Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.7 CrAdmitted-Finance | ₹3.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.8 CrAdmitted-Finance | ₹3.8 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AAYKAYCONSTRUCTIONS L2 | T. MUHAMMED SADATHALI L1 | saaj constructions L3 |
|---|---|---|---|---|---|---|
| 1.00Parakkad Vietnampadi-Veluthoor Road | ||||||
| 1.00 | 3.6
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity
including cutting and loading in tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades and cross sections, and transporting to
the embankment location within all lifts and lead upto 1000m | 673.33 | cum | 50 ₹33,666.6 | 49.78 ₹33,518.47 | 80 ₹53,866.56 |
| 1.00 | 2.5.1.A
Dismantling of flexible pavements and disposal of dismantled materials up to a lead
of 1000 metres, stacking serviceable and unserviceable materials separately
Bituminous courses - By Manual Means | 1,530.05 | cum | 2,000 ₹30,60,102 | 1,933.74 ₹29,58,720.82 | 1,980 ₹30,29,500.98 |
| 1.00 | 4.1.A.1
Construction of granular sub-base by providing graded Material, mixing in a
mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in
uniform layers with a motor grader on the prepared surface and compacting with
vibratory power roller to achieve the desired density, complete as per clause 401
Grading-I - Plant Mix Method | 1,898.16 | cum | 3,800 ₹72,12,996.6 | 3,713.64 ₹70,49,071.76 | 3,900 ₹74,02,812.3 |
| 1.00 | 4.12
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix
Macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
layers with paver in sub- base / base course on well prepared surface and compacting
with vibratory roller to achieve the desired density. | 1,530.05 | cum | 3,700 ₹56,61,188.7 | 3,655.42 ₹55,92,979.03 | 3,800 ₹58,14,193.8 |
| 1.00 | 5.1.a
Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface
of granular Base including clearing of road surface and spraying primer at the rate of
0.70 - 1.0 kg/sqm using mechanical means. | 10,200.34 | sqm | 65 ₹6,63,022.1 | 63.15 ₹6,44,151.47 | 80 ₹8,16,027.2 |
| 1.01 | 5.2.a
Providing and applying tack coat with bitumen emulsion( RS) using emulsion
pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous
surface cleaned with mechanical broom. | 10,200.34 | sqm | 15 ₹1,53,005.1 | 12.28 ₹1,25,260.18 | 20 ₹2,04,006.8 |
| 1.01 | 5.3.2.a
Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing
an average output of 75 tonnes per hour using crushed aggregates of specified grading
premixed with a bituminous binder (VG 30), transported to the site, laid over a
previously prepared surface with paver finisher to the required grade, level, and
alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired
compaction For Grading II - (19 mm nominal size) | 510.02 | cum | 9,500 ₹48,45,161.5 | 9,025.32 ₹46,03,066.63 | 9,300 ₹47,43,158.1 |
| 1.01 | 5.6.2.a
Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing
an average output of 75 tonnes per hour using crushed aggregates of specified
grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler,
transporting the hot mix to work site, laying with a hydrostatic paver finisher with
sensor control to the required grade, level, and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 507 complete in all respects For Grading - II (13.2
mm Nominal Size) | 306.01 | cum | 15,000 ₹45,90,150 | 14,250.06 ₹43,60,660.86 | 14,500 ₹44,37,145 |
| 1.01 | 12.8.1.C
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and
Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without
formwork) | 536.44 | cum | 8,900 ₹47,74,307.1 | 8,867.31 ₹47,56,770.91 | 9,000 ₹48,27,951 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
13 Feb 2026, 4:00 pmClosed
ENGINEER (PROJECTS)
KEL MAMALA KOCHI
GENERAL-Navakerala Sadass-Construction of Muthuthala -Ansar -Parakkad -Vietnampadi - Veluthur Road, Palakkad District-General Civil Work
2026_KEL_834153_1
KRO/BDC/2200/2026
Open Tender
Civil Works - Buildings
KEL MAMALA KOCHI
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,850
₹1 L
Yes
18 Feb 2026
6 Feb 2026
14 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
6 Feb 2026 - 13 Feb 2026
Parakkad Vietnampadi-Veluthoor Road
3.6 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
2.5.1.A Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous courses - By Manual Means
4.1.A.1 Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12 Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
12.8.1.C Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
OD162732/2025-2026 Supplying and fixing granite board 0.60m x0.45m with CC 1:2:4 1.00x1.00 m
Muthuthala-Ansar Nagar Road
3.6 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
3.15 Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
2.6 Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
2.5.1.A Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous courses - By Manual Means
4.1.A.1 Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12 Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.2.a Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
6.2 Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
12.8.1.C.1 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
OD162733/2025-2026 Supplying and fixing granite board 0.60m x0.45m with CC 1:2:4 1.00x1.00 m
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
7.GRANULAR SUB BASE: Quantity by level calculation & reporting to CTE as per norms
8.BITUMINOUS MACADAM: Quantity by level calculation & reporting to CTE as per norms
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1403045.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid