Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -0.50% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.3 L+₹1,122.19 (0.49%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹2.3 L+₹1,122.19 (0.49%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
EMD Value
₹4,580
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
C/O PCC Path with Steps from Road to Shabir Qureshi at Sultandhaki 1,0 tac C/O pcc path with Steps fiom Middle School danimar to Masjid Shareef 1.25 lacs under ADP at SULTANDAKI for year 2026-27, Block PARANPILAN
2026_RDPR_319182_26
179/Xen/Rew/Bla/2026-27 Dated 03/08/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹4,580
3 Sept 2026
3 Aug 2026
25 Aug 2026
3 Aug 2026
24 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.All kinds of soil : | 92.94 | sqm | - | - |
| 2 | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches including carriages of Stones.(Under foundation trench & Floors) | 7.48 | cum | - | - |
| 3 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M10 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 6.8 | cum | - | - |
| 4 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete,on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand). Ordinary cement without any pigment. | 55.76 | sqm | - | - |
| 5 | Providing 12mm plaster in 1:4 mix ratio( 1cement:4 fine sand) | 11.15 | sqm | - | - |
| 6 | Random Rubble masonry using hard stones in cement concrete 1:6:12 with hard stone in foundation and plinth including leveling up & curing.Complete job incl all carriages | 5.31 | cum | - | - |
| 7 | Random Rubble masonary in dry using hard stones in foundation and plinth including leveling up & curing | 12.39 | cum | - | - |
| 8 | P/L 40 mm thick coping over top of walls in M-15 grade of concrete | 9.29 | sqm | - | - |
| 9 | Carriage of materials from the approved sources to work site by mechnical Transport. | 17.85 | cum | - | - |
| 10 | Add cost of of sign board and photograph (to be paid as per actual) | 1 | job | - | - |
stage.html
html • 0.02 MB
finance_1056437.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1056437.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .