Loading…
Loading…
| # | Company | Quoted % | Rank | Status |
|---|---|---|---|---|
| 1 | L1Admitted-Fee/PreQual/Technical/Finance | -22.50% | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1Admitted-Fee/PreQual/Technical/Finance | -25.60% | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
24 Aug 2026, 3:00 pmClosed
Xen IFC Sopore
Xen IFC Sopore
C/O Gate wall with Lining wall on check khul near H/O Farooq ahmad dar C/O Lining Wall near H/o Bashir ahmad Malla to Onwards at ganie Mohalla Darnambal
2026_IFC_320853_8
enit.08.IFCD.SPR.2026.27
Open Tender
Civil Works
Percentage
25 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Chief Engineer IFC Dept Srinagar
₹12,000
25 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 115.47 | Cum | 187.3 | ₹21,627.53 |
| 2 | Providing & Laying Dry Stone Solong Including Cost of Stones | 6.89 | Cum | 937.9 | ₹6,462.13 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.41 | cum | 5,202.9 | ₹2,133.19 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.16 | cum | 9,395.7 | ₹20,294.71 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.81 | Cum | 7,788.4 | ₹6,308.6 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 43.2 | cum | 6,591.25 | ₹2,84,742 |
| 7 | Fabrication, manufacturing and installation of Regulating Iron Gate with necessary lifting/operating mechanism (manual) with M.S plate 6mm nominal thickness which is to be fixed on specified and designed builtup section channel/beam or similar with cross channel/beam. The assembly has to withstand/sustain worst anticipated loading combination. The gate is to be driven manually with the help of Gun metal winch machine with 50mm thick Gun metal threaded shaft for a vertcal motion of 5KN gate. The gate is to be fixed with rubber seal of standard quality on three sides of gate duly tested and commissioned including side channels of specified section and sill girders, grooves rubber seals, etc, incl. its painting and all carriage upto site of work. (complete job) | 1 | Job | 1,50,000 | ₹1,50,000 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. | 237.6 | kg | 123.2 | ₹29,272.32 |
| 9Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 9.1 | Foundations, footings, bases of columns etc. for mass concrete. | 117.42 | SQM | 286.35 | ₹33,623.22 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1068132.xls
BOQ • 0.33 MB
corrigendum02.pdf
PDF • 0.55 MB
corrigendum08.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .