Assistant General Manager (Commercial)
Industrial All Risk Insurance Policy for 702.86 MW CCPP and 5 MW Solar Power Plant, Standalone Terrorism Insurance Policy, Standard Fire & Special Perils Insurance Policy, Public Liability Act Insurance Policy, Commercial General Liability Insurance Policy, Marine open policy for Inland transit, Marine Open Policy for Import/export, Money Insurance Policy, Electronic Equipment Insurance policy, All Risk insurance policy for Portable Electronic Equipment, Directors & Officers Liability Insurance policy, Workmen Compensation Insurance policy, Burglary-Floater Insurance policy, Fidelity Guarantee (Floater) Insurance policy and Commercial Crime Policy.
284806
GPPC/FIN/Insurance/2025-26/09
Open
Miscellaneous Services
Works
Gandhinagar
10 Mar 2026
10 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
All the relevant documents as per requirement of the Technical Bid document must be
submitted physically in sealed cover so that the same is received in this office on OR
before the due date and time.
BIDDERs are requested to submit price – BID on-line ONLY and not to submit the
price BID in physical form. Only on-line submitted price BID will be considered for
evaluation. Format for online price bid is at Annexure A to D of Volume II of this tender
The tentative timetable for the bid process is as follows:
Schedule of Dates
Last date of online submission of e-Tender
Submission of only Technical Bid documents with
supporting documents Physically to GPPC office at
If any of the dates mentioned above is declared a public holiday, the deadline will be the
next working day.
Condition for nprocure :
Digital Certificate:
Bidders who wish to participate in this E-Tender will have to procure valid digital
certificate as per Information Technology Act,
Bidder may contact M/s (n) code Solutions - A division of GNFC Ltd., Ahmedabad
for assistance at following address:
M/s. (n) code Solutions - A division of GNFC Ltd.
301, GNFC Info tower, S. G. Road, Bodakdev, Ahmedabad-380
Email: [email protected]
TOLL FREE NUMBER: 1-800-419-4632
Bidders who already have a valid Digital Certificate need not procure a new Digital
In case bidder needs any clarification/assistance or if any training required for
participating in online tender, they can contact the following office.
M/s. (n) code Solutions - A division of GNFC Ltd.
301, GNFC Info tower, S. G. Road, Bodakdev, Ahmedabad-380
Email: [email protected]
TOLL FREE NUMBER: 1-800-419-4632
I. The Physical Technical Bid to be submitted shall be addressed to GSPC
Pipavav Power Company Limited, FF Shed Nos. A/78/3-8, Besides Patni
computers (iGATE), Sector 25, GIDC Electronic Estate, Dist. Gandhinagar –
382016, Gujarat
II. The bidder must fill up all the Annexures and furnish all the required
information as per the instructions given in various sections of the tender
specifications.
Evaluation Criteria
Both Technical & Price bids will be evaluated as under.
a) All bidders must meet the Technical Criteria Specified in the bid
b) Price bids for plant will be ranked from lowest to highest
Volume – 1 Technical Bid.
1. Important Tender Conditions:
a. The selected Insurers must be licensed by IRDA as General Insurer (Please
provide copy of IRDA License issued to your company).
b. The selected insurers should have adequate Technical Experience & Financial
Capability to service insurance policies of Gas Based Combined Cycle Power
Plants. A list of such Policies being serviced may be provided. (Please attach latest
annual report and provide details as per Annexure 1)
c. The solvency margin of the company should be as per IRDA guidelines
except for Government insurance companies. (Please provide details as per
d. The Bidder must have Reinsurance arrangements with all Reinsurers having
minimum rating of “A” or “A-“ (of A.M. BEST) (Please provide details as per
e. The rates should be quoted exclusive of GST. No subsequent increase in
premium rates will be allowed under any circumstances.
f. The premium quoted by the Insurer will be considered as Full and Final Premium
to be paid by GPPC for the coverage sought in this bid. No subsequent increase
in premium rates will be allowed under any circumstances. (Please provide details
as per Annexure 4)
g. There must not be any breach of underwriting guideline as approved by the
Board/Committee of Insurance Co and filed with insurance Regulating authority
or any applicable law while making an offer. An undertaking to this effect may be
submitted as per Annexure
h. Apart from the insurance quote, you are also requested to offer the terms with
regard to your servicing, claim handling, value addition etc. if any. (format as per
i. GPPC also reserve the right to choose the Leader & Co-Insurer (s) as also
percentage sharing. GPPC reserves full right to divide the business between
underwriters as it deems fit.
j. GPPC reserves right to reject any tender/bid/offer without assigning any reason.
k. Copy of technical bid duly signed and stamped on all pages shall be submitted as
a mark of acceptance of all terms and conditions.
l. Detailed calculations for pricing/premium quoted shall be submitted as a part of
m. Clearly indicate Bid Participation / Capacity in the technical bid. Bid indicating
participation / capacity less than 60% shall not be accepted. However, the bidder
shall have to accept the sharing pattern as may be decided by GPPC at its sole
n. The offers/rates are required to be submitted in the form of Hard/Soft copy i.e.
Excel Sheet with proper links and discounts shall be submitted to GPPC as and
when requested.
o. The offer submitted by insurers should be valid for three months. In case GPPC
call the bidders for negotiations, such negotiations shall not amount to cancellation
or withdrawal of the original offer, which shall be binding on the bidders unless
otherwise agreed upon.
p. The quote for D & O policy must be accompanied by wording of the policy and all
extension endorsements. Quotes without appropriate wording shall be liable for
q. Insurers must quote for War Risk Buy Back cover for Limit / Sum Insured of
Rs.250 Cr. under Stand Alone Terrorism Policy. Premium for Stand Alone
Terrorism and War Buy-back cover must be separately mentioned in the quote.
r. This tender is a zero-deviation tender meaning that GPPC desires to have
coverage as requested in RFQ. However, if any insurer is deviating from the
scope of cover defined hereunder, the same may please be mentioned in the
Deviation Statement as per Annexure
s. Insurers may please note that GPPC has not engaged any intermediary like
agent or broker. Discount, if any, on this account may be passed over to GPPC.
Please furnish undertaking as per Annexure
t. Insurers will agree to following panel of surveyors. No other surveyors will be
appointed by insurers :
1. M/s. Mehta & Padamsey Insurance Surveyors Pvt. Ltd.
2. M/s. Bhatawadekar & Company
3. M/s. Proclaim Insurance Surveyors
u. THE PREMIUM AMOUNT WITH SPECIFIED ADD ON COVERS MUST BE
FURNISHED WITH THE PRICE BID only IN THE FORMAT ANNEXURE-A TO
D (OF VOLUME –II) ONLY. ANY MENTION OF PRICE IN ANY FORM IN THE
TECHNICAL BID WILL RESULT IN REJECTION OF THE BID. Non-submission
of information may invite disqualification and entitle GPPC to interpret the amount
quoted in the manner it deems fit.
v. Insurer must mention separately claim loading, if any, in the premium calculation.
w. Non-OEM Clause :
It is further noted and agreed that in the event of physical loss or damage to the
property insured hereunder the insured, at their sole discretion, shall have the
option to accept repair or replacement terms as offered by the Original Equipment
Manufacturer (OEM) regardless of any other terms offered from other suppliers,
manufacturers or fabricators. Provided always that the difference between the
OEM quote and the lowest quote doesn't exceed 25% of the lowest quote and
quotes are based on the same technological specifications.
Notwithstanding anything to the contrary above, insured will have the option to go
for repair/replacement from reputed non-OEM subject to quotes are based on the
same technological specifications.
x. The Technical Bid completed in all respects shall be submitted in sealed
envelopes super scribing “Technical Bid” on it, not later than 6.00 hrs on
18/03/2026 at the office of Chief Financial Officer, GPPC, Gandhinagar at the
below address. Please note that Technical bid cover should not contain any price
related information. If such violation is found, such bids will be summarily rejected.
Copy of technical bid duly signed and stamped on all pages shall be submitted as
a mark of acceptance of all terms and conditions. Detailed calculations for
pricing/premium quoted shall be submitted as and when required by GPPC.
y. The current values mentioned in the tender are based on the valuation report of
M/s.Proclaim Insurance Surveyors & Loss Assessors Pvt.Ltd.
Address for communication:
Chief Finance Officer
GSPC Pipavav Power Co. Ltd.
FF Shed Nos.a/78/3-8, Besides Patni computers (iGATE),
Sector 25, GIDC Electronic Estate,
Dist. Gandhinagar – 382016, Gujarat
2. Details of coverage required: -
REQUEST FOR QUOTE – INDUSTRIAL ALL RISKS (IAR) Policy of 702.86 MW CCPP
Name of Insured : M/s. GSPC Pipavav Power Company Limited
Correspondence : 2nd Floor, Besides Patni Computers (iGATE), FF Shed Nos. A/78/3-8,
Address GIDC Electronic Estate, Sector 25, Gandhinagar.
Occupation / Business : 702.86 MW Gas based Combined Cycle Power Plant
Units Capacity Commissioning Date
First Unit 351.43 MW 12th April
Second Unit 351.43 MW 5th February
Total 702.86 MW
Location of Risk : Power Plant Premises located at:
Village: Kovaya, Taluka: Rajula
District: Amreli -
State: Gujarat, India
Including property lying outside plant premises:
Seawater pipelines coming to plant from sea and effluent water
pipelines going from plant into sea and related foundation/anchoring
Period of Insurance : 12.04.2026 to 11.04.2027
Description of Property to be insured and Sum Insured
Section I – Material Damage
Description Total Sum Insured for
both Unit I & Unit II
Buildings incl. Plinth & Foundations, chain link fencings, any
other structures & civil works etc.
Plant & Machinery incl. piping & cabling, foundation,
accessories, electric`al installations, including Capital
Spares, FFF & Office Equipment incl. Computer Systems,
Peripherals etc
Stocks of Stores, Spares & Consumables, fuels, all other
stocks pertaining to the insured’s trade, including Stocks
held in trust etc., whilst located anywhere in the plant
premises incl. in open.
Seawater Intake & Effluent discharge pipeline (sub-sea)
buried 4 mtrs. Under seabed.
Earthquake (Fire & Shock)
Machinery Breakdown
Plant & Machinery incl. foundation, accessories, electrical
installations etc.
Fire Loss of Profit
Estimated Annual Gross Profit
Indemnity Period 12 Months
Basis Output Basis
Process: Batch / Cont. Continuous
Machinery Loss of Profit
Estimated Annual Gross Profit
Indemnity Period 12 Months
Basis Output Basis
Process: Batch / Cont. Continuous
Section I – Material Damage
Sr. Cover SI / Limit
1. Earthquake (Fire & Shock) TSI
3. Escalation clause 5% of BMA Sum Insured
4. Omission to insure additions, alterations or extensions etc. 5% of BMA Sum Insured
5. Removal of Debris (in excess of 1% of claim amount) INR 5 Crore
6. Architect, Surveyors & Consulting Engineers Fees (In INR 5 Crore
7. Involuntary Betterment/Technological INR 5 Crore
Advancements/Obsolete Equipment Clause
8. Start-up & Shut-down Exp. INR 20 Crore
9. Fire Fighting Expenses At actual
10. Loss minimization expenses INR 5 Crore
11. Minor Work INR 50 Crore
12. Expediting expenses INR 5 Crore
13. Immediate repairs INR 5 Crore
14. Impact Damage FULL Sum Insured
15. Preparation of Lost records/Computer Records, Valuable INR 5 Crore
Papers/Plans & Records Clause/Cost of Re-writing records
16. Additional Customs Duty INR 5 Crore
17. Demolition and Increased Cost of Construction INR 5 Crore
18. Property in Course of Construction/Erection INR 5 Crore
19. Undamaged Foundations INR 5 Crore
20. Obsolete Spare Parts INR 5 Crore
21. Sprinkler Up-Grading Costs INR 5 Crore
22. Deliberate Damage INR 5 Crore
23. Temporary Removal of Property / Stocks Clause INR 5 Crore
Section II – Business Interruption cover
1. Supplier Extension 20% of BI SI
Premises & pipeline network of gas suppliers and
transporters: Gujarat State Petroleum Corporation Ltd.
(GSPC) for supply of gas and Gujarat State Petronet
Limited (GSPL) for transportation of gas
2. Customer Extension 20% of BI SI
GUVNL / PGVCL/GETCO Substations at 1) Savarkundla,
Dist. Amreli, 2) Mahuva, Dist. Bhavnagar and 3) Amreli,
Dist. Amreli and transmission lines from GPPC power plant
to the substations
3. Denial of Access 20% of BI SI
4. Utility Extension 17% of BI SI
Public Utility Extension – Electricity from GUVNL / GETCO
Clauses : Section I – Material Damage
1. Earthquake (Fire & Shock) & STFI Cover
2. Agreed Bank Clause – As per list provided
3. Designation of Property
4. Local Authorities Clause
5. Architects, Surveyors & Consulting Engineers Fees Clause
(in excess of 3% of the claim amount)
6. Removal of Debris (in excess of 1% of the claim amount)
7. Omission to Insure additions, alterations or extensions etc.
8. Start-up and Shut-down expanses
9. 72 Hours Clause
10. On Account Payment Clause
11. Goods held in trust
12. Automatic Reinstatement Clause
13. Fire Fighting Expenses
14. Loss Minimization Expenses
15. Reinstatement Value Clause
16. Minor Work clause
17. Expediting expenses
18. Immediate repairs
19. Capital addition clause up to 10% of sum insured
20. Nominated Loss Adjuster Clause :
1. M/s. Mehta & Padamsey Insurance Surveyors Pvt.Ltd.
2. M/s. Bhatawadekar & Company
3. M/s. Proclaim Insurance Surveyors
21 Escalation clause
22 Impact damage clause
23 Involuntary Betterment clause
Section II – Business Interruption
1. Supplier Extension Clause
2. Customer Extension Clause
3. Public Utility Extension Clause
4. Departmental Clause
5. Alternative Basis Clause
6. Auditor's Fees and Claim preparation expenses up to INR
7. Sum Insured Adjustment Clause
8. Fixed Cost reimbursement as per endorsement.
9. Denial of Access
10. Local Authority Clause
11. Additional Increased cost of working
Basis of Sum Insured : Reinstatement Value Basis
Deductible / : Material Damage Claims :
Time Excess 5% of claim amount subject to a minimum of Rs.1.25 Crores.
Business Interruption:
FLOP - 30 Days of Standard Gross Profit
MLOP – 45 Days of Standard Gross Profit
Claim Experience: : Year Premium (Ex.
GST) Claim experience for last 5 years
TOTAL 23,72,17,712 12.50 Cr. (Outstanding)
Risk Assessment : The soft copy of Risk Inspection report of the Power Plants prepared
Report copy attached by M/s Unison Insurance Broking Services Pvt. Ltd in January
after risk assessment study conducted by them is being emailed to you
Special Condition 1. Midterm enhancement/reduction of PD & BI sum insured shall be
allowed during the policy period with same rate, terms and conditions
on payment of premium on prorate basis. Same will be applicable for
extension of the policy beyond 12 months.
2. BI loss during “No Demand” period
If the plant is available for generation but is not operational only
because of “No Demand” from GUVNL/Procurer (referred in
subsequent places as purchaser) GPPC receives Fixed Cost from the
Notwithstanding to anything to the contrary mentioned elsewhere in the
policy it is agreed that in case of an indemnifiable loss to the property
during the above mentioned period the Fixed cost which the insured
would have otherwise received from Purchaser had the loss not
occurred would form part of the BI claim.
Name of Financial 1. Working capital limit : Punjab National Bank
REQUEST FOR QUOTE - STANDALONE TERRORISM POLICY
(Including War risk Buy Back)
Sr. Particulars Descriptions
1 Name of the Insured M/s . GSPC Pipavav Power Company Limited
2 Correspondence 2nd Floor , Besides Patni Computers (iGATE),
Address FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
3 Location of Risk Power Plant Premises located at:
Village: Kovaya, Taluka: Rajula
District: Amreli -
State: Gujarat, India
Including property lying outside plant premises:
Seawater pipelines coming to plant from sea and effluent water
pipelines going from plant into sea and related foundation/anchoring
4 Insured’s Trade or Power Generation - 351.43 MW X 2 = Total 702.86 MW Gas based
Business Combined Cycle Power Plant
5 Period of Insurance 12.04.2026 to 11.04.2027
6 Details of property
insured and sum
insured details Description Total Sum
Insured for both
Unit I & Unit II
Buildings incl. Plinth & Foundations, chain
link fencings, internal roads, any other
structures & civil works etc.
Plant & Machinery incl. piping & cabling,
foundation, accessories, electrical
installations, FFF & Office Equipments incl.
Computer Systems, Peripherals etc
Stocks of Stores, Spares & Consumables,
fuels, all other stocks pertaining to the
insured’s trade, including Stocks held in
trust etc., whilst located anywhere in the
plant premises incl. in open.
Seawater Intake & Effluent discharge
pipeline (sub-sea) buried 4 mtrs. Under
Site Office, Guest House & Gandhinagar
Office including contents cover under SFSP
Total Sum Insured-MD
Total Sum Insured -Business
(Indemnity period – 12 months) Output
Total (MD + BI) Sum Insured
Section – 1 : Material Damage
7 Limit of Indemnity for INR 2050,00,00,000 each occurrence and in the aggregate
8 Limit of Indemnity for INR 250,00,00,000/-
9 Deductible Property Damage : INR 25,00,000/- each and every occurrence
under the MD section
Business Interruption : 3 days of each occurrence
10 Details of Security Security guards are available round the clock at site –
arrangements around 47 nos.
Plant is surrounded by Brick Compound wall / barbed
Security posts are provided at gates and other strategic
Unauthorized entry is strictly restricted.
Watch towers and high mast towers provided at strategic
Plant is located on sea coast. There is also patrolling by
Marine Police / Coast Guard.
CCTV Cameras installed inside the plant for internal security
Stand Alone Terrorism Cover Proposal Form
A. INFORMATION ABOUT THE APPLICANT
1. Proposer Company Name: M/s. GSPC Pipavav Power Co. Ltd.
2. Do you wish to insure the
subsidiaries? Yes/No
3. If the answer to 2. Above is
Yes, name of the subsidiaries
4. Office Address: 2nd Floor, Besides Patni Computers (Igate),
(Address for Correspondence) FF Shed Nos. A/78/3-8,
GIDC Electronic Estate, Sector
Gandhinagar 382016, Gujarat India
5. Ownership of the Company Government
(e.g. public, private,
government, etc.)
6. Date of Commencement of 702.86 MW Gas based Combined Cycle Power Plant
Units Capacity Commissioning Date*
First Unit 351.43 MW 12th April
Second Unit 351.43 MW 5th February
Total 702.86 MW
7. Description of Applicant’s Gas based Combined Cycle Power Plant, Solar Plant and Gas
business operations: trading.
(Industrial, Commercial,
Residential etc.) Provide
details (Nature of business)
8. Is Business Interruption Yes
cover required?
9. Insured Values
Physical Assets and Business Interruption Information
Insured Location Property Damage Business Total Sum
Sum Insured Interruption Insured
Address Pin Value of Value of
Code Building Contents
including including
Site Gandhinagar
GSPC office, Office
Co. Ltd. 351.43 x 365541 INR INR INR 170 INR
2 total 149.82 3,537.13 Crores
702.86 Crores Crores Crores
702.86 MW Gas based Combined Cycle Power Plant
Units Capacity Commissioning Date*
First Unit 351.43 MW 12th April
Second Unit 351.43 MW 5th February
Total 702.86 MW
Power Plant Premises located at:
Village: Kovaya, Taluka: Rajula
District: Amreli -
State: Gujarat, India
Including property lying outside plant premises:
Seawater pipelines coming to plant from sea and effluent water pipelines going from plant into
sea and related foundation/anchoring structure.
Property Damage : INR 3,686.95 Crores
Business Interruption : INR 170.00 Crores
Total : INR 3,856.95 Crores
Property Damage : INR 25,00,000/-
10. Deductible each occurrence
Business Interruption : First 3 days
each ouccrrence
11. Period of Insurance 12.04.2026 to 11.04.2027
12. BI Indemnity Period (in months) 12 Months
13. Limit of Cover proposed (in INR Crores) INR 2,050 Crores
14. Limit of cover for War Risk Buy Back INR 250.00 Cr.
15. Security Management Please find attached Risk
Assessment Report conducted by
M/s. Unison Insurance Broking
Services Pvt. Ltd.
REQUEST FOR QUOTE – INDUSTRIAL ALL RISKS POLICY for 5MW Solar Project
Name of Insured : M/s. GSPC Pipavav Power Company Limited
Correspondence Address : 2nd Floor , Besides Patni Computers (iGATE),
FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar -
Occupation / Business : 5 MW Solar Power Plant
Location of Risk : Power Plant Premises located at:
5 MW Solar Power Plant in the Solar Park of Gujarat at
Village: Charnka, Taluka: Santalpur,
District: Patan, Gujarat, India
Period of Insurance : 12.04.2026 to 11.04.2027
Description of Property : 5 MW Solar Power Plant including but not limited to
to be insured - Buildings incl. plinth & foundation, compound walls / chain
link fencings, internal roads if any, any other structures &
civil works etc.
- Plant & Machinery incl. internal transmission line within the
plant premises, accessories, foundation, electrical
installations, furniture, fixtures, fittings, office Equipment
incl. Computer Systems, Peripherals etc
- Stocks of Stores, Spares & Consumables, all other stocks
pertaining to the insured’s trade, including Stocks held in
trust etc., whilst located anywhere in the plant premises
Material Damage Section : All Risks - INR 24,73,03,510 (Including Building & P&M)
Sum Insured Machinery Breakdown – INR
Basis of Sum Insured Reinstatement Value Basis
Add-on Covers to Material : 1. Earthquake (Fire & Shock) - TSI
Damage Section 2. STFI cover – TSI
3. Omission to Insure additions, alterations, extns. etc – 5% of
4. Escalation – 5% of BMA SI
5. Removal of Debris (in excess of 1% of claim amount) – INR
6. Fire Fighting expenses – At Actual e.e.l.
7. Loss Minimization expenses – INR 5 Crore.
8. Minor Works – INR 5 Crore
9. Expediting expenses – INR 5 Crore
10. Immediate repairs – INR 5 Crore
11. Property in Course of Construction/Erection – INR 5 Crore
12. Obsolete Spare Parts – INR 5 Crore
13. Temporary Removal of Property / Stocks Clause – INR
14. Deliberate Damage – INR 5 Crore
15. Architect Surveyors & Consulting Enggr.Fees – INR
16. Start up expense – INR 5 Crore
17. Nominated Loss Adjuster Clause:
M/s. Mehta & Padamsey Insurance Surveyors Pvt.Ltd.
M/s. Bhataweadekar & Company Insurance Surveyors
M/s. Proclaim Insurance Surveyors
FLOP & MLOP Section : Sum Insured: INR
Basis : Output basis
Indemnity Period : 12 months
Add-on Covers to FLOP 1. Customer extension to cover GETCO substation – 20% of
Section BI Sum Insured
2. Denial of Access – 20% of BI Sum Insured.
3. Supplier Extension Clause – 20% of BI Sum Insured
4. Public Utility Extension – 17% of BI Sum Insured
5. Claim Preparation Cost incl. Auditor Fees Clause
6. Additional Increased Cost of Working
7. Interdependency Cover
8. Departmental Clause
9. Accumulated Stock Clause
10. Sum insured adjustment clause
11. Alternative Basis Clause
12. Additional Increased Cost of Working
Terrorism Cover TSI : INR
Third Party Liability : INR 2 Crore
Clauses : Material Damage Section:
1. Earthquake (Fire & Shock) & STFI Cover
2. Reinstatement Value Clause
3. Agreed Bank Clause
4. Designation of Property
5. Local Authorities Clause
6. Removal of Debris (in excess of 1% of the claim amount)
7. Architects, Surveyors & Consulting Engineers Fees Clause
(in excess of 3% of the claim amount)
8. Omission to Insure additions, alterations or extensions etc.
9. 72 hours clause
10. Goods held in trust clause
11. On Account Payment clause
12. Automatic Reinstatement Clause
13. Loss Minimization Expenses clause
14. Fire Fighting Expenses clause
15. Minor works clause
16. Expediting Expenses clause
17. Immediate Repairs clause
18. Terrorism risk inclusion clause
1. Customer extension – 20% of BI Sum Insured
2. Supplier extension – 20% of BI Sum Insured
3. Public Utility extension – 17% of BI Sum Insured
4. Denial of Access – 20% of BI Sum Insured
Deductible / Time Excess : Policies having Sum Insured upto INR 100 Cr per location for PD &
Material Damage - 5% of claim amount subject to a min. of 5 Lacs
Business Interruption (FLOP)- 7 days of Standard Gross Profit
Claim Experience : 2025-26 – NIL
REQUEST FOR QUOTE – Standard Fire & Special Perils Policy / Laghu Udhyam
Insured Name M/s. GSPC Pipavav Power Co. Ltd.
Mailing Address 2nd Floor, Besides Patni Computers (iGATE),
FF Shed Nos.A/78/3-8, GIDC Electronic Estate.
Sector 25, Gandhinagar-382
1. Power Project premises including guesthouse at
Vill. Kovaya, Tal. Rajula, Dist. Amreli, Gujarat
2. H.O.–2nd Floor, FF Shed no.A/78/3-8, GIDC Estate, Gandhinagar.
Period of Insurance 12.04.2026 to 11.04.2027
Description of Property Non factory Buildings including plinth & foundation including Internal Roads,
Insured Boundary Walls, Site Office, RO Plant incl. Plant & Machinery, Guest house,
MS Gate, Hostel Building, Watch towers, Security cabins, Office Equipment,
Computers, Laptops and Furniture/Fixture/Fittings and any other items
pertaining to the Insured.
Particulars Sum Insured Rs.
Building incl Plinth & foundation, internal roads,
boundary walls, site office, Hostel Bldg, RO Plant
and all other civil structures pertaining to Insured
Sum Insured (Rs.)
Office Equpts incl computers and laptops, FFF etc.
(Gandhinagar & Site Office & Guest House)
Total Sum Insured
Basis of Sum Insured Reinstatement Value Basis
Cover required Standard Fire & Special Perils Policy including EQ, STFI & Terrorism
Clauses - Earthquake (Fire & Shock) Clause
- STFI cover inclusion
- Terrorism inclusion
- Reinstatement value clause
- Designation of Property clause
- Local authority clause
- Removal of debris clause (2% of claim amount)
- Architect, Surveyor and Consulting engineer’s Fees clause (5% of claim
- Held in trust clause
- Fire Fighting clause
- Agreed Bank Clause
Excess 5% of each & every claim subject to min. Rs. 10,000/-
CLAIM EXPERINCE 2025-26- NIL
REQUEST FOR QUOTE – Public Liability Insurance Act Policy
Sr. Particulars Description Sum Insured
1 Name of the M/s. GSPC Pipavav Power Company Limited
2 Correspondence 2nd Floor , Besides Patni Computers (iGATE),
Address FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
3 Manufacturing Manufacturing Premises
plants 351.43 MW X 2 = Total 702.86 MW Gas
based Combined Cycle Power Plants Village:
Kovaya, Taluka: Rajula, District: Amreli -
365541, State: Gujarat, India
5 MW Solar Power Plant Premises located at:
Village: Charnka, Taluka: Santalpur, District:
Patan, Gujarat, India
Power Generation - 351.43 MW X 2 = Total
4 Business 702.86 MW Gas based Combined Cycle Power
Plant and 5 MW Solar Power Plant. May also
engage in gas trading.
5 Locations of risks 1. Power Plant Premises located at:
Village: Kovaya, Taluka: Rajula
District: Amreli -
State: Gujarat, India
Including property lying outside plant
Premises such as Seawater pipelines
coming to plant from sea and effluent
pipelines going from plant into sea and
related foundation/anchoring structure.
2. 5 MW Solar Power Plant Premises
Village: Charnka, Taluka: Santalpur,
District: Patan, Gujarat, India.
2nd Floor , Besides Patni Computers
(iGATE), FF Shed Nos. A/78/3-8, GIDC
Electronic Estate, Sector
Gandhinagar-382016
6 Type of Policy Public Liability Insurance Act Policy
7 Paid up Capital of Rs. 86,184.05 lakhs
8 Estimated turnover
during 12 months Rs. 485 Cr
9 Limits of Indemnity Any One Accident - being Max. as per PLI Act Rs. 250.00 Crs.
Any One Year being Maximum per PLI Act Rs.500.00 Crs.
10 Risk to be covered As per Public Liability Insurance Act,
11 Policy Period 12.04.2026 to 11.04.2027
REQUEST FOR QUOTE – COMMERCIAL GENERAL LIABILITY Policy
NAME OF INSURED: M/s. GSPC Pipavav Power Company Limited
2nd Floor , Besides Patni Computers (iGATE),
ADDRESS: FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
POLICY PERIOD: 12.04.2026 to 11.04.2027
POLICY FORM Claims Made Basis
RETROACTIVE DATE: 1.4.2013
NATURE OF BUSINESS: Power Generation & gas trading.
Estimated Turnover for next
Coverage A Bodily injury (fatal/non-fatal), disease and
damage to property of third parties due to
various business exposures such as those
arising from Premises, Products and
Complete Operations.
All costs, fees and expenses incurred in the
defence and settlement of any claim against
the Insured, legal liability for damages to
the third parties in respect of accidental
COVER REQUIRED: death, bodily injury or disease or loss or
damage to property arising from the
Insured’s performance of activities in the
course of business applicable to claims first
made against the Insured during the policy
Coverage C Medical Payments
Coverage D Fire Damage
LIMIT OF LIABILITY: INR 50,00,00,000 Crore Each Claim and in Aggregate
TERRITORY/ JURISDICTION: Worldwide including USA/Canada
CLAIMS INFORMATION: NIL Claim
As per terms and conditions, extensions and exclusions of
the standard Commercial General Liability Policy Form
including but not limited to the following Extensions/
EXTENSIONS / CLAUSE: Endorsements:
Defense cost to be included within the limit of
Premises & Products/Completed Operations
Power Generation
Power Plant site at Village: Kovaya, Taluka:
Rajula, District: Amreli - 365541, State: Gujarat.
5 MW Solar Power Plant Premises located at:
Village: Charnka, Taluka: Santalpur,
District: Patan, Gujarat.
Gandhinagar Office at 2nd Floor, FF Shed
no.A/78/3-8, GIDC Estate, Gandhinagar
Fire Damage Extension Clause
Medical Payments Extension Clause
Terrorism Legal Liability (India Only): Full Limits
Property under Care, Custody and Control Cover
Travelling Business Executives Worldwide Cover
Non Owned and Hired Automobile Liability Cover
(Worldwide Cover)
72 Hours Sudden and Accidental Pollution Cover:
Vendor Extension on an unnamed Basis
Technical Collaboration Cover
Incidental Medical Malpractices Cover
Cross Liability
Coverage for Alterations, fit outs and minor civil
work by the insured within the Insured premises.
Policy covers Insured’s participation in the
Events/Exhibitions
Personal and Advertising Injury
Transportation liability Cover
Vicarious Liability for injuries to leased/ sub
contracted workers/ employees
Additional Insured; where required by a written
Waiver of Subrogation; where required by written
Definition of BI – to include mental anguish, shock
or emotional distress
Newly Acquired Entity to be covered - 180 days
Contractors and sub-contractors extension
Mitigation Expenses
Tenant’s Legal liability
Valet parking
Claim Series Clause
Extended Reporting period – Free for 90 days
Non Cancellation Clause – The policy should be
non-cancellable except in case of non-payment of
Effluent discharge for 15 kms from the plant
Policy to be primary & Non Contributory
UNDWERITING INFORMATION: Proposal form
Commercial General Liability Application for Insurance
This proposal for insurance will be the basis of any subsequent insurance policy
that we issue to you. It is essential that you answer fully and accurately all of the
questions contained in this proposal, and that you provide us with any and all
additional information relevant to the risk to be insured or our decision as to the
acceptance of the risk or the terms upon which it should be accepted. Your failure
to comply with this obligation now may result in the rejection of your claim and the
avoidance of your policy when a claim is made. If you are in any doubt about the
information to be given, please seek the advice and guidance of your insurance
advisor or agent. Liability of the company does not commence until the proposal
has been accepted and the premium has been received in accordance with the
provisions of section 64VB of the insurance act,
1. Proposers desiring only Public Liability coverage are not required to fill
2. Proposers desiring only Product Liability coverage are not required to
fill Section III.
3. Proposers not desiring extensions under Section V and VI are not
required to fill those Sections.
4. Some sections of the application will not apply to you. Please mark Not
Applicable (N/A) where this is the case.
5. Please attach a separate sheet if space indicated in the proposal from is
Name of the Intermediary:
Section I: General Information
1. Name & Registered Address of the Insured (including names of all subsidiaries or
affiliated companies to be insured): GSPC Pipavav Power Co. Ltd.
FF Shed Nos.A/78/3-8,GIDC Electronic Estate,
Nr. Patni Computers (iGATE), Sector
Gandhinagar 382016, Gujarat India
2. Website Address: www.gspcgroup.com
3. Please describe your business operations and activities: Generation of
Electricity/power from Natural gas / Solar power and may engage in Power & gas
4. Length of time in business: Since 15.6.2006
5. Does Insured have a subsidiary, affiliate or representative in the USA? If yes, please
provide Name and Addresses of such affiliation: No
6. Name and Registered Address of Additional Insured, if any: Nil
Section II: Insurance Requirement
1. Form: [ √] Claims Made [ ] Occurrence Based
2. Limits of Insurance (Amount in Indian Rupees):
Limit of Liability Any One In the
Event Aggregate
General Aggregate Premises and Operations INR INR
Transportation Liability
Products/Completed Operations Limit
Employers Liability
Automobiles Liability (Non Owned/Hired) Extension
3. Policy Period: 12.04.2026 to 11.04.2027
4. Retrodate (only for Claims Made Form): 1.4.2013
5. Territory: [√ ] India [ ] Worldwide excluding USA and Canada [ ] Worldwide including
6. Jurisdiction: [ ] India [ ] Worldwide excluding USA and Canada [√ ] Worldwide
including USA and Canada
Section III: General Liability
A. Premises and Operations:
1. Please give full description of activities for which cover is required: Power Plants at
Kovaya-Amreli District, Solar Power Plant at Charnka, Pathan District and Office
premises at Gandhinagar.
2. List all premises to be insured in India and overseas:
Location Manufacturing Units Warehouses/Godowns/Shops/De
pots/Tank Farms/Offices
No. of Nature of Risk No. of Nature of Risk
locations locations
India 1 Power Plants 1 Office
3. Please quantify annual sales turnover of last three years (Amount in Indian Rupees):
Year Premises Transportation*
Projected (26-27) 485 Cr.
Current (25-26) 225 Cr.
Last Year (24-25) 720 Cr
*Pls provide the particulars and mode of transportation of such materials:
4. Please describe in brief surrounding areas and third party property within an
approximate radius of 2 kms from each manufacturing unit: As per Risk inspection
Manufacturing Industrial Agricultural Residential Others
Unit Area Area Area
6. Please attach Lay-Out Plans and Risk Inspection Report of the manufacturing units
proposed for Insurance: As per Risk inspection report
7. Do you handle or use gases, pressure-storage, explosive, hazardous substances,
asbestos, toxic, radioactive materials and hydrocarbons? If so, please give details of
their quantity, storage, handling and precautions taken: As per risk inspection report
8. Is there a programme for the prevention of fire, explosion incidents? If so, pls indicate:
(a). Type of detection and alarm system: As per risk inspection report
(b). Availability of service organisation in case of such incidents (fire brigade, specialists
in environmental protection and toxicology): As per risk inspection report
(c). Provisions made for supply of energy, water etc. in an emergency: As per risk
inspection report
9. Will you, or your employees, handle or come into contact with any industrial dust of know
harmful nature (e.g. asbestos, silica, cotton), radioactive materials, or any other
substance harmful to health? Nil
10. Extensions required:
(a). Act of God Perils Extension (viz., Earthquake, Storm, Typhoon, Flood and
Inundation etc.): Yes
(b). 72 Hrs Sudden and Accidental Pollution Extension: Yes
(c). Effluent Discharge Extension: Yes
(i). If yes, what is the length of pipeline from the compound wall of your premises
to the disposal point? As per risk inspection report
B. Travel of Executives:
1. Number of Employees that Travel Overseas Annually: nil
2. Number of travel days per year: nil
3. Purpose of trips: nil
4. Overseas Travel Destinations: nil
C. Advertising Information:
1. What percentage of your annual sales is derived directly from your web site?
2. Do you use comparative advertising in your advertisements? If "Yes", was an
independent organization consulted on how such comparisons were made?
3. Is music used in your advertisements? If "Yes", were all the rights secured prior to
4. Is the likeness of famous people used in your advertisements?
5. Have you ever been sued, or have you sued another, for copyright or trademark
6. Besides the information related to your goods, products or services, do you produce
any other publications for external use?
Section IV: Product Liability
Please attach a product brochure or literature or labels or warnings etc. with this form
A. Products / Completed Operations:
1. Please provide a specific description of products manufactured or supplied:
Electricity/Power
2. Please furnish details of products to be considered for insurance:
Products Principal Annual Units End Usage/ Expected Life of
Components Produced Intended Customer the Product
3. Please quantify annual sales turnover of last three years (Amount in Indian Rupees):
Year USA/Canada/Australia UK/Europe Rest of the India
Projected 485 Cr.
Current 225 Cr.
Last Year 720 Cr
4. Do you provide any services or treatment other than sale of products? If yes, pls
describe the nature of services and estimated annual turnover: Nil
5. Please furnish particulars of new products to be marketed during the next 12 months:
6. How long have you been exporting to these countries? N.A.
(a). USA and Canada:
(b). UK/Europe:
(c). Rest of the World:
7. Do you manufacture the complete product? If not, what components/parts are
purchased by you?
8. Do you have Research & Development department or Technical Know-
how/Collaboration?
9. Do you retain rights of recovery against manufacturers?
10. Please specify any products, which are inflammable/explosive, dangerous, radioactive,
and harmful to health, poisonous by themselves or any combination with others. If so,
please give full details and state what precautions are taken.
11. Please furnish details and list of products discontinued or recalled or withdrawn during
the last five years.
12. Have your products ever been subject to any enquiry or investigation by any
Government agency, concerning the efficiency/adequacy or labelling, hazardous
contents or safety? If so, please give full details.
13. Are any products manufactured and sold under someone else’s label or trademark? If
yes, please give full details.
14. Does the Insured’s contract of sale agree to hold distributors harmless?
15. Does the Insured require the name of vendor to be included as a Named Insured? If
yes, pls provide the name, address and list of products to be supplied to the vendor:
16. Does the vendor undertake final preparation of product?
B. Quality Control:
1. Give details of checks or examinations or controls including batch control and testing
carried out or effected to discover possible defects or errors in products. Pl answer
2. Do your products comply with standards like ISI or any other Standards? Pl answer
Section V: Employee details
1. Please provide projected details for the next 12 months: N.A.
Description of USA/Canada/ UK/Europe Rest of the India
Employees* Australia World
No. Wage roll No. Wage No. Wage roll No. Wage roll
Supervisory/Manua
All other employees
* Fees of working directors not to be included.
** Please specify any extra hazardous activities.
Section VI: Non-Owned and Hired Automobile Liability
1. Please provide projected details for the next 12 months: Nil
Country Estimated No. of Type Of Frequenc Duration of a
Automobiles Vehicle y of Hire Single Hire
USA/Canada/Australia
Rest of the World
Section VII: Loss Information
1. Please enter all claims or losses (regardless of fault and whether or not insured) or any
occurrences or incidents, conditions, defects, circumstances or suspected defects,
which may give rise to a claim; over the last five years under Public Liability and/or
Products Liability (Amount in Indian Rupees): NIL
Date of Description of Claim Date of Amoun Amoun Claim Status
Occurrenc Claim t Paid t
Section VII: Prior Insurance
1. Please provide details of expiring policy:
Type Insurer Limit of Premium* Deductible
NEW INDIA 250 Cr. : 500 50,75,000/- nil
Public Liability Act Cr.
Commercial NEW INDIA 50 Cr. 25,000 nil
General Liability
Product Liability Nil Nil
*Premium excluding taxes and ERF contribution.
Section VIII: Other Information (Compulsory)
1. PAN CARD Number (10 Digit Number) AACCG6179R
2. Sources of funds : Business
Salary √ Business Investments
Other (Please Specify)
Declaration (in respect of all sections)
I / We do hereby solemnly declare and state that all information given above is true
to my / our knowledge. In case such information is found at any time in future to be
false or misleading or it is found by the insurer that I / We have not disclosed any
fact which is material to the assessment of the risk, the insurance cover granted to
me / us shall be deemed to be null and void and I / We shall not be entitled to any
benefit hereunder.
I/we herby confirm that all premiums have been/will be paid from bonafide sources and no
premiums have been/will be paid out of proceeds of crime related to any of the offence
listed in Prevention of Money Laundering Act,
I understand that the Company has the right to call for documents to establish sources of
The insurance company has right to cancel the insurance contract in case I am/ have been
found guilty by any competent court of law under any of the statutes, directly or indirectly
governing the prevention of money laundering in India.
Authorised Signatory Company Stamp
Position in Your Company:
Date: / /2024 Place: Gandhinagar
REQUEST FOR QUOTE – Marine Open Policy for Inland Transit
Name of Insured M/s. GSPC Pipavav Power Co. Ltd.
ADDRESS FF shed nos. A/78/3-8, GIDC electronic estate,
Besides Patni computers (iGATE), Sector
TYPE OF POLICY Marine Open Policy
POLICY PERIOD 12.04.2026 to 11.04.2027
DESCRIPTION OF THE RISK All type of Goods including second hand/used machineries
going for repairs/calibration and coming back to GPPC
also spares and other store items.
TYPE OF RISK All Risk including SRCC with Loading & Unloading Cover
& warehouse to warehouse basis (Including
New/Secondhand / Used)
TRANSIT DETAILS Anywhere in India to Anywhere in India
MODE OF TRANSIT Air/Rail/Road/Multi Modal / Courier / Post
PACKING Customary Packing
BASIS OF VALUATION CIF + 10%
LIMIT PER TRANSIT Rs. 2.00 Crores
LIMIT PER LOCATION Rs. 2.00 Crores
EXPECTED TURNOVER Rs. 2.00 Crores
CLAUSE ATTACHED i) All Risk cover including SRCC with Loading & Unloading
ii) Inland Transit Clause – A
iii) SRCC clause
iv) Warehouse to warehouse basis
v) Seal intact clause
vi) Duty Insurance Clause
Special Coverage At the time of claim during transit of second hand/used
material / equipment, Insurer must accept the internal
inspection report of Insured for settlement of claim.
EXCESS 0.5% of each & every consignment value Subject to min.
CLAIM EXPERIENCE 2023-24: Nil
REQUEST FOR QUOTE – Marine Open Policy for Import / Export
Name of Insured M/s. GSPC Pipavav Power Co. Ltd.
ADDRESS FF shed nos. A/78/3-8, GIDC electronic estate,
Besides Patni computers (iGATE), Sector
TYPE OF POLICY Marine Open Policy (CARGO) IMPORT / EXPORT
POLICY PERIOD 12.04.2026 to 11.04.2027
DESCRIPTION OF THE RISK All type of Goods including second hand/used machineries
going for repairs/calibration and coming back to GPPC
also spares and other store items.
TYPE OF RISK All risks including clauses ICC A / ICC Air / War & SRCC,
ITC-A & inland SRCC for tail end risks / inland transits,
including risk of terrorism, Duty insurance clause, risk of
loading / unloading& warehouse to warehouse basis
(Including New/Secondhand / Used)
TRANSIT DETAILS Anywhere in world to anywhere in world
MODE OF TRANSIT Air/Rail/Sea/Road/Multi Modal / Courier / Post
PACKING Customary Packing
BASIS OF VALUATION CIF + 10%
LIMIT PER TRANSIT Rs. 2.00 Crores
LIMIT PER LOCATION Rs. 2.00 Crores
EXPECTED TURNOVER Rs. 2.00 Crores
CLAUSE ATTACHED i) All Risk cover including SRCC with Loading & Unloading
ii) Inland Transit Clause – A
iii) SRCC clause
iv) Warehouse to warehouse basis
v) Seal intact clause
vi) Duty Insurance Clause
Special Coverage At the time of claim during transit of second hand/used
material / equipment, Insurer must accept the internal
inspection report of Insured for settlement of claim.
EXCESS 0.5% of each & every consignment value Subject to min.
CLAIM EXPERIENCE 2023-24: Nil
REQUEST FOR QUOTE – Money Insurance (In Transit & in Safe)
Sr. Particulars Descriptions Sum Insured
1 Name of the Insured M/s. GSPC Pipavav Power Company Limited
2 Correspondence Address 2nd Floor , Besides Patni Computers (iGATE),
FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
3 Location of Risks 1. Power Plant site at Village: Kovaya,
Taluka: Rajula, District: Amreli -
State: Gujarat.
2. 5 MW Solar Power Plant Premises
Village: Charnka, Taluka: Santalpur,
District: Patan, Gujarat.
3. Gandhinagar Office at 2nd Floor, FF
Shed no.A/78/3-8, GIDC Estate,
4 Occupation Power Plant / Solar Plant / Office premises
5 Type of Policy required Money Insurance (Money in Transit plus Cash in
6 Description of Risk Company cash being carried by employees whilst
in transit all over India including Burglary, Theft
(with or without forceible entry), Housebreaking,
Hold Up Robbery, Decoity, Larceny, Riot, Stike,
Malicious Damage, Fidelity Guarantee &
7 Policy Period 12.04.2026 to 11.04.2027
8 Risk to be covered (A) (i) Money (Cash / Bearer Cheques) in transit Rs.
between Insured’s Office to any Bank / Place
of business for Transaction and vice -versa
within radius of 200 KMs from Insured's
Offices specified above being carried by
employees/contract employees.
(ii) Cash in Custody of Insured's authorized
officers/Employees whilst the Employees are Sub-Limit
on Official tours outside office anywhere in Rs.1.0 Lacs.
India subject to sub-limit of Rs.1 Lacs, this
would also includes cash drawn by
employees/contract employees as advance.
(B) Cash / Bearer Cheques kept in 'Safe' / Locked Rs.
Cupboards/ Counters at the Insured's
premises shown above.
Risk to be covered:
Cash in transit: All risk including riot, strike
and risk of infidelity of authorized cash
carrying person (employees/contract
employees). Terrorism should be in built
Cash in Safe/counters/cup board: Risk of
housebreaking, burglary, robbery, dacoit,
hold up and extension of theft up to 25% of
9 Mode of Transit / carrying By own vehicle / hired vehicle / public transport
In Transit (a) Limit per single carrying
(b) Annual Estimated Transits
Total Estimated Dispatches in Policy Year
Cash in Safe / Counters
11 Policy Subject to (a) Sum Insured for Money in Transit is
Adjustment being declared on fair estimate
(b) Sum Insured (for Transit) will be adjusted
both upward or downward at the end of
12 Claim Experience 2023-24: Nil
Request for Quote - Electronic Equipments Policy
Insured Name M/s. GSPC Pipavav Power Co. Ltd.
2nd Floor, Besides Patni Computers (iGATE),
Mailing Address FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
Risk Location 1. Power Plant site at Village: Kovaya, Taluka: Rajula, District:
Amreli - 365541, State: Gujarat.
2. 5 MW Solar Power Plant Premises located at:
Village: Charnka, Taluka: Santalpur,
District: Patan, Gujarat.
3. Gandhinagar Office at 2nd Floor, FF Shed no.A/78/3-8, GIDC
Estate, Gandhinagar
Type of Policy Electronic Equipments Insurance Policy
(As per attached list of equipments)
Policy Period 12.04.2026 to 11.04.2027
Coverage required Sum Insured (Rs.)
All risks including but not limited to
any accidental damages,
burglary/theft/house-breaking,
electrical/mechanical/ electronic
breakdown, short circuit & voltage Gandhinagar HO : 10,40,771/-
Risks to be covered fluctuations, loss or damage during Site & Guest house: 13,50,562/-
transit, risk of fire and allied perils, Total : 23,91,333/-
RSMD, natural calamities like STFI
& earthquake, human error, falling
object & entry of foreign bodies etc.
Basis of Sum Insured Replacement Value basis
Basis of Indemnity On RIV Basis (No deduction for depreciation in case of total loss claims)
Excess As per Tariff
Claim History 2024-25: Nil
LIST OF ELECTRONIC EQUIPMENTS
Sr.No Location Item Name Sum
1 Site Office Printer Canon IBP 2900-C&I
2 Gandhinagar Office Lonovo Desktop-Chintan
3 Gandhinagar Office Lonovo Desktop-Preeti
4 Gandhinagar Office Lonovo Desktop-Manit
5 Gandhinagar Office Lonovo Desktop-Ketan
6 Gandhinagar Office Lonovo Desktop-Rajat
7 Gandhinagar Office Lonovo Desktop-Kuldeep
8 Gandhinagar Office Lonovo Desktop-Suraj
9 Gandhinagar Office Lonovo Desktop-Jayesh
10 Gandhinagar Office Lonovo Desktop-Kaku
11 Gandhinagar Office Lenove Desktop-Mehul
12 Gandhinagar Office Lenove Desktop-K Prakash
13 Gandhinagar Office Lenove Desktop-Santosh Joshi
14 Gandhinagar Office Lenove Desktop-Ojas Shah
15 Site Office Lenove Desktop-Yogesh
16 Site Office Lenove Desktop-Kaushal
17 Site Office Lenove Desktop-Darshan
18 Site Office Lenove Desktop-Gautam
19 Site Office Lenove Desktop-Punching
20 Site Office Lenove Desktop-Sanjay Makwana
21 Site Office Lenove Desktop-Jagdish
Thakar(SPG00YW2F)
22 Site Office Lenove Desktop-
Naresh(SPG00YW2Q)
23 Site Office Lenove Desktop-
Parthiv(SPG00YW2M)
24 Site Office Lenove Desktop-
Auditor(SPG00YR5B)
25 Site Office Lenove Desktop-
Nainesh(SPG00WY2B)
26 Site Office Lenove Desktop-Ranjit
27 Site Office Lenove Desktop-CEO cabin Site
28 Site Office Lenove Desktop-Hemant Vaishanv
29 Site Office Lenove Desktop-Lokendra
30 Site Office Lenove Desktop-Girish
31 Site Office Lenovo Desktop Model V520-Mr. M.
32 Site Office EPSON L565 Printer-CEO cabin
33 Site Office HP Laser jet M128MFP FW-Gautam
34 Site Office HP Laser printer 1020 plus at main
35 Gandhinagar Office SITC of Hikvision NVR 16CH for
36 Gandhinagar Office SITC of Seagate Hard Disk 6TB for
37 Gandhinagar Office HP color Laserjet Printer M254DW-K
38 Gandhinagar Office DELL OPTIPLEX 5070 MT
39 Gandhinagar Office HP Color Laser Jet Pro M183FW
Printer-Rajat S
40 GPPC's Direcotr- HP laserjet Pro MFP Printer-
Secretary M226DW
(Expenditure),FD,GoG
41 Site Office D-Link make switches for network
connectivity within plant and
42 Gandhinagar Office AIO Lenovo A340 Deskotp-FD GoG
office GPPC's Director-FD,GoG off
43 Gandhinagar Office HP ENVY 14-FC0078TU Windiws
11-COMMON LPATOP
44 Gandhinagar Office HP MS Windows 11 Pro OEM
45 Site Office APC Easy UPS Online UPS#6.0
Request for Quote - All Risks Cover for Portable Electronic Equipments
Insured Name M/s. GSPC Pipavav Power Co. Ltd.
2nd Floor, Besides Patni Computers (iGATE),
Mailing Address FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
Risk Location 1. Power Plant site at Village: Kovaya, Taluka: Rajula, District:
Amreli - 365541, State: Gujarat.
2. 5 MW Solar Power Plant Premises located at:
Village: Charnka, Taluka: Santalpur,
District: Patan, Gujarat.
3. Gandhinagar Office at 2nd Floor, FF Shed no.A/78/3-8, GIDC
Estate, Gandhinagar
Type of Policy All Risk Cover for Portable Electronic Equipments
(As per attached list of equipments)
Policy Period 12.04.2026 to 11.04.2027
Name of the Policy Coverage required Insured
All Risks incl. Fire & allied perils, AOG perils incl.
STFI, Earthquake, RSMD, Burglary, Theft, Larceny,
Robbery, Housebreaking, Accidental damage, Electrical &
Mechanical breakdown, Terrorism damage etc
Geographical Coverage : Worldwide
Basis of SI Replacement Value basis
Basis of Indemnity On RIV Basis (No deduction for depreciation in case of total loss claims)
Excess Rs.2500 per claim
Details of equipments for All risk cover with worldwide coverage
No. Sum Insured
1 Dell 3490 Laptop OYLS Shailesh Darji
2 HP 348G5 Laptop- Parthiv OYLS
3 HP 348G5 Laptop- Hemant OYLS
4 NARESH UKANI-OYLS-DELL 3501 LAPTOP
5 GAUTAM-OYLS-HP PAVILIAN X360 LAPTOP
6 LENOVO V15-G2/ITL-I5:COMMON LAPTOP
7 Mehul Vanzar-OYLS-Lenovo Ideapad
8 Meeraj Yadav-OYLS-Dell Vastro 3520 Laptop
9 Ketan Parekh-OYLS-HP ProBook 440 G8 I7-1165G7
10 Suraj Prasad-OYLS-HP Pavilion Laptop 14
11 Kaku Prasad-OYLS-HP Pavilion Laptop 14
12 Naresh Ukani-OYLS-HP Laptop 14-EK0183TU
13 Guatam Trivedi-OYLS-HP Laptop 14-EK0183TU
14 PREETI BHATT:HP Pavilion 15s Windiws 11 pro
15 Ranjit Dhadhal-OYLS-HP Laptop 15-FA1064TX
Nainesh Pawar-OYLS-Asus Notebook FX707ZC4-
17 Jayesh Rathod:OYLS:HP Pavilion 15-eh1147AU Laptop
18 Darshan Desai:OYLS:Dell Notebook 7430
19 Kaushal Shastri-OYLS-HP Laptop Victus Gaming 15-FA
20 OYLS-SANJAY MAKWANA:HP MODEL-15 FD0112TU
21 OYLS-GIRISH TARSARIA:HP MODEL-15 FD0112TU
22 Chintan Vyas-OYLS-HP Elitebook 645 G9
23 LOKENDRA JADEJA-OYLS-DELL INSPIRON 5640
24 Kuldeep Jain-OYLS-HP Elitebook 645 G9
25 Rajat Bakshi-OYLS-HP Elitebook 645 G9
26 Parthiv Oza-OYLS-HP Probook 450G10
27 Hemant Vaishnav-OYLS-HP Probook 450G10
28 IPAD PRO 11 WF CL 512BG SBLK-HIN
Total Sum Insured
Enquiry slip for D & O Liability Policy
Name of Insured M/s. GSPC Pipavav Power Co. Ltd.
Registered Address 2nd Floor, Besides Patni Computers (iGATE),
FF Shed Nos. A/78/3-8, GIDC Electronic Estate, Sector
SECTION-A: D&O Individual Liability
Risk to be Covered SECTION-B: Company Reimbursement
SECTION-C: Entity Security & Entity EPLI
Policy Period 12.04.2025 to 11.04.2026
Indemnity Limit INR 10,00,00,000 Any one occurrence & in aggregate
Rectroactive Date 01/07/2010
SECTION - A : NIL
Retention SECTION - B : INR 1,00,000/-
SECTION - C : Entity Security :- INR 1,00,000/-
Entity EPLI :- INR 1,00,000/-
Territory India
Jurisdiction Worldwide including USA/Canada
Cover / Add on cover as under :
Entity EPLI Cover
Entity Security Cover
Advancement of Defense Costs
Outside Entity Directors & Officer Liability cover
Interpretive Counsel costs
Self Reporting Expense Coverage
No Insolvency Bankruptcy exclusion
Prospectus Exclusion amended to allow cover for private placement
Pre-Investigation Costs
No Money Laundering Exclusion
Major Shareholders Exclusion
Bilateral Extended Reporting Period
Retired Directors (discovery period) – Lifetime Run-off
Dedicated additional limit of liability for non-executive directors
Emergency Defense Costs
Spouses, Heirs & Representatives cover
Extradition Cost
Assets and liberty costs including prosecution cost, bail bond expenses and – Full Limit
Auto addition of newly acquired subsidiaries-25% threshold
Civil fines & penalties insurable by law
Legal Representation cost
Public Relations expenses
Occupational Health & Safety Defense cost
Tax liability cover
Kidnap Response Cost
Regulatory crisis response cost
Bodily Injury / Property Damage exclusion with carve back
Cover for Insured vs. Insured claim
PI exclusion with carve back for failure to supervise
Non cancellation of policy except nonpayment of premium
Severability Clause
Pollution defense costs and shareholders’ derivative claims covered
Disruption compensation expenses
Cover for Exemplary and Punitive Damages
Policy to be Non-Rescindable
Crisis communication cost
Counselling cost
Control group clause
Policy non-cancellable expect for non-payment of premium
Corporate Manslaughter Cover
Separate Limits for Non-Executive Directors over and above limit of liability
Psychological Support Expenses
Cover for Employed Lawyers
Note : 1. Completed proposal form attached.
2. Please note that all insurers are required to confirm that the product is filed with
IRDA. Please also attach policy wording along with your technical bid.
Important Note : The quote for D & O policy must be accompanied by wording of the
policy and all extension endorsements. Quotes without appropriate wording shall be
liable for rejection.
DIRECTORS & OFFICERS LIABILITY AND COMPANY
REIMBURSEMENT INSURANCE
This is a Proposal Form for a Policy relating only to claims made against the insured
party during the currency of the said Policy.
NB : The Company’s last two Annual Reports together with any subsequent
interim Report should be submitted with this Proposal Form.
Please answer all questions fully (if there is insufficient space use a separate sheet).
Please write clearly and tick boxes as necessary.
1. a. Name of Parent Company : GSPC Pipavav Power Co.Ltd.
b. Address of Head Office
2nd Floor, Besides Patni Computers (Igate),
FF Shed Nos. A/78/3-8, GIDC Electronic Estate, Sector
Gandhinagar 382016, Gujarat India
c. Name of Insured :GSPC Pipavav Power Co.Ltd.
2. Please state for how long has the Company
continuously carried on Business: Since the date of receipt of certificate of
commencement of business i.e.15.06.2006.
3. Nature of Business : Power Generation & may engate in power & gas trading.
4. During the past five years has :
a. The name of the Parent Company been changed ? No.
b. Any acquisition or merger taken place ? No.
c. Any rights issue taken place ? No.
If ‘Yes’,please give full details :
5. Has the Company publicly revealed that it has under
consideration at the present time any acquisition,
merger or tender offer ? No.
If Yes, please give full details :
6. a. Total number of shares issued: 861840563 Equity shares of Rs.10/- each
b. Total number of shareholders
c. Total number of shares owned by Directors
and Officers (both direct and beneficial)
d. Details of any shareholding in the Company greater than 5%
Shareholding of GPPC as on 30th November
No. Name of the Share Holders Holding
7. Market Capitalization :Not applicable.
8. a. Total assets in North America Nil
b. Please list those Subsidiaries in North America that are not wholly
owned, together with the Company’s percentage interest in each
c. Who owns the minority stock N.A.
d. Does the Company or any of its Subsidiaries have :
(i) any stock, share and debentures traded in
North America ?
If Yes, on what date the was the last offer made ? ________
Was the offer subject to the United States
Securities Act of 1933 and / or The Securities
Exchange Act of 1934 or any amendments ?
(ii) any debt or equity instruments or commercial
paper in North America ?
If Yes, what was the most recent effective date ? _______
9. If Directors & Officers Liability Insurance has been carried during the past
three years, please state : Yes
a. Insurer:. The New India Assurance Company Limited.
b. Expiry date of Policy : 11/04/2025
c. Indemnity Limit : 10 Cr.
10. Has any previous Policy for Directors & Officers Liability
Insurance and Reimbursement for Directors & Officers Liability
Insurance been cancelled or refused by any Insurer ? No.
If Yes, please give full details:
11. If an insurance similar to that now proposed had
been or were now in effect, would any claim which
has been made, or which is now pending, against
any persons proposed for insurance have fallen
within the scope of such insurance ? No
If Yes, please give full details:
12. Is any person proposed for insurance cognizant of any wrongful
act which he has reason to suppose might afford valid grounds
for any future claim such as would fall within the scope of the
Proposed insurance ? No.
If Yes, please give full details :
13. Amount of Indemnity required : Rs 10 Cr.
14. Coverage required Worldwide including USA & Canada
15. Any Overseas Subsidiaries : NOT APPLICABLE
16. Is the Company listed or proposed to be listed on any of the
Stock Exchanges Indian or Foreign? If so, which NOT APPLICABLE/NOT
17. Do you require Employment Practices cover under this policy? Yes
If ‘Yes’ please complete questions 17(a)-(g). These questions form part of the proposal
Employment Practices Liability
Questions 17(a)-(g) are only to be completed if cover is required in respect of
Employment Practices Liability.
17(a). Does the proposer have a Human Resource Department? Yes
If ‘Yes’, how may employees are there in this Department?
If ‘No’, how is the function handled?
17(b). How many officers and other employees have resigned, been terminated (with or
without cause) or have taken early retirement within the last 24 months?
Resigned Termination Normal Early Retirement
NIL NIL NIL NIL
17(c). (i) Does the proposer have a written Human Resources
Manual or equivalent written management guidelines? YES
(ii) Please tick box if the guidelines indicate a policy on procedure with
respect to the following events .
Written application for employment [ √ ] Medical examinations [ √ ]
Legally prohibited discrimination [ √ ] Sexual harassment [√]
Compliance with statutes [√] Employee disciplinary actions
Redundancies, termination of Employee out-placement services [ √ ]
employment and early retirement [ √ ]
Employee appraisals/ reviews [ √ ]
(iii) Please tick relevant box(es) if decisions regarding these events are
always subject to prior review by the proposer’s Human Resources
Department, Legal Department, or outside Legal Adviser.
Individual decisions are always reviewed by:
Resources Legal Legal
1. Written application for employment [√]
2. Medical examinations [√]
3. Legally prohibited discrimination [√]
4. Sexual harassment [√]
5. Compliance with statutes
6. Employee disciplinary actions [√]
7. Redundancies, termination of
employment and early retirement [ √ ]
8. Employee out-placement services [√]
9. Employee appraisals/ reviews [√]
(iv) Does the proposer have an employee handbook which is
distributed to all employees? Yes
if ‘Yes’, please attach such handbook to the proposal. YES
17(d). Is the proposer currently undergoing, or does the proposer
contemplate undergoing during the next 12 months, any
form or any type of company restructuring or closure of office,
plant or store ?
If ‘Yes’, please attach full details. Yes
17(e). Please provide on a separate attachment full details of all wrongful
termination, discrimination and sexual harassment claims made
against the proposer or any of its directors, officers or employees
during the last five years including amounts of any judgments
or settlements and costs of defence.
If no such claims, please tick None
17(f). Please provide on a separate attachment full details of all
inquiries, investigation, grievance fillings or other
administrative hearings previously filed with or currently
before any local or government agency governing
employer responsibility to employees.
If no such cases, please tick None
17(g). Are there now or have there been any employment practices
claim(s) against the proposer or any of its subsidiaries? Yes
If ‘Yes’, please give full details.
The undersigned authorised Officer of the Company declares that to the best of his / her
knowledge and belief the statements set forth herein are true. Although the signing of this
Proposal Form does not bind the undersigned, on behalf of the Company, to effect
Insurance, the Undersigned, on behalf of the Company, agrees that this Form and the
said statements shall be the basis of the Contract should a Policy be issued and this Form
will be attached to and become part of the policy.
NB Should the above signed determine that further enquiry of the persons to be
insured may be necessary in order to provide reasonably reliable answers to
questions 11 and / or 12, he may submit to the Insurers supplementary advices
conveying any pertinent information or changes so derived and the Insurers may
thereupon alter any indications previously given accordingly.
In the absence of subsequent advises to the Insurers to the contrary it will be
assumed by the Insurers that there is no additional pertinent information or
ADDITIONAL INFORMATION REQUIRED
1. List of Subsidiary Companies with their country of incorporation, turnovers,
shareholding patterns and brief write-up on activities. – Not applicable
2. Brief write-up on the Group's overall Business and expansion plans – Annual
Report Attached
3. Initial Public Offer details (size, no. of shares etc.) , if going for any listings.- Not
4. Annual Reports and Accounts - last 2 years
5. The last Interim Statement (if applicable). N.A.
Request for quote - Workmen Compensation Policy
Name Of Insured M/s. GSPC Pipavav Power Co. Ltd.
Power Project at Pipavav,
Site Address Vill. Kovaya, Tal. Rajula,
Dist. Amreli, Gujarat
Place of Employment Power Project Site
Maintenance of Power Plant including civil works
Risk/Occupancy :
Policy Period : 12.04.2026 to 11.04.2027
Type of Policy : Workmen Compensation
Legal Liability as per Workmen’s Compensation Act, 1923 and
Scope of cover subsequent amendments of the said Act prior to the date of the
issue of the policy
Fatal Accidents Act
Category of Employee
Unskilled - Maintenance of Buildings and Power Plant
Type of Workers All employees & Workers as defined in WC Act
No. of Employees :
Total Sum Insured
Actual Medical Extension
REQUEST FOR QUOTE - Burglary Floater Policy
Particulars Description Sum Insured
Name of Insured M/s. GSPC Pipavav Power Co. Ltd.
Address for 2nd Floor , Besides Patni Computers (iGATE),
Correspondence FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
Policy Period 12.04.2026 to 11.04.2027
Location to be 1. Power Plant, Hostel and Guest House at Pipavav,
insured Vill. Kovaya, Tal. Rajula, Dist. Amreli, Gujarat
2. Head Office at Gandhinagar, 2nd floor, FF Shed
Nos.A/78/3-8, GIDC Electronic Estate,
Gandhinagar-382016
3. 5 MW Solar Power Plant Premises located at:
Village: Charnka, Taluka: Santalpur, District:
Patan, Gujarat, India
Type of Policy Burglary & Theft - Floater
As per Burglary including Theft (with or without forcible
Coverage entry), Housebreaking, Hold Up Robbery, Dacoity,
Larceny, Riot, Stike, Malicious Damage & Terrorism
1. Office Equipments, Furniture & Fixtures lying at Site
Hostel, Guest House, Site Office at Kovaya, Taluka
Rajula, Dist. Amreli, H.O. 2nd Floor, FF Shed No
A/78/3-8, GIDC Estate, Sector 25, Gandhinagar.
2. Plant & Machinery including spares. Total value at
Risk Rs. 3,534.75 Cr. On 5% First Loss Basis i.e. First
Loss Sum Insured.
Basis of Sum Reinstatement Value Basis
Basis of Indemnity RIV Basis (No deduction for depreciation in case of
Excess 5% of Claim amount subject to a minimum of Rs.
Claim details : 2023-24 Nil
Request for quote – Fidelity Guarantee Policy
Name Of Insured M/s. GSPC Pipavav Power Co. Ltd.
2nd Floor , Besides Patni Computers (iGATE),
Correspondence Address FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
1. Power Project Site office, Hostel and Guest House, At
Pipavav,Vill. Kovaya, Tal. Rajula, Dist. Amreli, Gujarat
Locations to be insured 2. H.O. Gandhinagar - 2nd floor, FF Shed Nos.A/78/3-8, GIDC
Electronic Estate, Gandhinagar-382016
3. 5 MW Solar Power Plant Premises located at: Village: Charnka,
Taluka: Santalpur, District: Patan, Gujarat, India
Type of Policy Fidelity Guarantee Policy
Policy period 12.04.2026 to 11.04.2027
Type of Risk/Occupancy Power Plant
Infidelity on unnamed basis including employees on deputation to
Group companies and vice-versa and contractual employees.
Risk to be covered
This cover is in addition to infidelity cover available under Cash in
Transit section of Money Insurance Policy
Persons to be Covered Five (5) Persons authorized to handle Cash located at Kovaya,
Patan & Gandhinagar.
Total Sum Insured (Rs.) Rs.50,00,000/-
5% of claim amount subject to minimum of Rs. 5000/- for each
and every claim
Claim Details 2024-25: Nil
Enquiry slip for Commercial Crime Policy
GSPC Pipavav Power Co.Ltd.
Including all subsidiary companies and related bodies
corporate including those acquired or incorporated during the
NAME OF INSURED:
Period of Insurance and other entities for which the insured
has assumed an obligation to arrange Insurance for their
respective rights, titles and interests.
GSPC Pipavav Power Co.Ltd.,
2nd Floor , Besides Patni Computers (iGATE),
FF Shed Nos. A/78/3-8, GIDC Electronic Estate,
Sector 25, Gandhinagar.
RENEWAL/NEW BUSINESS: Renewal
POLICY PERIOD: 12.04.2026 to 11.04.2027
POLICY FORM: Commercial Crime Insurance Form
RETROACTIVE DATE: 11.04.2019
NATURE OF BUSINESS: Power Generation
First Party and Third-Party Crime Coverage including:
Employee Dishonesty,
Any Kind of Theft – Please clarify whether Stocks are
covered or not.
On Premises cover
Computer Fraud/ Cyber Crime/ Financial Loss due to IT
Funds transfer fraud
Fraudulent Alteration
Wider Definition of Employees
Ex- Employee Coverage for 60 days post termination of
Counterfeit Currency /Documents coverage/ Credit Card
COVERAGE REQUIRED
Expectation Damages
EXTENSIONS / CLAUSE:
Discovery Period- 90 days, 365 days at Additional Premium
Social Engineering Fraud/ Fake Presidents Fraud
Stock, Money & Securities: Damage, Destruction or
Care, Custody and Control
Automatic Inclusion of New Entities -35%
Non-cancellation Clause
Employee Benefit Plans at no deductible
Claim Series Clause
Coverage for Insured Legal Liability and Legal Expenses
Waiver of Principal Intent.
Internal and External Extortion
No Major Shareholders’ Exclusion
Expenses to be covered as follows:
Additional Costs
Mitigation Costs
Fees and Expenses
Data Reconstitution Costs
Loss Investigation Costs
Court Attendance Costs
Interest receivable and payable
Forensic / Investigative Costs
Vendor Clause
Wide definition of Employee including consultants, seconded
employees, outsourced employees, trustee, fiduciary,
administrator or officer of any plan
LIMIT OF LIABILITY: INR 2.00 Crore Each Claim and in Aggregate
EXCESS INR 5 Lakh Each Claim
TERRITORY/ JURISDICTION: Worldwide including USA/Canada
CLAIMS INFORMATION: As Per Form
UNDERWRITING INFO : As per Proposal form
The information provided to you in this slip/ submission and any related annexures,
electronic files or any correspondence relating to this business transaction is strictly
confidential and is expressly shared for the sole purpose of your evaluating the risk and
providing us with your quote.
The information may not be disclosed in any manner to other parties or used for any
purpose other than providing us with your Quote. Unison reserves the right to take any
legal action it may consider appropriate in case breach of this Confidentiality Clause. This
confidentiality obligation shall survive irrespective of whether the terms offered are
accepted or not and whether the business is placed with you.
Details of IAR policies Serviced as Lead Insurers
Name of Insurer:
Sr. Year Name of Client Risk Location Material Damage
No. Sum Insured (Rs.)
We hereby declare and confirm that the details of IAR Policy / Policies furnished above
are true and correct.
Authorized representative’s signature with name and address and office seal
Declaration regarding Solvency Margin
We hereby declare and confirm that our Solvency Margin for the previous 3 years is as
Authorized representative’s signature with name and address and office seal
Declaration on our present Reinsurance Arrangement
Name of Insurer:
Sr. Name of Reinsurer Credit Rating / Rating
We hereby declare and confirm that the details provided of the reinsurers are the same
as filed by us with IRDA as per stipulated Regulations.
Authorized representative’s signature with name and address and office seal
Undertaking regarding premium quoted
“We state that the rates of premium and the various discounts offered by us in our offer
for GPPC’s Power Plants are strictly as applicable as per IRDA Guidelines. We have
indicated separately all necessary taxes, cess + levies, which are required to be collected
from GPPC. The insurance premium quoted by us is full and final and there will be no
recovery on that account. We further undertake that in case of any claim under the
policy, the recovery of premium from GPPC and the applicability of discount and service
tax etc. will not be an impediment nor will it jeopardize in any manner in the settlement
of claim, if any, lodged by GPPC”.
Authorized representative’s signature with name and address
CERTIFICATE OF DECLARATION FOR CONFIRMATION OF IRDA / TAC
We, ……………………………………………. Hereby certify on behalf of ……………………
that our offer no………………………………….. dated…………………….. against tender
specification no………………….. does not breach any Insurance Act / IRDA guidelines.
We further confirm that in the event of disclosure at a later stage that the same is in breach
and GPPC is put to any disadvantage or face cancellation of the Policy or any claim
becomes substandard / untenable, the whole liabilities arising out of this shall rest wholly
on us and will bear all consequences thereof.
Authorized representative’s signature with name and address and office seal
Insurance Services Contract between GPPC Ltd and Insurance Company Ltd .
Consequent upon enquiry floated by GSPC Pipavav Power Co. Ltd.(GPPC), for various
operational policies in respect of their Gas Based Combined Cycle Power Plants (351.43
MW & 351.43 MW Total 702.86 MW) located at Village: Kovaya, Taluka: Rajula, District:
Amreli – 365 541, Gujarat and 5 MW Solar Power Plant located at Solar Park of Gujarat
At Village: Charnka, Taluka: Santalpur, Dist. Patan, Gujarat and for establishment of good
understanding and to ensure quality & deficiency free service and furthermore the
provision of efficient and satisfactory services by the underwriters, this contract has been
signed between M/s __________________ (Name of Insurer ) having their office
Ahmedabad ( hereinafter referred as underwriter in single and / or underwriters in plural
or the leader of the consortium ) and GSPC Pipavav Power Co. Ltd (GPPC) having its
office at FF shed nos. A/78/3-8, GIDC electronic estate, Besides Patni computers(iGATE),
Sector 25, Gandhinagar - 382016. The Parties, hereby, agree as follows:
A. Documentation
1. The underwriter will issue the Premium Receipt and the Cover note for the desired
coverage, immediately on receipt of the necessary premium cheque and / or Bank
Guarantee by them as the case may be.
2. The corresponding policy documents will be issued by the underwriter to the GPPC
within 7 working days of the receipt of the premium cheque or /Bank Guarantee.
3. Any amendment or endorsement in the policies shall be confirmed by issuing
amendment /endorsement within 1 working days of the receipt of the necessary
request / information, if needed the necessary premium from GPPC. In case of
emergency GPPC has right to ask for the amendment / endorsement on
Telephone and the same shall be acted upon by the underwriter, however later on
written request should be sent to Underwriter.
1. A panel of approved Surveyors, to be utilized in case of all losses/damages for
which necessary claims are to be lodged, shall be finalised by mutual discussions
within 15 days of signing of this agreement or such date as may be mutually be
2. All claims lodged on the underwriter shall be promptly settled as per the following
a) In respect of claims above Rs.50 Lakhs, "On Account Payment" of 75% of
the claimed amount shall be made by the underwriter without any demur
within 15 days of the occurrence of the insured peril. For the sake of brevity
it is clarified that documents required to be obtained from govt. agencies
like FIR, Final Report from Police authorities and Fire Brigade Report etc.
shall not be binding for release of On Account Payment.
b) Rest 25% claim amount (Final payment of the claim) shall be made within
5 days of receipt of Final Survey Report and all necessary supporting
documents/information from GPPC.
c) In the event of a loss, the underwriter shall appoint Surveyor/ Loss Adjustor
immediately on the receipt of notification, however online intimation or
intimation on Phone by GPPC to the authorized person of the underwriter
shall be construed as valid intimation under the policies. Furthermore, a
dedicated person from the claim department of the Underwriter shall be
allocated to GPPC and his telephone, fax and ID shall be intimated.
3. GPPC has been authorised for Self Survey in respect of claims with estimated loss
upto amount of Rs. 20000/- only or such higher amount as mentioned in Insurance
Act 1938 or rule made there under from time to time.
4. The underwriter has agreed to provide to GPPC with a comprehensive procedure
and documents to be followed in case of claims, within 30 days of commencement
of insurance of GPPC’s risk.
5. It is agreed that _______________is the leader of the consortium and other
members of the consortium have agreed to the revised terms of Insurance. The
Co shall deal with the leader only in all matters. However, in case of repudiation of
any claim by leader, the claim shall stand repudiated if & only if the co-leader &
other members of the consortium has also agreed on repudiation in writing.
6. In case of any MD /LOP claim made by GPPC in pursuance of its IAR or other
policies as taken in pursuance to GPPC’s invitation of Tender Document dated ---
---including any modification thereof, if any, the liability shall be joint & several for
each of the members of the Consortium. Furthermore, GPPC has right & option,
at its discretion, to make claim separately with each of the members of the
consortium in proportion to their share.
C. Others/ Miscellaneous.
1. The underwriters confirm that the premium quoted is final and are as per the
internally / Board approved guidelines or underwriting policy and that there is no
violation of any or other mandatory guidelines/rules. Any upward revision, other
than due to tariff revision and govt. levies and duties, in the premium, if found at
later date, will be borne by the underwriter. The benefit due to downward revision,
due to tariff revision and Govt. levies, in the premium shall be passed on to M/s.
2. The Leader has appointed following persons to service directly GPPC account in
respect of all matters including underwriting or / and claim. Their present address
and contact Nos. are as under ;
3. The underwriters agree upon binding of the contract, a RISK INSPECTION will be
carried out during the policy period and required RI measures, if any, will be
brought to notice of the GPPC management for their perusal and implementation.
4. The underwriter has further agreed to hold one seminar/training during the policy
period exclusively for GPPC employees to update them with latest trends in
5. GPPC shall be dealing/interacting directly with the leader of the consortium namely
M/s _____________ for all relating matters and the leader shall, in turn, interact,
with the co insurers, if any. ______________ shall be responsible for all acts/duties
as there is/were single insurance company providing insurance cover to GPPC. In
case of any dispute with co-insurers, M/s ______________ shall be responsible
for settlement of full claim amount of GPPC.
6. In case of de-tariffing in wording of IAR or any policy becoming applicable for any
or all policies on or before expiry of current policies, underwriter herewith agrees
to cancel the existing policies upon request of the GPPC and refund the pro-rata
premium (on the basis of no. of days only) to GPPC. GPPC shall be then at liberty
to invite fresh quotes for the insurance and place the insurance to any company/ies
that it deems fit.
7. The underwriter unequivocally agrees that during the year / tenure of Policy, GPPC
can increase or decrease the Sum Insured of any of the assets / liability etc of any
of the policies in order to make it match with market conditions and for that only
pro-rata rate shall be applicable not short period rates.
8. The underwriter unequivocally agrees that there may be some spill over of sum
insured amount from one part of the assets into another part of the same asset or
of some other asset but in the same category then no underinsurance shall be
applicable. Which means excess of some assets, if done by GPPC on account of
its judgment, may be set off against the short value of other assets.
9. The Underwriter agrees to refund one-third of the premium paid on account of
Business Interruption if the audited Annual Gross Profit ending 31-03-2027
happens to be lower than what has been taken in the Policy. It also agrees to
refund the pro rata premium of Industrial Liability if the audited Turn Over for 31-
03-2027 happens to be lower than what has been taken in the said Policy.
10. It is agreed that the Surveyor shall be appointed with the mutual consent of GPPC
and the leader insurance company.
D. Breach of the contract.
In case of breach or violation of any of the provisions of this agreement/ contract,
the underwriter shall have to pay penalty of such amount as may have suffered by
GPPC whether actual or notional and furthermore it shall have such rights as may
be deemed fit by GPPC.
In addition to clause D, underwriter shall also indemnify GPPC of all actual or
notional or consequential losses which GPPC may suffer as a result of breach of
underwriters of the underwriting policy /guidelines/ directives / rules by underwriter.
This means that the underwriter shall make good all losses, actual or notional or
consequential, to GPPC in the event of breach of any of the guidelines
GSPC Pipavav Power Company Limited
Designation: Designation:
Accepted, agreed and noted. Signature.
Other Consortium Members.
DEVIATION STATEMENT
(Pl. strike off the clause which is not applicable and tick the other)
1) THIS IS TO DECLARE THAT WE DO NOT HAVE ANY DEVIATIONS IN THE
STIPULATIONS OF YOUR TENDER AND ACCORDINGLY ACCEPT ALL THE
STIPULATIONS WITHOUT ANY RESERVATIONS WHATSOEVER.
2) WE HAVE TAKEN FOLLOWING DEVIATIONS IN THE COVERAGE.
Sr. No Particulars
Authorized representative’s signature with name and address
DECLARATION SHEET
We,………………………………………… have noted that GPPC has not engaged any
intermediary (any agent or broker) for purchase of insurance & that All policies are being
placed directly to Insurers by GPPC. Accordingly, we have not considered any
commission payable to any intermediary in our premium quote and we undertake not to
pass on any such commission/brokerage to any intermediary.
Authorized representative’s signature with name and address
INSURER TO CONFIRM ONLY COMPLIANCE OF SUBMISSION OF PREMIUM
CALCULATION IN PRICE BID COVERING ALL THE COVERAGES WITH ADD ON
COVERS MENTIONED HERE BELOW. PLEASE DO NOT MENTION ANY PRICE
RELATED INFORMATION IN THIS FORM.
(ref General Condition (r).
TECHNICAL BID BY M/S…………….
PREMIUM RATE ANALYSIS Sum Insured Confirmation of
Rs. In Cr. compliance in
be mentioned in
BID PARTICIPATION / CAPACITY FOR PROPERTY COVER _____%
1.0 MATERIAL DAMAGE YES No
1.ALL RISK SECTION 3714.33 Cr.
2. MACHINERY BREAKDOWN 3004.54 Cr.
2.0 BUSINESS INTERRUPTION
1. FLOP BI (12 months IP)
2. MACHINERY LOSS OF PROFIT (12 months IP)
MATERIAL DAMAGE:
1. EARTHQUAKE (FIRE & SHOCK) & STFI COVER TSI
2. AGREED BANK CLAUSE
3. DESIGNATION OF PROPERTY CLAUSE
4. LOCAL AUTHORITY CLAUSE
5. ARCHITECTS, SURVEYORS & CONSULTING ENGINEERS
FEES CLAUSE (IN EXCESS OF 3%)
6. REMOVAL OF DEBRIS CLAUSE (IN EXCESS OF 1%)
7. OMISSION TO INSURE ADDITIONS, ALTERATIONS OR 5% of BMA SI
EXTENSIONS ETC.
8. START-UP & SHUT DOWN EXPENSES
9. PROPERTIES / GOODS HELD IN TRUST.
10. 72 HRS CLAUSE
11. ON ACCOUNT PAYMENT CLAUSE
12. NOMINATED LOSS ADJUSTER CLAUSE
13. AUTOMATIC REINSTATEMENT CLAUSE
14. FIRE FIGHTING EXPENSES
15. LOSS MINIMIZATION EXPENSES
16. REINSTATEMENT VALUE CLAUSE
17. Minor works clause
18. Immediate Repairs clause
19. Expediting Expenses clause
20. Capital Addition clause
21. ESCALATION CLAUSE 5% of BMA SI
22. IMPACT DAMAGE CLAUSE Full SI
23. INVOLUNTARY BETTERMENT CLAUSE
BUSINESS INTERRUPTION
1. SUPPLIER EXTENSION UNDER FLOP 20% of BI SI
2. CUSTOMER EXTENSION UNDER FLOP 20% of BI SI
3. DEPARTMENTAL CLAUSE
4. ALTERNATIVE BASIS CLAUSE
5.DENIAL OF ACCESS CLAUSE 20% of BI SI
6.FIXED COST REIMBURSEMENT CLAUSE
7.SUM INSURED ADJUSTMENT CLAUSE
8.AUDITORS FEES & CLAIM PREPARATION EXPENSES
9.LOCAL AUTHORITY CLAUSE
10. UTILITY EXTENSION 17% of BI SI
11. Increased cost of working
4.0 ADD-ON COVERS
MATERIAL DAMAGE
1. EARTHQUAKE TSI
3. Escalation clause 5% of BMA Sum
4.Omission to insure additions, alterations or extensions etc. 5% of BMA Sum
5. REMOVAL OF DEBRIS
6. ARCHITECT, ENGINEERS AND CONSULTING ENGINEER
7. START UP & SHUT DOWN EXP.
8. FIRE FIGHTING EXPENSES ACTUAL
9. LOSS MINIMIZATION EXPENSES COVER
10. MINOR WORK CLAUSE
11. EXPEDITING EXPENSES
12. IMMEDIATE REPAIRS
13.IMPACT DAMAGE Full SI
14.INVOLUNTARY BETTERMENT
15. Preparation of Lost records/Computer Records, Valuable
Papers/Plans & Records Clause/Cost of Re-writing records
16.Additional Customs Duty
17.Demolition and Increased Cost of Construction
18.Property in Course of Construction/Erection
19.Undamaged Foundations
20.Obsolete Spare Parts
21.Sprinkler Up-Grading Costs
22.Deliberate Damage
23.Temporary Removal of Property / Stocks Clause
BUISNESS INTERRUPTION
1. SUPPLIER’S EXTENSION COVER 20% OF BI S.I.
2. CUSTOMER’S EXTENSION COVER 20% OF BI S.I.
3. AUDITOR FEES & CLAIM PREPARATON EXPENSES
4. DENIAL OF ACCESS 20% OF BI S.I.
5. Public Utility Extension 17% of BI S.I.
5.0 Material Damage Deductible 5% of claim
amount subject to
minimum Rs.1.25
6.0 TIME EXCESS
Standalone Terrorism Policy – Limit of liability Rs.2050 Cr
War Risk Buy Back cover
IAR Policy – for 5 MW Solar Power Plant
1.0 MATERIAL DAMAGE
1.ALL RISK SECTION
2. MACHINERY BREAKDOWN
2.0 BUSINESS INTERRUPTION
1. FLOP BI (12 months IP)
2. MACHINERY LOSS OF PROFIT (12 months IP)
ADD ON COVERS : M.D.
1. EARTHQUAKE TSI
3. OMISSION TO INSURE ADDITIONS, ALTERATIONS OR 5% of BMA S.I.
EXTENSIONS CLAUSE
4.Escalation 5% of BMA S.I.
5. REMOVAL OF DEBRIS
6. FIRE FIGHTING EXPENSES ACTUAL
7. EXPEDITING EXPENSES
8. IMMEDIATE REPAIRS
9. LOSS MINIMIZATION EXPENSES COVER
10. MINOR WORK CLAUSE
12. THIRD PART LIABILITY COVER
13.Property in Course of Construction/Erection
14.Obsolete Spare Parts
15.Deliberate Damage
16.Temporary Removal of Property / Stocks Clause
ADD ON COVERS : LOP SECTION (FLOP & MLOP)
1. CUSTOMER EXTENSION 20% OF BI S.I.
2. DENIAL OF ACCESS 20% OF BI S.I.
3. SUPPLIER EXTENSION 20% OF BI S.I.
4. PUBLIC UTILITY EXTENSION 17% OF BI S.I.
Standard Fire & Special Perils /Laghu Udhyam Policy (as per
Public Liability Act (cover as per slip attached)
Commercial General Liability Insurance Policy (cover as per slip
Marine Open Policy for Domestic Goods (cover as per slip
Marine Open Policy for Import/Export (cover as per slip
Money Insurance (cover as per slip attached)
Electronic Equipment Insurance (cover as per slip attached)
All Risk Policy for Laptop (cover as per slip attached)
Directors & Officer Liability Policy (cover as per slip attached)
Workmen Compensation Insurance (as per slip attached)
Burglary Floater Insurance (as per slip attached)
Burglary Floater Insurance (5% on first loss basis)
Fidelity Guarantee (Floater) Policy (as per slip attached)
Commercial Crime Policy (as per slip attached)
For ______________________ Insurance co.Ltd. Authorised
Annexures A to D need to be filled with Price Only. No
deviation, remarks, qualifications, subjective statements need
to be added to the Price Bids. Any violation of these may lead
to the rejection of offer by GPPC.
Format for Bid Submission of IAR of 702.86 MW CCPP
Particular Sum Insured Premium
Material Damage Section
All risks cover including all INR
B Machinery Breakdown cover INR
Business Interruption Section
C FLOP cover incl. all extensions INR
D MLOP cover INR
Total Premium (Excluding GST)
Total Premium (Including GST)
Period: The above policies are required for the tenure 12th April 2026 to 11th April
Format for Bid Submission of Terrorism and Sabotage Insurance Cover
Particular Sum Insured Premium
Terrorism and Sabotage
Insurance Cover
Total Sum Insured for both units of
702.86MW CCPP 2,050.00 Cr
Limit for War Risk Buy Back Cover 250.00 Cr
Total Premium (Excluding GST)
Total Premium (Including GST)
Period: The above policies are required for the tenure 12th April 2026 to 11th April
Format for Bid submission of IAR of 5MW Solar Project
Particular Sum Insured
Material Damage Section
A All risks cover incl.all extensions INR
B Machinery Breakdown cover INR
C Terrorism Cover INR
Business Interruption Section
D FLOP cover INR
E MLOP Cover INR
Total Premium (Excluding GST)
Total Premium (Including GST)
Period: The above policies are required for the tenure 12th April 2026 to 11th April
Format for Bid Submission (Misc. Policies)
S.No. Name of the Policies SI (Rs) Premium (in Rs.)
1 Standard Fire Policy /Laghu Udyam Policy INR
2 Public Liability Policy AOA/ AOY (Act) 250 Crs./ 500 Crs.
3 Commercial General Liability Policy 50 Cr/50 Cr
4 Marine Open Policy (Domestic) 2.00 Cr.
5 Marine Open Policy (Export/Import) 2.00 Cr.
6 Money Insurance(as per slip) 0.50 Cr.
7 Electronic Equipments Insurance Policy
All Risk Insurance For Portable Electronic
8 Equipments (incl. laptops, cameras,
digicams, etc.)
9 Directors & Officers Liability 10.00 Cr.
10 Workmen Compensation Policy 0.36 Cr.
Burglary – Floater Policy :
1. Office equpt, FFF etc.100%
2.Plant & Machinery incl. spares on 5%
first loss basis
12 Fidelity Guarantee Policy 0.50 Cr.
13 Commercial Crime Policy
Total Premium (Excluding GST)
Total Premium (Including GST)
Period: The above policies are required for the tenure 12th April 2026 to 11th April
Total Premium plus taxes/duties amount Rupees in figures
in words……………………………….
Authorized Signatory
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document - GPPC - 2026-27.pdf
GSPC Pipavav Power Company Limited_Kovaya_RUIR_6 Feb 26 V1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .