Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
9 Oct 2026, 10:01 amClosed
Bengaluru Water Supply And Sewerage Board
Naresh B.K
Project Management Consultancy Services for Replacement of HSC Pumps at CWSS Stage-I and Stage-II Pumping Stations at T.K. Halli, Harohalli and Tataguni (Call-2)
BWSSB/2026-27/SE0090/CALL-2
BWSSB/2026-27/SE0090/CALL-2
Open
Two Tender Document System(Two Cover)
BWSSB Executive Engineer Kaveri Operation and Maintenance One
5 documents required · 4 mandatory · 1 optional
The Consultant shall have successfully completed At least one (1) Water Supply project having Pump and electro-mechanical equipment installation with a minimum cost of Rs. 3917 Lakhs in last 10 years.
The Consultant shall have successfully completed At least one (1) Water Supply project of Upgradation/Rehabilitation of Pumping Station of minimum Installed capacity 300 MLD or two projects of having Installed pump capacity 150 MLD each during the last 10 years.
Adequacy of the proposed work plan and methodology in responding to the TOR
The number of points to be given for qualifications and competence of the key professional staff for the assignment.
₹2,180
₹1.7 L
1 Oct 2026
1 Oct 2026
12 Oct 2026
7 Oct 2026
Name of the Work: Project Management Consultancy Services (PMC) for Replacement of HSC Pumps at CWSS Stage-I and Stage-II Pumping Stations at T.K. Halli, Harohalli and Tataguni (Call-2)
Sl No Particulars Unit Qty Unit rates to be quoted
In figures In words
1 Project Management Consultancy Services (PMC) for Replacement of HSC Pumps at CWSS Stage-I and Stage-II Pumping Stations at T.K. Halli, Harohalli and Tataguni No 1
Terms and Conditions
1 All the works should be carried out as per KTPP Act and as per specification and as directed by the Engineer- in-charge.
2 Rates quoted above are including clearance of the site (prior to commencement of work and its completion) in all conditions of site, moisture, weather etc.
3 The Board reserves the right to bifurcate the work and entrust if warranted and if found expedient and advantageous to the Board of lowest approved rates.
4 The BWSSB reserves the right to accept or reject any OR all of the tenders without assigning any reason.
5 Rates should be exclusive of all taxes, insurance and freight charges.
6 Rates should be quoted by the contractor/firm on Item war basis both in figures and in words.
7 The payment will be made after completion of work.
8 The firm should have requisite man power, machineries at their disposal to complete the work within the stipulated period, the necessary documents should be enclosed.
9 The firm has to upload "Form of tender" in the standard format or otherwise, the tender will be liable for rejection.
Executive Engineer
Kaveri-Operation & Maintenance-1 Division,
Signature of the Contractor BWSSB, T.K.Halli.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Schedule B.xlsx
Others - Schedule-B • 0.01 MB
DTP - Call-2.docx
Tender Document • 0.44 MB
Reply to Pre Bid Queries.pdf
pdf • 3.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .