Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC KOHRAUL KHADIA P O YOGICHOURA DIST SONEBHADRA UP PIN 231222 | YOGICHOURA | SONEBHADRA | UTTAR PRADESH | 231222 | ₹2.4 L Quoted ₹2.0 L | L1 | Accepted-AOC Accepted on L1 basis |
| Sl No | Description | Qty | Unit | M/s B.K. Trading Company L1 |
|---|---|---|---|---|
| 1.00Repairing of Operator Cabin & Co-operator Cabin of 24/96 Saraswati & 15/90 Vijay Draglines at Jayant Project. | ||||
| 1.01 | Labour charges for repairing of Operator Cabin & Co-operator Cabin of 24/96 Saraswati & 15/90 Vijay Draglines at Jayant Project as per scope of work considering labour cost,Supervisor charge, contractor profit and any other Cost. | 2 | Job | 42,000 ₹84,000 |
| 1.02 | Cost of laminated Mica board 12mm for cabin 24/96 Saraswati dragline. | 372 | Sqft | 90 ₹33,480 |
| 1.03 | Cost of laminated Mica board 12mm for cabin 15/90 Vijay dragline. | 232 | Sqft | 90 ₹20,880 |
| 1.04 | Cost of safety glass of side door/panel & window(5mm) plus rubber bead | 2 | Job | 29 ₹58 |
| 1.05 | Cost of new floor mat | 174 | Sqft | 80 ₹13,920 |
| 1.06 | Cost of aluminum plate having thickness 1.5 mm | 124 | Sqft | 70 ₹8,680 |
| 1.07 | Cost of New door aluminum complete (back Door)/wooden flash Door | 2 | Nos. | 4,500 ₹9,000 |
| 1.08 | Cost of Hyd door closer | 2 | Nos. | 1,000 ₹2,000 |
| 1.09 | Cost of Adhesive(solution) | 20 | Ltr | 200 ₹4,000 |
Updated dates
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
11 Feb 2026, 11:00 amClosed
GM(Excv), Jayant Project
GM office, Jayant project, Singrauli, M.P-486890
Repairing of Operator Cabin and Co-operator Cabin of 24/96 Saraswati and 15/90 Vijay Draglines at Jayant Project.
2026_NCL_351876_1
JNT/GM(Excv)/E-tender/25-26/56
Open Tender
Excavation Department Work
365 days
Jayant Project
As per NIT
3 documents required · 3 mandatory
₹3,700
11 Apr 2026
27 Jan 2026
13 Feb 2026
27 Jan 2026
11 Feb 2026
28 Jan 2026
27 Jan 2026 - 31 Jan 2026
Repairing of Operator Cabin & Co-operator Cabin of 24/96 Saraswati & 15/90 Vijay Draglines at Jayant Project.
Labour charges for repairing of Operator Cabin & Co-operator Cabin of 24/96 Saraswati & 15/90 Vijay Draglines at Jayant Project as per scope of work considering labour cost,Supervisor charge, contractor profit and any other Cost.
Cost of laminated Mica board 12mm for cabin 24/96 Saraswati dragline.
Cost of laminated Mica board 12mm for cabin 15/90 Vijay dragline.
Cost of safety glass of side door/panel & window(5mm) plus rubber bead
Cost of new floor mat
Cost of aluminum plate having thickness 1.5 mm
Cost of New door aluminum complete (back Door)/wooden flash Door
Cost of Hyd door closer
Cost of Adhesive(solution)
Cost of heavy duty door lock
Cost of door handle
Repairing cost of 01 no operator seats
Cost seat cover with stitching charges
Cost of plywood (12mm) for pelmet
Cost of plywood for bench (12 mm thick)
Cost of curtain cloth and curtain rods
Cost for providing jute, foam, rexine for bench jute.
Hiring cost of tools & tackles
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_364649.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_364649.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid