mm white, black or white and black marble chips of size from smallest to 4 mm nominal size laid in
cement marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in proportion of 4:7 (4-cement marble
powder mix: 7-marble chips by volume) 20 mm thick with under 14 mm thick layer cement plaster 1:3 (1-cement:
3-coarse sand) (C) Medium shade pigment with appox 50% white cement and 50% ordinary cement (In top layer
only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Providing and laying white glazed tiles 6 mm thick in flooring treads of steps and landing laid on a bed
of 12 mm thick cement mortar 1:3 (1- cement:3-coarses and) finishing with flush pointing in white
cement. (upto 10 ton)
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as
specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and plumb. The
surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick backing of cement
mortar in specified proportion shall be applied on the surface in true like and level generally as per specifications of plaster
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed tiles shall
then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the flooring is
competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the intersections of the
horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true to entire line both ways and
vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as possible to the adjoining tiles and any
difference in the thickness of the glazed tiles shall be evened out in the cement paste so that all the tiles faces are set in
conformly with one another. The skirting shall project uniformly and not more than 6 mm. thickness beyond the finished
surface above. Top of skirting of dedo shall be truly horizontal. The rises of steps, skirting or dedo shall rest on top of
treads of flooring wherever required. The tiles shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of skirting only
10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white glazed tiles shall be
laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient plasticity for laying and there
shall be no hard lumps that would interfere with the evenness of bedding the base shall be cleared with well wetted. The
mortar shall then be spread in thickness not less than 10 mm at any place and average 12 mm thickness. The proportion
of the cement mortar shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at 3.3 Kg/Cement /Sq.
mt. Of honey like consistency shall be separated over the mortar bedding as directed. The edges of the tiles be smeared
with neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden mallet till they are properly
bedded and in level with the adjoining tiles. There shall be no hollows in bed or joints. The joints between the tiles shall be
as thin as possible in straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming in the
flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size tiles cannot be
fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight and true joints. The
joints shall be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and loose material removed.
White cement shall be used for pointing the joints., After fixing the tile finally in an even the flooring shall be kept wet and
allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor has set,
it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be taken to ensure
that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring shall be
measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The paving under dedo
or skirting shall not be measured. No deduction shall be made not extra paid for any opening in the floor of area upto
sq. mt. Nothing extra shall be paid for laying the floors at different levels in the same rooms.
The rate shall be for a unit of one sq. metre.
Providing and laying Ceramic tiles 6 mm thick in flooring treads of steps and landing laid on a bed of 12 mm thick
cement mortar 1:3 (1-cement :3-coarses and) finishing with flush pointing in white cement. (upto 10 ton)
Water shall conform M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Ceramic tiles shall be of approved colour and quality. The tile shall be even, sound regular in shape and
generally uniform in colour. It shall be without any soft veins, cracks of flows.
All angles and edges of the slabs shall be true square and free form chippings and giving plain surface. The
thickness shall be 10 mm to 15 mm. as specified in the item but not less than 10 mm. at any place.
Claddding for the ceramic tiles shall be cement mortar 1:3 (1 cement : 3 coarse sand) as given in the
description of the item. Sub grade shall be cleaned, wetted and mopped. Mortar of the specified mix and
mm thickness shall be then be spread. Top surface of the mortar shall then be corrected by adding fresh
mortar at hollows or depressions. The mortar shall then be allowed to harden bit. Over this surface, cement
slurry of honey like consistency shall be applied. The slab shall then be gently place in position and tapped
with wooden mallet till it is properly pedded in level with and close to the adjoining slab. The joint shall be as
fine as possible. The tiles fixed in the floor adjoining the wall shall enter not less then 10 mm. under the
plaster skirting or dado. The junction between the wall floor shall be finished neatly. The finished surface
shall be true to levels and slopes as directed.
The cladding shall be kept wet for a minimum period of 7 days. So that joints set properly.
The floor shall then be washed clean with water. The holes required for Nahni traps, pipes any other fittings
shall be made without any extra cost.
Mode of measurements & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall be measured along the
finished faces of risers, skirting or dado. Height shall be measured from finished level of treads or floor to
top. Lining of pillar shall be measured under this item.
The rate shall be for a unit of sq. metre
Providing & Fixing 20 mm thick Mirror Polished Decorative Granite Board with Computerised
Golden Letters Discription as per instructions of engg. in charge to M.S. frame
structure for Inaugaration & Public Handover Function (N.S.)
Providing and laying Vitrified tiles 8 to 10 mm thick, 36''x36'' in flooring treads of steps and landing laid
on a bed of 12 mm thick cement mortar 1:3 (1-cement:3-coarses and) finishing with flush pointing in
white cement. (upto 10 ton)
Providing and Laying 36" x 36" vitrified 8 mm th.anti skid tiles of "RAK","Bell" or equivalent make as approved by
consultants flooring/skirting over 20 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) on new surface &
jointed with colour cement slurry incl.with flush pointing & cleaning the surface etc.comp
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. vetrified
tiles of 24" x 24" , 8 mm th.anti skid tiles. "RAK","Bell" or equivalent make
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The
finished surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be measured
between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall be paid
for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different
levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under
The rate shall be for a unit of one sq. metre
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in flooring treads of steps and landing laid
on a bed of 12 mm thick cement mortar 1:3 (1-cement:3-coarses and) finishing with flush pointing in
white cement. (upto 10 ton)
Providing and Laying 24" x 24" vitrified 8 mm th.anti skid tiles of "RAK","Bell" or equivalent make as approved by
consultants flooring/skirting over 20 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) on new surface &
jointed with colour cement slurry incl.with flush pointing & cleaning the surface etc.comp
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. vetrified
tiles of 24" x 24" , 8 mm th.anti skid tiles. "RAK","Bell" or equivalent make
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The
finished surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be measured
between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall be paid
for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different
levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under
The rate shall be for a unit of one sq. metre
Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting risers of steps and dedo on 10 mm thick
cement plaster 1:3 (1-cement:3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting risers of steps and dedo on 10 mm thick
cement plaster 1:3 (1-cement:3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Mode of measurements & payment : The rate shall be for a unit of one Sq. meter.
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in skrting risers of steps and dedo on
mm thick cement plaster 1:3 (1-cement: 3-coarse sand) and jointed with white cement slurry (upto
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in skrting risers of steps and dedo on
mm thick cement plaster 1:3 (1-cement: 3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Mode of measurements & payment : The rate shall be for a unit of one Sq. mete
Providing and laying 24" x 24" vitrified 8 to 10 mm th.Double Charged Gloosy / Matt tiles
of Approved make as Approved by Adl.C.E. / Consultants for upto 10 cm high skirting as approved
by Engineer in charge over 10 mm thick cement mortar 1:6 (1 cement : 6 coarse sand)on new
surface& jointed with colour cement slurry incl with flush pointing & cleaning the surface etc.
Mode of measurements & payment : The rate shall be for a unit of one Sq. mete
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of cement
mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 (1-Lime putty:1.5-coarses and) laid over and jointed
with grey cement slurry mixed with pigment to match the shade of slab including rubbing and polishing
etc. complete. (A) 25 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. Marble
stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and even
surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully in contact with
it. Chisel dressing shall also be done on top surface to remove any waviness. The sides and top surface to
granite slabs shall be machine polished and molding etc. complete before using. All angles and edges of slabs
shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance shall
be 15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The
finished surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra
shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at
different levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be
measured under flooring.
The rate shall be for a unit of one sq. metre.
ITEM NO -59 & 60 ( Consider Marble Stone Instead of Kota stone for Item No. 59)
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of cement
mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 laid over and jointed with grey cement slurry including
rubbing and polishing etc.complete. (B) 30 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. Marble
stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and even
surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully in contact with
it. Chisel dressing shall also be done on top surface to remove any waviness. The sides and top surface to
granite slabs shall be machine polished and molding etc. complete before using. All angles and edges of slabs
shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance shall
be 15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The
finished surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra
shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at
different levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be
measured under flooring.
The rate shall be for a unit of one sq. metre.
Providing and laying polished kota stone slab 25 mm thick in risers of steps, skirting Dedo and pillars
laid on 10 mm thick cement mortar 1:3 (1-Cement :3 coarses and) and jointed with gray cement slury
mixed with pigment to match the shade of slab including rubbing and polishing etc.complete. (upto
The relevant specifications of item no. 59 shall be followed except shall that the kota stone shall be fixed
for risers of steps, skirting or dado in C.M. 1:3 and the polishing shall be manually instead of machine
Mode of measurement & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall be measured along the
finished faces of risers, skirting or dado. Height shall be measured from finished level of treads or floor to
top. Lining of pillar shall be measured under this item.
The rate shall be for a unit of 1 sq. metre.
Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarses and:4-graded stone
aggregate 20mm nominal size) laid in one layer and finished with a floating coat of neat cement. (A)
40mm thick. (upto 10 ton)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone aggregate
20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured by volume shall
conform to relevant specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 40 mm. thick (average) is to be laid as per the site condition. The concrete
shall be mixed in a mechanical mixer at the work. Hand mixer may however be allowed for smaller quantities
of work and in case of failure of machines or as permitted by the engineer-in-charge. It shall carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. However in such cases 10% more cement than otherwise required shall have to be
used without any cost. The mechanical mixing shall be done for a period of /2 to 2 minutes. The quantity of
water shall be thus sufficient of produce a dense concrete required workability for the purpose. Flooring of
specified thickness shall be laid in accordance with approved pattern or as directed. Finishing operation
shall start shortly after the cessation of beating and shall be spread over a period of one to six hours
depending upon the temperature and atmospheric conditions. The surface shall be left for some time till
moisture disappears from it. Fresh quantity of cement shall be mixed with water to form a thick slurry and
spread over the surface while the concrete is still green. Use of dry cement or cement and sand mixture
sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be permitted. The
cement slurry shall than be properly paste twice by means of iron flats, once, when the slurry is applied and
the second time when cement starts setting and finished smooth. The surface shall be marked with string or
B.R.C. fabric jali to make the surface non slippery as and when directed. The junction of floors with wall
plaster dado or skirting shall be rounded where so required upto 25 mm. radius. Flooring in lavatories and
bath rooms shall be laid after fixing of water closet and squatting pans and floor traps, which shall be
plugged while laying the floors and opened after the floors, are completed. Any damage, done to water
supply sanitary fittings during the execution of work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not less
than 7 days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall be
done as per alternate bay method with necessary centering wither by mastic or cement mortar as directed.
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described above. No
deduction shall be made or extra paid for any opening upto 0.1 sq. meter in area in the floor, nothing extra
shall be paid for laying the floor at different levels in the same room or the court yard.
The rate shall be for unit of one sq. meter.
Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarse sand:4-graded stone aggregate
20mm nominal size) laid in one layer and finished with a floating coat of neat cement. (B) 50mm thick.
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone aggregate
mm. nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured by volume shall
conform to relevant specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 50 mm. thick (average) is to be laid as per the site condition. The concrete
shall be mixed in a mechanical mixer at the work. Hand mixer may however be allowed for smaller quantities
of work and in case of failure of machines or as permitted by the engineer-in-charge. It shall carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. However in such cases 10% more cement than otherwise required shall have to be
used without any cost. The mechanical mixing shall be done for a period of /2 to 2 minutes. The quantity of
water shall be thus sufficient of produce a dense concrete required workability for the purpose. Flooring of
specified thickness shall be laid in accordance with approved pattern or as directed. Finishing operation
shall start shortly after the cessation of beating and shall be spread over a period of one to six hours
depending upon the temperature and atmospheric conditions. The surface shall be left for some time till
moisture disappears from it. Fresh quantity of cement shall be mixed with water to form a thick slurry and
spread over the surface while the concrete is still green. Use of dry cement or cement and sand mixture
sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be permitted. The
cement slurry shall than be properly paste twice by means of iron flats, once, when the slurry is applied and
the second time when cement starts setting and finished smooth. The surface shall be marked with string or
B.R.C. fabric jali to make the surface non slippery as and when directed. The junction of floors with wall
plaster dado or skirting shall be rounded where so required upto 25 mm. radius. Flooring in lavatories and
bath rooms shall be laid after fixing of water closet and squatting pans and floor traps, which shall be
plugged while laying the floors and opened after the floors, are completed. Any damage, done to water
supply sanitary fittings during the execution of work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not less
than 7 days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall be
done as per alternate bay method with necessary centering wither by mastic or cement mortar as directed.
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described above. No
deduction shall be made or extra paid for any opening upto 0.1 sq. meter in area in the floor, nothing extra
shall be paid for laying the floor at different levels in the same room or the court yard.
The rate shall be for unit of one sq. meter.
Providing and fixing pre-cast concrete kerb stone of gray cement based concrete
block 30 cm length, 30 cm height and 15 cm thick of M250 grade concret as per approved design
and including excavation for fixing in proper line and level, filling the joint with C:M 1:3 (1 cement
:3 fine sand) etc complete. (upto 10 ton)
Trenches of specified width and depth shall first be made along the edges of the wearing course of the road or
along the line of pave block flooring to receive the restraint blocks. The bed of the trenches shall be compacted
manually with steel rammers to a firm and even surface and then stones shall be set in P.C.C.
The edge restraint blocks shall be laid with their length running parallet to the paving edge, true in
line and gradient. The joints of blocks shall be not more than 10 mm and filled with the CM 1:3 ( 1 cement :
fine sand ) which shall be cured for 7 days.
Finishing The edges shall be restored and all surplus earth including rubbish etc. disposed off as directed by
the Engineer-in Charge.
Measurements Length of the finished work shall be measured in running metre along the edge of the paving
correct to a cm.
Rate The rate shall include the cost of the materials and labour including stone of specified material involved in
all the operation described above. The rate shall be for a unit of one meter basis.
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 60mm thick with
grade of concrete M300 pneumatic compressed / vibrated mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint with sand
in proper line and level as per guidlines of IRC : SP 63-2018 etc.
Scope of work :
Excavation and compaction up to 30 cm in height . for footpath paving in all sorts of soil murrum including
sorting outs and stacking of useful materials stuff up to 50 mt. lead from excavated place
and same well be carting. Up to 5 km.
The scope of work includes manufacturing, supplying and laying of precast paver blocks at various
Retail outlets. The work includes :
1.1 Verification of the existing site condition and advising our project in charge to lay suitable base
course if required. Contractors are required to satisfy themselves with quality of sub grade, sub-base
course before the paver blocks are laid and suggest strengthening if required.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
1.4 Supplying of paver blocks at site, including handling at both ends.
1.5 Laying of paver blocks at site as per requirement in technical specification, within shortest possible
time. The site being existing operating Retail Outlets, care should be taken to ensure that the operation
is not closed. The job of laying may required to be carried out during night also.
1.6 Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test results as
per requirements in Technical Specifications. HPCL reserves the right to carryout test at random. Cost
for such tests to be borne by party.
1.7 The contractor shall guarantee that all material and components designed, fabricated, supplied and
laid by him shall be free from any type of defect due to faulty material and/or workmanship/erection
for a period of One year from the date of completion of work at individual sites. However, the
contractor fro two years shall render free maintenance.
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high
level of compaction by application of hydraulic compaction and also by high intensity vibration to the
moulds. The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of
cum/hour. The plant should equipped with automatic control panel for maintaining water cement ratio
from batch to batch to obtain concrete of uniform quality and strength. The plant should be equipped
with adequate mechanism for mechanized loading of raw materials into mixer and conveyor belt for
transportation of concrete from mixer to concrete block making machine to maintain quality of wet
The factory should have well designed curing area to ensure adequate curing of paver blocks.
For the Rubber mould paver block specification has to followed as per specification of Gray and coloured
paver block specification. But at the production level the mould for producting rubber moulded paver block the
mould is of rubber materials and the prodection of rubber moulded paver block is even shaded, finishing and
even colour shaded and using Rubber mould should be producing on vibratory mechine by obtaing high level of
compaction by application of vibration to the moulds. The machine should have automatic control pannel for
uniformity in strength. Or as per direction of engineering incharge.
1.5 Laboratory (Desirable but not essential) :
The factory should have the following:
(i) Compression testing machine of adequate capacity.
(ii) Other tools and equipment for testing raw materials and paver blocks.
(iii) (1).Systematic record of test results of various paver blocks manufactured in the factory.
(2).Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved
colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum
colour pigment of 3% by weight of cement. The colour shade shall be “RED” as selected by HPCL
before commencement of the work. White cement shall be used for colored pavers to obtain the desired
colour shade. The job also includes providing 50 mm thick sand bedding to match the shade of the
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date
of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic
batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of
the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X
250mm X 380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing
shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no Hollow
Chamfer 4mm to 6mm along top edges
Colour a. Natural cement grey colour without
use of any pigment.
b. For coloured pavers refer
“specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm for
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Contact 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
2. Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
3. Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor
Tiles) – Appendix C.
4. Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor
Tiles) – Appendix D.
5. Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for
Concrete Masonry Units) – Appendix E.
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be
divided into ten approximately equal groups. Three blocks shall be drawn from each group.
2. Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of
part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they have
been tested. The testing shall be carried as soon as possible, after the sample has been taken. As soon
as practicable after sampling. The samples shall be stored in water at 20 degree C 5 degree C for
hours prior to testing.
The rate shall be for a unit of one square meter.
Providing and laying broken china mosaic flooring for terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to plain or slope and to be tempered to bring mortar creme
out upto surface using white cement including rounding off junctions and extending them up to15 cm
along the wall, clearing with water and oxalic acid etc.asdirected.
Providing and laying China Mosaic finishing over flat or curved surface, including laying to approved patterns,
with precies leveling and setting curvatures with necessary tools and templates, using white/coloured broken
ceramic tile chips, set in pigmented cement mortar 1:4, as directed, finishing in line, level and to required slope,
flushing with appropriate pigimented cement grout, curing and finishing with mild acid wash etc. complete.
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Before laying a final layer of China Chips prepare the surface to the required slope and level with a
backing coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and scrub the same
vigorously to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark out total
design on the designated area. Estimate the quantity of Chips of different colous and ensure its uninterrupted
supply before starting the work. Lay the chips flat on the bedding coat and fix tightly be light hammering.
Remove grey cement from the joints by scrapping before final set of cement.
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall be finished
with first class workmanship. The surface should finally cleaned, given a mild acid wash for gain the luster of
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist artisan,
preparing templates, testing etc are included.
MODE OF MEASUREMENT :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two places of
Providing and laying coloured glazed tiles of the size 300 mmx200 mmx8 mm/300 mmx450 mmx8 mm in
skirting, risers of steps and dedo on 10 mm. thick cement plaster 1:3 (1cement: 3 coarse sand) & jointed
with white cement slurry.
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as
specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and plumb. The
surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick backing of cement
mortar in specified proportion shall be applied on the surface in true like and level generally as per specifications of plaster
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed tiles shall
then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the flooring is
competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the intersections of the
horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true to entire line both ways and
vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as possible to the adjoining tiles and any
difference in the thickness of the glazed tiles shall be evened out in the cement paste so that all the tiles faces are set in
conformly with one another. The skirting shall project uniformly and not more than 6 mm. thickness beyond the finished
surface above. Top of skirting of dedo shall be truly horizontal. The rises of steps, skirting or dedo shall rest on top of
treads of flooring wherever required. The tiles shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of skirting only
10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white glazed tiles shall be
laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient plasticity for laying and there
shall be no hard lumps that would interfere with the evenness of bedding the base shall be cleared with well wetted. The
mortar shall then be spread in thickness not less than 10 mm at any place and average 12 mm thickness. The proportion
of the cement mortar shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at 3.3 Kg/Cement /Sq.
mt. Of honey like consistency shall be separated over the mortar bedding as directed. The edges of the tiles be smeared
with neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden mallet till they are properly
bedded and in level with the adjoining tiles. There shall be no hollows in bed or joints. The joints between the tiles shall be
as thin as possible in straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming in the
flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size tiles cannot be
fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight and true joints. The
joints shall be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and loose material removed.
White cement shall be used for pointing the joints., After fixing the tile finally in an even the flooring shall be kept wet and
allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor has set,
it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be taken to ensure
that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring shall be
measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The paving under dedo
or skirting shall not be measured. No deduction shall be made not extra paid for any opening in the floor of area upto
sq. mt. Nothing extra shall be paid for laying the floors at different levels in the same rooms.
The rate shall be for a unit of one sq. metre.
Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts and
nuts 8 mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with white lead
complete excluding the cost of purlins, Rafters and Trusses. (1) 0.80 mm thick sheet.(up to10 ton)
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing ridges or hips 600 mm over allin plain G.I. sheet class-3 fixed with G.I. J or L
Hooks and nuts 8 mm dia G.I. Limpet and bitumen washer complete. (1)
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing and fixing 150 mm wide 450 mm over all semi circular plain G.I.sheet class-3 gutter
with Iron brackets 40 mmx3 mm size Bolts, Nuts, washers etc. including making necessary
connection with rain water pipes. (i) 0.80 mm thick
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing and fixing five courses water profing treatment with bitumen felt consisting of
second and fourth course of blown/ bitumen or/and residual bitumen applied hot at
kg.per Sq.M.of area for each course and first course with fibre base bitunen saturated
under lay type land third course with fibre base self finished felt type 2 grade 1 and fifth and
final course of stone grit 6 mm and down size or pea sizes gravel spread at
0.008 Cu.Metre/Sq.metre preparation of surface excluding grading complete. (upto 10 ton)
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
FORM OF GUARANTEE BOND
"I/We……………………………(Contractor)hereby guarantee that work will remain
unaffected and will not be in any way damaged by termite or any other germs of similar type for
period of 05 years after completion of the work of anti0termite as per the terms and condition of
the contractor and contractor hereby indemnifies and agrees to save harmless the Government of
Gujarat from any loss and or damage that might be caused account of termite and or other
similar type of germs and hereby Guarantee to make good any loss or damages suffered by the
Government of Gujarat and further guarantee to redo the effective work without claiming any
This guarantee shall remain force for the period of 05 year from the completion of the work
under the contract and it shall remain binding to the contractor for period of 05years.
The deposit at the rate of 50% of the cost of this item from the running and final bills shall be
recovered and retained for the fist one year after the completion of the completion of the
guarantee period.
Mode of Measurement :
The length and breadth shall be measured correct to cm as per the dimensions of sanctioned
plans NO deduction shall be made not extra paid for and opening for pipe etc. upto 0.1 sq mt
The rate shall include the cost of all labour materials required for the operation involved for
satisfactory completion of this item The saids of the trenches 30cms each side and bottom shall
be measured under this item.
The rate shall be for a unit of one sq. meter.
Providing and fixing on wall face C.I. Rain water pipe including filling the joints with spun yarn soaked in
neat cement slurry and cement mortar 1:2(1- Cement : 2-fine sand) (A) 75 mm dia.
Mode of payment shall be in Rmt
Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single or half brick walls
for interior plastering up to floor two level and finished even and smooth in (i) Cement mortar 1:3 (1-
cement :3-sand)
Mode of payment shall be in Sqm
Providing 20mm thick sand faced cement plaster on walls upto height 10 metres above ground level
consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of
C.M. 1:1 (1-cement : 1-sand) etc. complete.
The specification is as per above Item except thickness of the plaster is 20 mm sand faced and 12 mm th. Backing
coat in C.M. (1:3) and 8 mm thick finishing coat no machine paster will be allowed for spray od sand for plastering etc
comp as directed by Engg i charge.
Mode of measurements & payment : The rate shall be for a unit of one Square Meter.
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall be
properly examined before erection and use Stage scaffolding shall be provided for ceiling plaster, which shall be
independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and other foreign
matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not hard and by
racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the form work, the
surface shall be roughened by wire brushing and all the resulting dust and loose particles cleaned off and care
shall be taken that none of the retarder is left on the surface. Trimming of projections on brick/concrete surface
where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period before
carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes dry
such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For internal
plaster, the plastering operations may be started wherever the building frame and cladding work are ready and the
temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling plaster shall be completed
before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre intervals
over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of the finished
plastered surface. The mortar shall then be applied in uniform surface slightly more than the specified thickness,
then brought to a true surface by working a wooden straight edge reaching across the gauges with small upward
and sideways movement at a time. Finally, the surface shall be finished off true with a trowel or wooden float
according as a smooth or a sandy granular texture is required. Excessive trowelling or overworking the float shall
be avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as the case may be and shall
be carefully finished. Rounding or chamfering corners, arrises junctions etc. shall be carried out with proper
templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is partially set
shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally and vertically.
When recommending the plaster, the edges of the old work shall be scraped clean and wetted with cement putty before
plaster is applied to the adjacent area to enable the two to properly joint together. Plastering work shall be closed at the
end of the day on the body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints in plasterwork
shall not also occur on parapet tops and copings as these invariably lead to leakage. No portion of the surface shall be
left out initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided and only
as much water as can be readily absorbed shall be used excessive evaporation on the sunny or windward side of
building in hot air or dry weather shall be prevented by handling mattings or gunny bags on the outside of the
plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations described
under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height shall be
measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick work,
stone work etc. or space between laths. Thickness of plaster shall be average thickness with minimum 10 mm. at
any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before plastering
being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of cornices if any
shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams, posts,
girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and not
exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following manner :
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt. each and
no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster around ends of
joints, beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows
and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one face only
When two faces of wall are plastered with different types of plasters or if one faces is plastered and the other
pointed, deductions shall be made from the plaster or pointing on the side of frame for door, window etc. on
which width or reveals is less than that on the other side but no deductions shall be made on the other side.
Where width of reveals on both faces of all are equal, deductions of 50% of area of opening on each face
shall be made from area of plaster and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for opening shall
be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits and sills
shall be measured.
The rate shall be for a unit of one sq. metre.
White washing with lime on undecorated wall surfaces (TWO coats) to give an even shade including
thoroughly brooming the surface to remove all dirt, dust mortar drops and other foreign matter.
The calearcole shall be made from glue and boiling water by mixing 1 kg. Mixture shall be suitably tinted
where required for use under coloured distemper if required. Glue shall conform to I.S. 852-1969
(Specifications for animal glue).
Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and white in colour conforming to I.S. 712-1973.
Water shall conform to M-1 Best quality of gum shall be sued in the preparation of white wash. Ultramarine
blue or Indigo: This shall conform to I.S. 55-1970 for points and shall be used for preparation of white wash.
Pigments: mineral colours, not affected by lime shall be sued in preparing colour wash.
Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and stirred with about
five litres of water for 1 kg. of unslaked lime to make a thin cream. This shall be allowed to stand for a period
of 24 hours and then shall be screened through a clean coarse cloth, 4 kg. of gum dissolved in hot water
shall be added to each cubic metre of lime cream. Small quantity of ultramarine blut (Upto 3 gms. Per kg. of
lime) shall also be added to the last two coats of white wash solution and the whole solution shall be stirred
thoroughly before use.
Preparation of surface :
The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters before
white wash is to be applied.
The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or shall be
rubbed with over burnt surkhi or brick bats. The surface shall be then broomed to remove all dust, dirt and
shall be washed with clean water.
Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire brushes.
All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular patches and
plastered again after raking the masonry joints properly. Such portion shall be wetted and allowed to dry.
They shall then be given one coat of white wash.
All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with materials
similar in composition to the surface to be prepared.
Scaffolding : Wherever scaffolding is necessary it shall be erected in such a way that as far as possible on
part of scaffolding shall rest against the surface to be white or coloured washed. A properly secured strong
and well tied suspended platform (Zoola) may be used for white washing. Where ladders are sued, pieces of
old gunny bags shall be tied at top and bottom to prevent scratches to the floors and walls. For white
washing of ceilings proper stage scaffolding shall be erected where necessary.
Application of white wash :
On the surface so prepared the white wash shall be applied with ‘Moon’ brush. The first stroke of the brush
shall be from top downwards, another from bottom upwards over the first stroke and similarly one stroke
from the right another from the left, over the first stroke brush before the it dries. This will from one coat.
Each coat shall be allowed to dry before next coat is applied. Number coats as specified in item shall be
applied. It shall present smooth and uniform finish free from brush marks and it should not come off easily
when rubbed finger.
Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the surface
Priming and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke soot
removed of oil and grease spots treatment for infection with effloresces moulds moss, funji and kitchen and
patch repairs to plaster wherever done shall not be paid extra.
Mode of measurements & payment :
All the work shall be measured in the decimal system as under :
Dimensions shall be measured to the nearest 0.01 M.
Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not exceeding
0.5 sq. mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding 0.5 sq. mt. each in
area and for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in area deductions and
additions shall be made as under :
No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq. mt. each.
No addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish around ends of
joints, beams, posts etc.
Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows and
no addition shall be made for reveals, jambs, soffits etc. of these openings :
When both the faces or walls are provided with finish, deduction shall be made for one face only.
When each face of wall is provided with different finish deduction shall be made for that side of frame for door,
windows etc. on which width of reveals is less than that of the other side, where width of reveals on both faces of
wall are equal, deduction of 50% of area of opening on each face shall be made from total area of finish.
When only one face of wall is treated and the other face is not treated, full deduction shall be made if the width
of reveal on the treated side is less than that on the untreated side, but if the width of the reveal is equal or more
than on the untreated side neither deductions nor additions be made for reveals, jambs, soffits, sills etc.
In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs, soffits,
shall be measured.
No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be increased
by the following percentage and the resultant shall be included with the general areas.
Corrugated steel sheets 4%
Corrugated A. C. Sheets 20%
Semi corrugated A. C. Sheets 10%
Nainital pattern roof (Plain sheeting with rolls) 10%
Nainital pattern roof (with corrugated sheets) 25%
Cornices and other wall features, when they are not picked out in a different finish/colour shall be girthed and
included in the general area.
The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in all the
operations described above.
The rate shall be for a unit of one sq. metre.
Removing dry or oil bound distemper by a washing and scraping and sand papering the wall surface
smooth including necessary repairs to scratches complete.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (two coats) and of required shade
on wall surfaces of given an even shade, over and including a priming coat of whiting after thoroughly
brooming the surface free from mortar dropping and other foreign matter.
The rate shall be for a unit of one sq. metre.
Item no.83,84,85,86
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade on wall
surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose pieces of
scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade
on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose
pieces of scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade on wall
surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose pieces of
scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade
on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt, loose
pieces of scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Item no.92,93,94
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved brand and
manufacture and of required shape even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved
brand and manufacture and of required shape even shade after thoroughly brushing the surface to remove all
dirt and remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Item no.96,97,98,99
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved brand and
manufacture and of required shape even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved
brand and manufacture and of required shape even shade after thoroughly brushing the surface to remove all
dirt and remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Applying priming coat over new steel and other metel surface after and including preparing
the surface by throughly cleaning, oil, grease, dirt and other foreign matter and scoured with
brushes fine steel wood, scrapers and sand paper with ready mixed priming paint brushing red
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel paint,
brushing, interior to give an even shade including cleaning the surface an even shade including
cleanicn the surface of all dirt, dust and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously painted steel and other metal surface
with enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust
and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on new steel and other metal surface with synthetic enamel
paint, brushing to give an even shade including cleaning the surfaceofalldirt,dustandother foreign
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously printed steel and other metal surface with
synthetic enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust
and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on external surface of new rain water, soil, waste
and vent pipes and fittings with ready mixed bituminous brushing, black, anti corrosive to give
an even shade including cleaning of all dirt, dustand other foreign matter.(75 mm dia)
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on external surface of new rain water, soil, waste
and vent pipes and fittings with ready mixed bituminous brushing, black, anti corrosive to give
an even shade including cleaning of all dirt, dust and other foreign matter.(100 mm dia)
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with
enamel paint, interior to give an even shade including cleaning the surface of all dirt,
dust and other foreign matter sand papering and stopping. (a) Ready mixed paintbrushing wood
The rate shall be for a unit of one sq. metre
Painting one coats (excluding priming coat) on previously painted wood and wood based
surface with enamel paint, to give an even shade including cleaning the of all dirt, dust and other foreign
matter.(b) Ready mixed paintbrushing priming for enamel
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with ready mixed
paint, brushing, oil, gloss, semi gloss to give and even shade including cleaning of all dust, dirt and
other foreign matters and papering and stopping.
The rate shall be for a unit of one sq. metre
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose
powdered materials.etc complete
The rate shall be for a unit of one sq. metre
Applying two coats of Birla (white cement based) or Asian (acryliclapy-putty) or equivalent & two coats
of primer of approved brand and manufacture on new wall surface to give an even shade including
thoroughly brushing the surface free from mortar dropping and other foreign matter and sand papered
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with
enamel paint, interior to give an even shade including cleaning the surface of all dirt,
dust and other foreign matter sand papering and stopping.
The rate shall be for a unit of one sq. metre
Writing letter or figures on any surface with black japan paint (stops, comas, hyphens and the like not to
be measured and paid for separately) (i) Block (Letters/Figures) (Per 10 Letter pet CM.HT)
Extra over items for using thick white paint instead of black japan paint. (i)Block (Letters/Figures)
The rate shall be for a unit of per letterper Cm/Ht
Item no.100,101
Writing letter or figures on any surface with black japan paint (stops, comas, hyphens and the like not to
be measured and paid for separately) (ii) Indian (Letters/Figures)
Extra over items for using thick white paint instead of black japan paint. (ii) Indian (Letters/Figures)
The rate shall be for a unit of per letter per Cm/Ht. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in two coats with road marking
paint, brushing including cleaning the surface of all dirt, dust and other foreign matter. (i)Over 10cm in
The rate shall be for a unit of one sq. metre. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in two coats with road marking
paint, brushing including cleaning the surface of all dirt, dust and other foreign matter.(ii) Upto 10 cm in
The rate shall be for a unit of one RMT. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in one coats with road marking
paint, brushing including cleaning the surface of all dirt, dust and other foreign matter. (i)Over 10cm in
The rate shall be for a unit of one sq. metre. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in one coats with road marking
paint, brushing including cleaning the surface of all dirt, dust and other foreign matter. (ii) Upto 10 cm in
The rate shall be for a unit of one sq. metre. The work should be done as specified in above item.
Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all
lead and lift. (i) R.C.C. work
The rate shall be for a unit of one Cum. The work should be done as specified in above item.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal
of unserviceable materials with all lead and lift.(ii) In Cement Mortar.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.(ii) In Cement Mortar.
The rate shall be for a unit of one Cum
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materil as and
disposal of unserviceable materials with all lead and lift.
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materil as and disposal
of unserviceable materials with all lead and lift.
The rate shall be for a unit of one Sqm. The work should be done as specified in above item.
Dismentaling of sheet roofing including ridges, Hips, Valleys, Gutters etc. stacking of serviceable
materil as and disposal of unserviceable materials with all lead and lift.(i) G.I.sheet roofing.
Dismentaling of sheet roofing including ridges, Hips, Valleys, Gutters etc. stacking of serviceable materil
as and disposal of unserviceable materials with all lead and lift.(i) G.I.sheet roofing.
The rate shall be for a unit of one Sqm
Dismentling steel work including distempering and stacking the materials with all lead and lift.
Dismentling steel work including distempering and stacking the materials with all lead and lift.
The rate shall be for a unit of one Kg. The work should be done as specified in above item.
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves,
hold fasts and other attachment etc. complete and stacking the material within all lead and lift.(i) Not
exceeding 3 Sq.M. in area.
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves,
hold fasts and other attachment etc. complete and stacking the material within all lead and lift.(i) Not exceeding
3 Sq.M. in area.
The rate shall be for a unit of Each. The work should be done as specified in above item.