Loading…
Loading…
Tender ID
Tender Value
₹39.1 L
EMD Value
₹40,000
Closing Date
9 Feb 2026, 4:00 pmClosed
Ex.Engineer, MGVCL Borsad Division
Erection, Dismantling and Maintenance of HT/LT Line and Transformer center at ANKLAV S/dn and Any other S/Dn under Borsad Division office area.
266151
BORSAD DIVISION/HT-LT-TC/2025-26/N Procure/PR-223281
Open
Electrical Works
Works
Anand
2 documents required · 1 mandatory · 1 optional
₹1,770
Yes
MADHYA GUJARAT VIJ COMPANY LIMITED
₹40,000
Yes
19 Jan 2026
19 Jan 2026
19 Jan 2026
9 Feb 2026
19 Jan 2026
SCHEDULE - B PR :-223281
WAT for erection & maintenance of HT/LT/TC under Anklav S/Dn or any s/Dn of Borsad div. cost data 2024-25
Item Code No. Description of Work Unit Qty. Rate in Rs.
HT TAPPING FROM THE EXISTING POLE INCLUDING FIXING OF CROSS ARMS, CLAMPS ANTI-
CLIMBING DEVICES, DANGER BOARD,INSULATORS, ETC, COMPLETE AND PAINTING OF
FABRICATED MATERIALS AND NUMBERING COMPLETE WITH COST OF PAINTS AS PER
STANDARD SPECIFICATION BUT EXCLUDINGERECTION OF GUY SET AND EARTHING
ERECTION OF PSC POLES OF 8 *200 KG INCLUDING EXCAVATION OF PIT AND REFILLING
OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES,
2 9902010001 INSULATORS ETC. COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE Number 1.00
POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT
EXCLUDINGERECTION OF GUY SET AND EARTHING
ERECTION STEEL POLES OF 8 TO 10 & 11 METERS INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS, ANTICLIMBING
DEVICES DANGER BOARD, INSULATORS, ETC. COMPLETE AND PAINTING OF STEEL POLE,
FABRICATED MATERIALS USED ON ON THE POLE AND NUMBERING WITH COST OF PAINT
AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUT SET AND
ERECTION STEEL POLES OF 13 METERS FOR RAILWAY CROSSING ON BG/MG/NG/LINE FOR
0.400/11/22KV OVERHEAD LINE I.E. INCLUDING EXCAVATION OF PIT AND REFILLING OF
EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS, ANTICLIMBING DEVICES DANGER
BOARD, INSULATORS, ETC. COMPLETE AND PAINTING OF STEEL POLES, FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE OF 8 METERS PSC POLE INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS, SUPPORTING
ANGLES , CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS, INSULATORS, ETC.,
COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THE POLES AND
NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SETS AND EARTHING. ( W/O AB SWITCH ).
ERECTION OF DOUBLE POLE STRUCTURE OF 8 TO 9 METERS STEEL POLE INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS, SUPPORTING
ANGLES , CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS, INSULATORS, ETC.,
COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THE POLES AND
NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SETS AND EARTHING. ( W/O AB SWITCH ).
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF AB SWITCH / HG FUSES OF
8 METERS, 200 KG PSC POLES INCLUDING EXCA-VATION OF PITS AND REFILLING OF
EARTH, FIXING OF CHANNELS,SUPPORTING ANGLES CLAMPS, ANTI-CLIMBING DEVICES
7 9902020006 DANGER BOARD, INSULATORS, DO FUSES, ETC., COMPLETE AND PAINTING OF Number 1.00
FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINTS
AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF AB SWITCH / HG FUSES,
& 11 METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,
FIXING OF CHANNELS, SUPPORTING ANGLE CLAMPS, ANTI-CLIMBING DEVICES , DANGER
BOARDS, INSULATORS, ETC., COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OF AB SWITCH / HG FUSES,
13 METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,
FIXING OF CHANNELS, SUPPORTING ANGLE CLAMPS, ANTI-CLIMBING DEVICES , DANGER
BOARDS INSULATORS, ETC COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS
USED ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF SINGLE POLE STRACTURE WITH MOUNTING OF HG FUSES, 5 KVA
TRANSFORMERS, LIGHTENING ARRESTERS AND WITHOUT DISTRIBUTION BOX ETC OF
METERS 200 KG PSC POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,
CARTING OF TRANSFORMERS FROM STORE TO SITE, FIXING OF CHANNELS SUPPORTING
ANGLES, BRACING CROSS ARMS, CLAMPS ANTI-CLIMBING DEVICE DANGER BOARDS
CONDUCTOR AND CABLE WIRING ETC., COMPLETE AND PAINTING OF FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
SCHEDULE - B PR :-223281
WAT for erection & maintenance of HT/LT/TC under Anklav S/Dn or any s/Dn of Borsad div. cost data 2024-25
Item Code No. Description of Work Unit Qty. Rate in Rs.
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF HG FUSES,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX ETC. OF 8 METERS
KG PSC POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH, CARTING
11 9902030001 OF TRANSFORMERS, FROM STORE TO SITE FIXING OF CHANNELS SUPPORTING ANGLES, Number 1.00
BRACING CROSS ARMS, CLAMPS ANTI-CLIMBING DEVICE DANGER BOARDS CONDUCTOR
AND CABLE WIRING ETC.,COMPLETE AND PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF SINGLE POLE STRACTURE WITH MOUNTING OF A B SWITCH, HG FUSE,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX 8 TO 9 & 11 METERS
STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,CARTING OF
12 9902030024 TRANSFORMERS FROM STORE TO SITE,FIXING OF CHANNELS, SUPPORTING ANGLES, Number 1.00
BRACING, CROSS ARMS,CLAMPS, ANTI CLIMBING, DEVICES, DANGER BOARDS,
CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OF A B SWITCH, HG FUSE,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX 8 TO 9 & 11 METERS
STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH,CARTING
13 9902030012 OF TRANSFORMERS FROM STORE TO SITE,FIXING OF CHANNELS, SUPPORTING ANGLES, Number 1.00
BRACING, CROSS ARMS,CLAMPS, ANTI CLIMBING, DEVICES, DANGER BOARDS,
CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF GUY SETS INCLUDING EXCAVATION OF PITS & REFILING OF EARTH, AS PER
STANDARD SPECIFICATION WITH STAY CLAMPS STAY WIRES, ANCHOR ROD, TURN
BUCKLE, EYE BOLT, GUY INSULATOR, CEMENT CONCRETE BLOCK, ETC., BUT EXCLUDING
CONCRETING/ MUFFING OF POLES GUY ETC., INCLUDING COST OF CEMENT,AND
15 9905010001 Cubic Meter 1.00
METAL (1:2:4) AND WATER ETC., AS PER C.C.M-20 GRADE STANDARD SPECIFICATION .
ERECTION COIL TYPE EARTHING INCLUDING COST OF COIL,COAL SALT, ETC BUT
WITHOUT COST OF G I WIRE AS PER STANDARD SPECIFICATION 10 KG SOLT + 10KG
COAL. FOR CONSUMER OR POLE AS PER TECHNICAL SPECIFICATION PROVIDED WITH
ERECTION OF GI PIPE / C I PLATE TYPE EARTHING INCLUDING COST COAL SALT, ETC BUT
17 9902040003 WITHOUT COST OF GI PIPE / CI PLATE AS PER STANDARD SPECIFICATION…20 KG SOLT + Number 1.00
SRTINGING OF 34MM2 ,55MM2,AAA CONDUCTOR, FOR 11 KV & L.T. LINE INCLUDING FIXING
18 9903000001 Kilo Meter 1.00
OF INSULATORS, BINDING, JUMPERING, ETC.
SRTINGING OF 100 MM2, ACSR/DOG CONDUCTOR, FOR 11 KV & L.T.LINES
19 9903000002 Kilo Meter 1.00
INCLUDING FIXING OF INSULATORS, BINDING, JUMPERING, ETC.
THE WORK OF STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL
ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION CLAMP, FIXING OF CROSS
20 9903000006 ARM, L.T. SHACKLE INSULATOR , ETC. FOR FIXING OF MESSAGER WIRE COMPLETE, AS Kilo Meter 1.00
REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE A:
THE WORK OF STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL
ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION CLAMP, FIXING OF CROSS
21 9903000005 ARM, L.T. SHACKLE INSULATOR , ETC. FOR FIXING OF MESSAGER WIRE COMPLETE, AS Kilo Meter 1.00
REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE A:1
THE WORK OF STRINGING OF 11 KV ABC OF FOLLOWING SIZES IN URBAN AREA
INCLUDING FITTING OF ALL ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION
22 9903000007 CLAMP, FIXING OF CROSS ARM, BINDING TO PIN INSULATOR,PREPARING SHCKLE POINT Kilo Meter 1.00
JUMPERS ETC AS REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE A:
THE WORK OF STRINGING OF 11 KV ABC OF FOLLOWING SIZES IN RURAL AREA
INCLUDING FITTING OF ALL ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION
23 9903000007 CLAMP, FIXING OF CROSS ARM, BINDING TO PIN INSULATOR,PREPARING SHCKLE POINT Kilo Meter 1.00
JUMPERS ETC AS REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE
24 9906000002 PROVIDING GUARDING TO HT LINE ON ROAD/RAIL CROSSING Meter 1.00
25 9906000001 PROVIDING GUARDING OF LT LINE ON ROAD/RAIL CROSSING Meter 1.00
26 9901000002 LT LINE TAPPING SINGLE PHASE. Number 1.00
27 9901000003 LT LINE TAPPING THREE PHASE. Number 1.00
Dismentalling of all size (8,9,11,13…mtrs.) of RSJ (girder) Poles including dimentalling of relevant
channels, cross arms insulators, jumpers, binding, earthing etc. including crediting in store
Dismentalling of PSC Poles including dimentalling of relevant channels, cross arms insulators,
jumpers, binding, earthing etc. including crediting in store
SCHEDULE - B PR :-223281
WAT for erection & maintenance of HT/LT/TC under Anklav S/Dn or any s/Dn of Borsad div. cost data 2024-25
Item Code No. Description of Work Unit Qty. Rate in Rs.
30 9907000009 Dismentalling of conductor from line. including crediting in store Kilo Meter 1.00
31 9907000012 Dismentalling of PSC Pole D.P.Structure. including crediting in store Number 1.00
32 9907000013 Dismentalling of RSJ Pole D.P.Structure. including crediting in store Number 1.00
33 9907000025 Dismentalling of 2 W A.B.Cable from line. including crediting in store Kilo Meter 1.00
34 9907000025 Dismentalling of 4 w A.B.Cable from line. including crediting in store Kilo Meter 1.00
35 9907000025 Dismentalling of HT A.B.Cable from line. including crediting in store Kilo Meter 1.00
INSTALLATION OF ENERGY METER & MMB/SMC BOX WITH ELECTRICAL WIRING ON
PROVIDING SINGLE PHASE SERVICE CONNECTION WITH PVC CABLE FROM
TERMINAL POLE TO METERING POINT INCLUDING FIXING OF METER
PROVIDING THREE PHASE FOUR WIRE SERVICE CONNECTION WITH PVC CABLE
FROM TERMINAL POLE TO METERING POINT INCLUDING FIXING OF METER
39 9909000001 CARTING OF PSC POLE AT DESTINATION(ABOVE 5 KM) Number 1.00
40 9909000006 CARTING OF RSJ POLE AT DESTINATION(ABOVE 5 KM) Number 1.00
REPLACEMENT OF FAIL TRANSFORMER & AUGMENTATION / DEAUGMENTATION
41 9908000049 OF TRANSFORMER(ANY CAPACITY) INCLUDING TRANSPORTATION & CREDIT OF Number 1.00
OLD TRANSFORMER AT S/DN STORE
HT TAPPING FROM THE EXISTING POLE INCLUDING FIXING OF CROSS ARMS, CLAMPS ANTI-
CLIMBING DEVICES, DANGER BOARD,INSULATORS, ETC, COMPLETE AND PAINTING OF
FABRICATED MATERIALS AND NUMBERING COMPLETE WITH COST OF PAINTS AS PER
STANDARD SPECIFICATION BUT EXCLUDINGERECTION OF GUY SET AND EARTHING
ERECTION OF PSC POLES OF 8 *200 KG INCLUDING EXCAVATION OF PIT AND REFILLING
OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES,
43 9902010001 INSULATORS ETC. COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE Number 1.00
POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT
EXCLUDINGERECTION OF GUY SET AND EARTHING
ERECTION STEEL POLES OF 8 TO 9 & 11 METERS INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS, ANTICLIMBING
DEVICES DANGER BOARD, INSULATORS, ETC. COMPLETE AND PAINTING OF STEEL POLE,
FABRICATED MATERIALS USED ON ON THE POLE AND NUMBERING WITH COST OF PAINT
AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUT SET AND
ERECTION STEEL POLES OF 13 METERS FOR RAILWAY CROSSING ON BG/MG/NG/LINE FOR
0.400/11/22KV OVERHEAD LINE I.E. INCLUDING EXCAVATION OF PIT AND REFILLING OF
EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS, ANTICLIMBING DEVICES DANGER
BOARD, INSULATORS, ETC. COMPLETE AND PAINTING OF STEEL POLES, FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE OF 8 METERS PSC POLE INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS, SUPPORTING
ANGLES , CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS, INSULATORS, ETC.,
COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THE POLES AND
NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SETS AND EARTHING. ( W/O AB SWITCH ).
ERECTION OF DOUBLE POLE STRUCTURE OF 8 TO 9 METERS STEEL POLE INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS, SUPPORTING
ANGLES , CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS, INSULATORS, ETC.,
COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THE POLES AND
NUMBERING WITH COST OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SETS AND EARTHING. ( W/O AB SWITCH ).
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF AB SWITCH / HG FUSES OF
8 METERS, 200 KG PSC POLES INCLUDING EXCA-VATION OF PITS AND REFILLING OF
EARTH, FIXING OF CHANNELS,SUPPORTING ANGLES CLAMPS, ANTI-CLIMBING DEVICES
48 9902020006 DANGER BOARD, INSULATORS, DO FUSES, ETC., COMPLETE AND PAINTING OF Number 1.00
FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINTS
AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF AB SWITCH / HG FUSES,
& 11 METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,
FIXING OF CHANNELS, SUPPORTING ANGLE CLAMPS, ANTI-CLIMBING DEVICES , DANGER
BOARDS, INSULATORS, ETC., COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OF AB SWITCH / HG FUSES,
13 METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,
FIXING OF CHANNELS, SUPPORTING ANGLE CLAMPS, ANTI-CLIMBING DEVICES , DANGER
BOARDS INSULATORS, ETC COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS
USED ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
SCHEDULE - B PR :-223281
WAT for erection & maintenance of HT/LT/TC under Anklav S/Dn or any s/Dn of Borsad div. cost data 2024-25
Item Code No. Description of Work Unit Qty. Rate in Rs.
ERECTION OF SINGLE POLE STRACTURE WITH MOUNTING OF HG FUSES, 5 KVA
TRANSFORMERS, LIGHTENING ARRESTERS AND WITHOUT DISTRIBUTION BOX ETC OF
METERS 200 KG PSC POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,
CARTING OF TRANSFORMERS FROM STORE TO SITE, FIXING OF CHANNELS SUPPORTING
ANGLES, BRACING CROSS ARMS, CLAMPS ANTI-CLIMBING DEVICE DANGER BOARDS
CONDUCTOR AND CABLE WIRING ETC., COMPLETE AND PAINTING OF FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRACTURE WITH MOUNTING OF HG FUSES,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX ETC. OF 8 METERS
KG PSC POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH, CARTING
52 9902030001 OF TRANSFORMERS, FROM STORE TO SITE FIXING OF CHANNELS SUPPORTING ANGLES, Number 1.00
BRACING CROSS ARMS, CLAMPS ANTI-CLIMBING DEVICE DANGER BOARDS CONDUCTOR
AND CABLE WIRING ETC.,COMPLETE AND PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF SINGLE POLE STRACTURE WITH MOUNTING OF A B SWITCH, HG FUSE,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX 8 TO 9 & 11 METERS
STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILING OF EARTH,CARTING OF
53 99230017 TRANSFORMERS FROM STORE TO SITE,FIXING OF CHANNELS, SUPPORTING ANGLES, Number 1.00
BRACING, CROSS ARMS,CLAMPS, ANTI CLIMBING, DEVICES, DANGER BOARDS,
CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OF A B SWITCH, HG FUSE,
TRANSFORMERS, LIGHTENING ARRESTERS, DISTRIBUTION BOX 8 TO 9 & 11 METERS
STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH,CARTING
54 9902030012 OF TRANSFORMERS FROM STORE TO SITE,FIXING OF CHANNELS, SUPPORTING ANGLES, Number 1.00
BRACING, CROSS ARMS,CLAMPS, ANTI CLIMBING, DEVICES, DANGER BOARDS,
CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THE POLES AND NUMBERING AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF GUY SETS INCLUDING EXCAVATION OF PITS & REFILING OF EARTH, AS PER
STANDARD SPECIFICATION WITH STAY CLAMPS STAY WIRES, ANCHOR ROD, TURN
BUCKLE, EYE BOLT, GUY INSULATOR, CEMENT CONCRETE BLOCK, ETC., BUT EXCLUDING
CONCRETING/ MUFFING OF POLES GUY ETC., INCLUDING COST OF CEMENT,AND
56 9905010001 Cubic Meter 1.00
METAL (1:2:4) AND WATER ETC., AS PER C.C.M-20 GRADE STANDARD SPECIFICATION .
ERECTION COIL TYPE EARTHING INCLUDING COST OF COIL,COAL SALT, ETC BUT
WITHOUT COST OF G I WIRE AS PER STANDARD SPECIFICATION 10 KG SOLT + 10KG
COAL. FOR CONSUMER OR POLE AS PER TECHNICAL SPECIFICATION PROVIDED WITH
ERECTION OF GI PIPE / C I PLATE TYPE EARTHING INCLUDING COST COAL SALT, ETC BUT
58 9902040003 WITHOUT COST OF GI PIPE / CI PLATE AS PER STANDARD SPECIFICATION…20 KG SOLT + Number 1.00
SRTINGING OF 34MM2 ,55MM2,AAA CONDUCTOR, FOR 11 KV & L.T. LINE INCLUDING FIXING
59 9903000001 Kilo Meter 1.00
OF INSULATORS, BINDING, JUMPERING, ETC.
SRTINGING OF 100 MM2, ACSR/DOG CONDUCTOR, FOR 11 KV & L.T.LINES
60 9903000002 Kilo Meter 1.00
INCLUDING FIXING OF INSULATORS, BINDING, JUMPERING, ETC.
THE WORK OF STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL
ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION CLAMP, FIXING OF CROSS
61 9903000006 ARM, L.T. SHACKLE INSULATOR , ETC. FOR FIXING OF MESSAGER WIRE COMPLETE, AS Kilo Meter 1.00
REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE A:
THE WORK OF STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL
ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION CLAMP, FIXING OF CROSS
62 9903000005 ARM, L.T. SHACKLE INSULATOR , ETC. FOR FIXING OF MESSAGER WIRE COMPLETE, AS Kilo Meter 1.00
REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE A:1
THE WORK OF STRINGING OF 11 KV ABC OF FOLLOWING SIZES IN URBAN AREA
INCLUDING FITTING OF ALL ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION
63 9903000007 CLAMP, FIXING OF CROSS ARM, BINDING TO PIN INSULATOR,PREPARING SHCKLE POINT Kilo Meter 1.00
JUMPERS ETC AS REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE
THE WORK OF STRINGING OF 11 KV ABC OF FOLLOWING SIZES IN RURAL AREA
INCLUDING FITTING OF ALL ACCESSRIES I.E. SPECIAL DESIGN SUSPENSION / TENASION
64 9903000007 CLAMP, FIXING OF CROSS ARM, BINDING TO PIN INSULATOR,PREPARING SHCKLE POINT Kilo Meter 1.00
JUMPERS ETC AS REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE A:
65 9906000002 PROVIDING GUARDING TO HT LINE ON ROAD/RAIL CROSSING Meter 1.00
66 9906000001 PROVIDING GUARDING OF LT LINE ON ROAD/RAIL CROSSING Meter 1.00
67 9901000002 LT LINE TAPPING SINGLE PHASE. Number 1.00
68 9901000003 LT LINE TAPPING THREE PHASE. Number 1.00
INSTALLATION OF ENERGY METER & MMB/SMC BOX WITH ELECTRICAL WIRING
PROVIDING SINGLE PHASE SERVICE CONNECTION WITH PVC CABLE FROM
TERMINAL POLE TO METERING POINT INCLUDING FIXING OF METER
PROVIDING THREE PHASE FOUR WIRE SERVICE CONNECTION WITH PVC CABLE
FROM TERMINAL POLE TO METERING POINT INCLUDING FIXING OF METER
SCHEDULE - B PR :-223281
WAT for erection & maintenance of HT/LT/TC under Anklav S/Dn or any s/Dn of Borsad div. cost data 2024-25
Item Code No. Description of Work Unit Qty. Rate in Rs.
Maintanance work
72 9911000071 Petrolling of HT /LT ine per pole & submission of summary report Number 6.00
73 9911000189 Cutting of tree branches obstructing HT / LT line on one tree Per Tree 1.00
74 9911000009 Cottig of bigger size of tree branches / whoe tree obstructing HT / LT line Number 1.00
75 9911000190 RE-JUMPERING OF HT/LT LINE FOR SHACKLE POLE Per Pol 1.00
76 9902010006 ERECTION OF SUPPORT POLE - PSC Number 1.00
77 9902010007 ERECTION OF SUPPORT POLE - RSJ Number 1.00
REPLACEMENT OF POLE MOUNTED 1PH SERVICE CONNECTION BOX INCLUDING
RECONNECTING ALL CONNECTIONS
79 9911000229 PIN BINDING OF 11KV PIN INSULATOR Per Pol 1.00
80 9911000230 PIN BINDING OF LT LINE PIN OR SHACKLE INSULATOR Per Pol 1.00
81 9908000003 REPLACEMENT OF 11 KV DISC INSULATOR Number 1.00
82 9908000166 REPLACEMENT OF LT PIN /SHACKLE INSULATOR Number 1.00
83 9908000451 Replacement of 11KV PIN insulator by new Pin Insulator /Composite Pin Insulator Number 1.00
84 9908000461 STRAIGHTENING OF TILTED PSC/RSJ POLE AT PIN POINT Number 1.00
85 9908000462 STRAIGHTENING OF TILTED PSC/RSJ POLE AT TENSION POINT Number 1.00
STRAIGHTENING OF TILTED D.P. SET(PSC/GIRDER POLE) ETC WITH REFILLING OF
STONES,MORUM ETC.
87 9911000225 RE-STRINGING OF DOG CONDUCTOR WITH NEW DOUBLE PIN BINDING Per Span 1.00
REFFIXING AND CHANGING HEIGHT OF TOP FITTING X ARM IN PROPER
88 9911000010 POSITION.WITH SHORT FALL BOLTS AND NUTS.TO BE PROVIDING BY Number 1.00
CONTRACTOR AND DRILING OF ADDITIONAL HOLES.
89 9908000001 REPLACEMENT OF V CROSS - ARMS Set 1.00
90 9908000051 REPLACEMENT OF TOP FITTING Number 1.00
91 9911000226 REFIXING OF TOP FITTING IN PROPER POSITION Number 1.00
92 9908000007 REPLACEMENT OF LT CROSS - ARMS Number 1.00
PROVIDING DO FUSE OR AB SWITCH ON DO (FOR ONE SET) WITH FABRICATION &
93 9908000169 COLOUR CODE JUMPER,INCLUDING PROPER ALIGNMENT OF AB SWITCH Number 1.00
NUMBERING THE POLE WITH PAINT BY PREPARING BACK GROUND OF REQUIRED
HEIGHT SURFACE OF ONE COLOUR AND HAVE LETTERING ( 2" & 3" HT ) AS
94 9911000001 DIRECTED BY IN CHARGE ENGINEER .THE TWO COLOUR SHOULD HAVE BEEN Number 1.00
SLECTED AS TO HAVE CONTRAST FOR PROPER READABILITY.(REQUIRED
COLOUR TO BE PROVIDED BY CONTRACTER)
FIXING OF SMC (3-Phase) AT CONSUMER INSTALLATION ( INCLUDING COST OF
FIXING OF SMC (1-Phase) AT CONSUMER INSTALLATION ( INCLUDING COST OF
97 9908000167 REPLACEMENT OF METER (1 PH) WITH WIRING - Urban Number 1.00
98 9908000168 REPLACEMENT OF METER (1 PH) WITH WIRING - Rural Number 1.00
99 9911000227 PROVIDING (PAINTING ) CONSUMER No ON SMC/MMB - Rural Number 1.00
100 9911000228 PROVIDING (PAINTING ) CONSUMER No ON SMC/MMB - Urban Number 1.00
REPLACEMENT OF SINGLE PHASE OLD SERVICE BY NEW SERVICE INCL
101 9908000016 .SHORTFALL REEL INSULATORS, EGG INSULATORS, NAILS, FIXING FASTNERS Number 1.00
102 9908000050 REFITTING /REPLACEMENT OF LIGHTENING ARRESTOR Number 1.00
REPAIRING/ADJUSTING TENSION OF EXISTING GUY/STAY SET INCLUDING
PROVIDING/REPLACEMENT OF STAY INSULATOR
REPLACEMENT OF OLD DISTRIBUTION BOX 200 KVA & ABOVE WITH MAKING ALL
CONNECTIONS CRIMPING OF LUGS,NEUTRAL ETC
REPLACEMENT OF OLD DISTRIBUTION BOX UP TO 100 KVA & BELOW WITH
MAKING ALL CONNECTIONS CRIMPING OF LUGS,NEUTRAL ETC
RESTRINGING OF HT/LT LINE (55/34 MM2 ) CONDUCTORS / COATED CONDUCTOR
WITH NEW DOUBLE PIN BINDING PER SPAN
107 9902010006 ERECTION OF SUPPORT POLE - PSC/RSJ POLE Number 1.00
REPLACEMENT OF OLD JUMPERS BY NEW JUMPERS/BINDING/LUGS FROM LA TO
108 9911000231 Per Jumper 1.00
DO FUSE OR DO FUSE TO T/C
109 9911000072 THREAD BURNING OF HT/LT LINE INCLUDING COST OF OIL, BAMBOO ETC.. Span 1.00
110 9903000007 RE STRINGING OF HT AERIAL BUNCH CABLE 3 WIRE (ALL SIZES) Span 1.00
SCHEDULE - B PR :-223281
WAT for erection & maintenance of HT/LT/TC under Anklav S/Dn or any s/Dn of Borsad div. cost data 2024-25
Item Code No. Description of Work Unit Qty. Rate in Rs.
DISMENTALLING OF HT AREAL BUNCH CABLE 3 WIRE [ALL SIZE] DISMENTALING +
111 9911000163 Kilo Meter 1.00
CONVERTING 3 CORE ABC INTO 3 NOS SINGLE CORE CABLE
112 9907000032 Unbundling of HT ABC Kilo Meter 1.00
113 9907000034 Stringing of Unbundle HT AB Cable Kilo Meter 2.00
114 9911000291 Fixing of Fabrication V-CROSS ARM, TOP WITH JUMPERING for un bundled ht abc Number 9.00
115 9911000292 Fixing of Fabrication PIN-INSULATOR WITH SPINDLE for un bundled ht abc Number 4.00
116 9911000293 Fixing of Fabrication SACKLE INSULATOR WITH HAR-DWARE for un bundled ht abc Number 1
117 9913000020 Digging of TAR road per Meter meter 10
HEAT SHRINKABLE TYPE CABLE JOINTING KIT SUITABLE FOR 11 KV 1CX70 /1CX95
SQMM AB CABLE FOR OUTDOOR TERMINATION APPLICATION
TOTAL AMOUNT 39,07,449/-
TOTAL AMOUNT 39,07,449/-
Schedule quantity may be increase or decrease but total order value will not increase. Rate from sr. no. 42 to 71 is for cyclone damage /
1 emergency works only & from sr. no. 72 to 110 for maintenance work. Labour cost data considerd fro year 2024-25.
2 Contractor have to carry out maintenance work of 20 % of total order value issued.
Note: As far as possible there should not be a situation where re carting is required for more than 5 Kms. Poles should be carted from Pole factory nearer to
3 the pole requirement, However in exceptional circumstances if re carting is required for more than 5 Kms up to 10 Kms then the carting rates specified may
be paid with specific justification of requirement of carting for more than 5 Kms and with prior approval of EE of division”.
N.B.:- The above rates mentioned from sr. no. 42 to 71 (20% higher rates) are applicable to carryout miscellaneous emergancy work such as
4 Cyclone,Flood,Earthquaque & Accidental damaged by the vehicle, in time bound programme. It is inclusive of dismentling & refitting line materials
etc. and dismentalling of damaged structure.
5 Time limit for ABove work is 365 days from date of issue work order
6 On receipt of Sub work Order, immediately contact Engineer Inchargeof Concern S/dn for line marking of erection work.
7 Work should be carried out under supervision of authorized MGVCL staff only.
8 T.S wise / Work wise material account of sub works order must be given separately.
9 The materials requisition (M.R) should be collected from Concern Sub Division office
If work is dealy for non-availABility of any material or objection of line erection work, must be inform to Concern
S/dn office in writing.
11 For extension of time limit of work order, you have to submit written request letter with valid genuine reason.
12 On completion of work, you have to credit all balance materials to sdn. store
You have to prepare & submit works bill for Above work within 07 days with material inventory sheet & Material
account sheet & MR/CR/Gate pass copy & HT/LT/TC erected network sketch
In case of any excess work required while actual execution of work you have to give written intimation to this office &
No excess work should be carried out without prior written permission / approval from competent authority.
15 Above work has to be carried out at any s/dn of Borsad Division as and when required.
16 For non -painting of RSJ Pole Rs.1132 per pole will be decucted from bill amount.
For non -painting of HT PSC/ RSJ Pole fabrication Rs. 123/- per pole & for NON PAINTAING OF PSC/RSJ DODP Rs. 383/- per DP, for non
paintaing of LT PSC/RSJ pole fabrication Rs. 91 per pole will be deducted from bill.
18 For non painting of Pole numbering Rs. 60/- wil be deducted per pole.
19 For live electric line crossing work, work should be carried out after Power cut-off and earthing of Line.
Signature of Contractor Executive Engineer
with Stamp MGVCL, DO, Borsad.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01_SCHEDULE B -223281_2024_25 cost data.pdf
02_General Terms Pre-Qualification Criteria.pdf
03_Commercial Terms and Conditions_.pdf
04_Div_Tender Notice - Borsad Town.pdf
05_Mandatory Use of Pole Erection Devices or Machines.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .