Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹41.4 L
EMD Value
₹42,000
Closing Date
22 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Panchayat (R&B) Division, Tapi
Mukhyamantri Adimjuth Sarvangi Utkarsh Scheme 2024-25. Const. of Sadadvel Village Kotvaliya Faliya road Sec-I 0/0 to 0/185, Sec-II 0/0 to 1/120 Ta.Songadh Dist.Tapi.
354564
17 OF 2026-27 (8th Trial)
Open
Civil Works - Roads
Works
Tapi
6 documents required · 6 mandatory
₹1,500
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹42,000
12 Oct 2026
12 Oct 2026
12 Oct 2026
22 Oct 2026
12 Oct 2026
Name of Work:-.Mukhyamantri Adimjuth Sarvangi Utkarsh Scheme 2024-25 Const.of Sadadvel Village Kotvaliya
Faliya road Sec-I 0/0 to 0/185, Sec-II 0/0 to 1/120 Ta.Songadh Dist.Tapi.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) Figures
1 Clearing and grubbing road land including uprooting 0.39 Hect 28455.10
rank vegetation grass bushes,shrubs,sapling and trees
girth up to 300 mm removal of stumps of trees cut
earlier and disposal of unserviceable materials (C) By
mechanical means in area of light jungle.
2 Earthwork in cuting in all sorts of soil and soft murrum 822.15 Cum. 130.94
including conveying and spreading the stuff,
embankment as and where directed within 200meters
from the end of the cutting with all required lead and lift.
3 Earth work for embankment including breaking clods 1003.61 Cum. 173.67
dressing with all lead & lifts and including watering
rolling and consolidation of sub grade in layers of
O.M.C. to required dry density including filling in
depressions which occure during the process using
vibratory roller 80 to 100 KN (E) From borrow area
within 3.00 Km Lead Having C.B.R. More than 5.00%
4 Scarifying gravelled macadam or bitumen macadam 1290.00 Sqmt 41.74
surface 6 cm to 10 cm.depth including stacking useful
materials on road side and disposing off remaining stuff
5 Supplying, Stacking, Spreading & rolling of Hard 157.00 Cum. 373.70
Murrum on road side for hard side shoulder of work as
per specification including filling the mesure boxes of
standard size etc. complete.
6 Providing and laying Granular Sub Base Grade I by 346.00 Cum. 652.46
providing course graded material conforming to Table
400-2 of MOST specification of grading I,using material
combination of crushed aggregate, stone dust etc. as
required gradation including spreading,watering &
consolidation by vibratory roller in grade and camber as
7 Consructing of granular sub-base Gr-II by providing 528.80 Cum. 602.97
course graded B.T. machine crushed material satisfying
MOST specification of grading II including spreading in
uniform layer with motor grader on prepared surface,
mixing by mix in place method with rotavator at OMC
and compacting with vibratory roller to achieve the
desired density etc. complete.
8 Providing and laying of Wet Mix Macadam base course 582.00 Cum. 748.41
as per MORTH specification using machine crushed
B.T. chips as per required gradation, mixing with
required optimum quantity of water, conveying the mix
to site of work, spreading in to grade and camber with
paver/mechanical means and consolidation each layer
with vibratory roller to aschieve the desired density
including cost of material labour plant and equipment
9 Providing and applying primer coat with Bitumen 2668.00 Sqmt 39.49
emulsion (SS-I) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 7.50 kg/ 10sqmt using mechanical means as
per Technical Specification Clause 502. (Hincol made
only ) (ii) Medium porosity
10 Providing & laying bituminious base course 37.5 mm 297.00 MT 2100.80
thick compacted in single layer asphalt VG-30 grade at
1.99 % by weight of mix for mixing and asphalt VG-30
for tack coat @ 2.5 kg/10 smt using B.T. chips of
required gradation including cleaning and heating
asphalt, premix material by drum mix process in proper
gradation and laying with paver finisher including
rolling and consolidation with 8-10 tonne vibratory
roller and providing all material equipment, tools, and
plants, fire wood, oil, kerosene labour charges etc.
complete using contractor's own machinaries, drum mix
plant and paver finisher etc. complete.
11 Providing, laying 25mm thick compacted bituminous 208.00 MT 2841.13
carpet considering 0.66 cmt./10Smt. Stone chips for one
M.ton as per specification, using the asphalt at rate
33.60 Kg/M.ton (i.e. 3.36% by weight of total mix)(VG-
30) and asphalt for tack coat at rate 2.5 Kg/ 10sq.mt VG-
30. including heating and mixing the asphalt and stone
aggregates by continuous batching of drum mix plant
and transporting and spreading the same by paver
finisher and consoli-dation with vibratory roller with
necessary equipments oil, kerosene,fire wood labour
charges etc comp.with contractor's own machineries and
equipment tools etc. complete in accordance with the
12 Providing and laying seal coat with B.T. aggregate 107.00 MT 3100.70
as specified using aggregate at the rate of
Cu.mt./10 Sq. mt. and bitumen grade VG-30 for mixing
with aggregate at the rate of 4.50 % i.e. 45.00 Kg. / M.T
including heating & mixing in hot / drum mix plant &
transporting & sreading the same by paver finisher &
consolidation with vibratory roller incl. necessary
firewoood, oil, lubricants, labour charges etc. using
contractor's own drum mix plant, machineries &
equipment, tools etc. complete in accordance with the
requirement of specification.
13 Providing and laying asphalt painting on B.T. surface 3958.00 Sqmt 31.95
with bitumen VG-30 at rate 5.00 Kg / 10.00 Sq.mt. of
bitumen including spreading stone dust for painting
surface at rate of 0.03 cu.mt. / 10 sq.mt.
14 Providing and fixing ordinary Kilometer stone of precast 3.00 Nos. 1293.39
C.C. 1:2:4 including necessary reinforcement as per
I.R.C. type design in C.C. 1:4:8 including letter and
paints etc. complete (For N.H., S.H. and M.D.R.)
15 Providing and fixing Hectometer stone as per I.R.C. type 6.00 Nos. 356.50
design including lettering and painting etc. complete. (ii)
Fixing in C.C. 1:5:10
16 Village name/ Bump Ahed sign :-Providing and fixing 2.00 Nos. 5045.36
sing boards made out of 2mm aluminium sheet; size 90 x
60cms. rectangle as as per the design of IRC-67-1977
pre treated with phospheting process & acid etching;
coated with one coat of epoxy primer and two coats of
best quality epoxy paint; reflectorised with retro
refiective sheeting as per latest M.O.S.T. Specifications;
Letters and numerals should be as per IRC-30-1968,
3.1m long (2 nos) stand post and frame fabricated from
suitable size iron angle of 50 x 50 x 5mm painted with
best quality epoxy coatings in black and white bends. the
details of symbol or inscription / numerals for each
board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC block of
size 45 x 45 x 60cms. for each leg. including excavation
curing etc.complete under the supervision of engineer in
charge.(A) Engineer grade..
17 Direction sign (Junction board):-Providing and fixing 2.00 Nos. 14831.71
sing boards made out of 2mm aluminium sheet; size
x 90 cms. rectangle as as per the design of IRC-67-1977
pre treated with phospheting process & acid etching;
coated with one coat of epoxy primer and two coats of
best quality epoxy paint; reflectorised with retro
refiective sheeting as per latest M.O.S.T. Specifications;
Letters and numerals should be as per IRC-30-1968,
3.1m long (2 nos) stand post and frame fabricated from
suitable size iron angle of 50 x 50 x 5mm 75x75x6mm
as required; painted with best quality epoxy coatings in
black and white bends. the details of symbol or
inscription / numerals for each board shall be as per the
instruction of engineer in charge. The fixing at site shall
be in 1:2:4 CC block of size 45 x 45 x 60cms. for each
leg. including excavation curing etc. complete under the
supervision of engineer in charge.(A) Engineer Grade.
18 Informatory Signs :-Providing and fixing sing boards 1.00 Nos. 3856.90
made out of 2mm aluminium sheet; size 80 x 60cms.
rectangle as per the design of IRC-67-1977 pre
treatedwith phospheting process & acid teching; coated
with one coat of epoxyprimer and two coats of best
qualityepoxy paint; reflectorised with retro refiective
sheeting as per latest M.O.S.T. Specifications; 3.1m
long stand postand frame fabricated from suitable
sizeiron angle of 35 x 35 x 3mm75x75x6mm as
required; painted with best qualityepoxy coatings in
black and whitebends. the details of symbol for
eachboard shall details of symbol for eachboard shall be
as per the instruction ofengineer in charge. The fixing at
site shall be in 1:2:4 CC block of size 45 x45 x 60cms.
for each leg.including excavation curing tec. complete
under the supervision of engineer in charge.(A) Engineer
19 Road marking with hot applied thermoplastic paints with 280.20 Sqmt 367.72
reflectorising glass beads on bitumin surface providing
and laying a hot applied thermoplastic compound
mm thick including reflectorising glass beads @ 250gms
per sqm area, thickness of 2.5mm is excluding of surface
applied glass beds as per IRC:35- 2015. The finished
surface to be level, uniform and free from streaks and
holes. zebra patta /bump patta lane/center line/ edge
line/cut patta. The white color marking should provide
liminance coefficinet on cemend road shalll be min
mcd/m2/lux and Asphalt road shall be min
mcd/m2/lux during the service life during the day time.
The marking should meet the performance criteria for
night time reflectivity, wet reflectivity and skid
resistance as mentioned in the section-15 of IRC 35-
2015. Warranty for the Retro reflectivity should be two
20 Supplying and fixing cat eye (Stimsonite) made out from 177.00 Nos. 375.72
Acrilo beautile sterine injuction high compressed
molding with reflector made of MMC (prismatic type of
size 12cm x 6cm x 2.5cm) provided with
bituminousadhesive 100g. with each unit for fixing.
(High Intensity grade)
21 Cautionary Warning Sign :-Providing and fixing sing 8.00 Nos. 3808.66
boards made out of 2mm aluminium sheet; size 90 x
x 90 cms. equilateral triangle as per design of IRC-67-
1977. Pre treated with phospheting process & acid
etching; coated with one coat of epoxy primer and two
coats of best quality epoxy paint ;reflectorised with retro
refiectivesheeting as per latest M.O.S.T.Specifications;
3.1m long stand postand frame fabricated from suitable
sizeiron angle of 35 x 35 x 3mm, 75 x 75 x 6mm as
required; painted with bestquality epoxy coatings in
black andwhite bends. The details of symbol foreach
board shall be as per theinstruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC blockof
size 45 x 45 x 60 Cms. for each leg.including
excavation, curing etc.complete under the supervision of
engineer in charge.(B) Engineering Grade.
22 Supplying and fixing reinforced concrete heavy duty 15.00 rmt 1968.38
nonpressure pipes with collars for culverts carrying
heavy traffic as per IS 458-1991 specifications including
setting the pipes in C.M. 1:2 watering and laying (to
level or slopes) of class NP3 of following internal
daimeters.(iii) 600mm dia.
23 Excavation for foundation upto 1.5 mt. depth 228.00 Cum. 254.36
including sorting out and stacking of useful
materials and disposing of the excavated stuff by
Engineer in charge with all lead and lift in. (2) Dense or
24 Providing and filling in foundation with ordinary cement 20.70 Cum. 3326.71
concrete M-100 mix and providing necessary vertical
pin header sbincluding form work vibrating ramming
and curing completed.
25 Providing & casting in situ ordinary cement concrete M- 96.10 Cum. 3904.76
150 mix and providing necessary pin headers including
shuttering, scaffolding, laying, vibrating, curing and
finishing complete without V-Groves.(A) Height from
26 Supplying and fixing reinforced concrete heavy duty 15.00 rmt 3469.26
non-pressure pipes with collars for culverts carrying
heavy traffic as per IS 458-1991 specifications including
setting the pipes in C.M. 1:2 watering and laying (to
level or slopes) of class NP3 of following internal
daimeters.(v) 900mm dia. (more than 10 ton)
27 Supplying and fixing reinforced concrete heavy duty 22.50 rmt 5560.01
non-pressure pipes with collars for culverts carrying
heavy traffic as per IS 458-1991 specifications including
setting the pipes in C.M. 1:2 watering and laying (to
level or slopes) of class NP3 of following internal
daimeters.(v) 1200mm dia. (more than 10 ton)
28 Providing & fixing guard stone as per I.R.C. type design 30.00 Nos. 350.80
including white washing etc.
29 Providing and fixing 20cm x 15cm x 2.5cm thick year 3.00 Nos. 279.69
plate of marble stone set in C.M. 1:4 including Finishing
and engraving letters, etc. complete
30 Wall painting (two coats) with plastic emulsion paint of 129.80 Sqmt 81.38
approved brand and manufacture on undecorated wall
surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in figures and
words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed by the Engineer – In –
Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt G.R.: PRC-10/2017
Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in R.C.C. items where the reisa change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD_ Sadalvel Kotvaliya f.pdf
BOQ_Sadalvel Kotvaliya f.pdf
Specification Sadalvel Kotvaliya f.pdf
GR all SBd with Index-1.pdf
GR all SBd with Index-2.pdf
GR all SBd with Index-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .