| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.2 CrAccepted-AOC | ₹94.2 Cr | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹99.1 CrRejected-AOC 175 2 SOUTH STATE BANK NAGAR CHETTIPALAYAM ERODE TAMIL NADU 638002 | ERODE | TAMIL NADU | 638002 | ₹99.1 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹100.3 CrRejected-AOC | ₹100.3 Cr | L3 | Rejected-AOC Rejected |
| 4 | L4₹108.7 CrRejected-AOC | ₹108.7 Cr | L4 | Rejected-AOC Rejected |
| 5 | L5₹110.3 CrRejected-AOC KANNUR | KERALA | 670001 | ₹110.3 Cr | L5 | Rejected-AOC Rejected |
Tender Value
₹100.3 Cr
EMD Value
₹5 L
Closing Date
12 Mar 2025, 6:00 pmClosed
Superintending Engineer, HESC
Superintending Engineer, HarbourEngineering South Circle, Kamaleswaram, Manacaud (PO), Thiruvananthapuram-9
Extension of South Breakwater, Road Over Breakwater and Replenishment of existing Breakwater
2025_HED_736594_1
HED/CEHED/TR/77/2024_5_1_1/1
Open Tender
Civil Works - Others
545 days
Muthalappozhy Fishing Harbour
Please refer Tender documents.
17 documents required · 17 mandatory
₹16,540
Yes
₹5 L
Yes
O/o Superintending Engineer, HESC, TVM-9
19 Jul 2025
11 Feb 2025
14 Mar 2025
11 Feb 2025
12 Mar 2025
11 Feb 2025
24 Feb 2025
Amount
Extension of breakwater
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD7861/2024-2025:Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site. <br> Thiruvananthapuram District based on 65.17
OD7644/2023-2024:Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Thiruvananthapuram District based on 65.18
OD3182/2024-2025:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Thiruvananthapuram District
OD7646/2023-2024:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 500kg and above category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Thiruvananthapuram District( based on 65.20)
65.124:Moulding and supplying cement concrete 3.2 m3 (8T) tetrapod with graded aggregate of 40% 75mm to 40mm, 30% 40 to 20mm, 30% 20 to 5 mm using 380 kg cement /m3 of concrete as per approved mix design of mix proportion 0.5:1:1.46:3.22 by weight of water, cement, fine aggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively and the cement shall be 43 grade or higher) minimum cube strength requirement (i) @ 7 day - 20N/mm2 (ii) @ 28 day - 30N/mm2 and minimum density of concrete 2.5g/cc. including hire and operational charge of tools and plants, moulding and rehandling and stacking charge etc complete according to specification and instructions of Engineer.
65.125:Conveying 3.2 m3 (8T) tetrapods from stacking and placing in two layer according to specification and forming the armour layer of break water to lines and levels at depth of water 8m and above including hire and operational charges of tools and plants etc complete
OD8984/2024-2025:Moulding and supplying cement concrete 4 m3 (10T) tetrapod with graded aggregate of 40% 75mm to 40mm, 30% 40 to 20mm, 30% 20 to 5 mm using 380 kg cement /m3 of concrete as per approved mix design of mix proportion 0.5:1:1.46:3.22 by weight of water, cement, fine aggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively and the cement shall be 43 grade or higher) minimum cube strength requirement (i) @ 7 day - 20N/mm2 (ii) @ 28 day - 30N/mm2 and minimum density of concrete 2.5g/cc. including hire and operational charge of tools and plants, moulding and rehandling and stacking charge etc complete according to specification and instructions of Engineer.
OD8985/2024-2025:Conveying 4 m3 (10T) tetrapods from stacking and placing in two layer according to specification and forming the armour layer of break water to lines and levels at depth of water 8m and above including hire and operational charges of tools and plants etc complete
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Road on break water
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
Replenishment of existing break water
OD9331/2024-2025:Hire and running charges of long boom excavator with orange peel grab for rehandling tetrapod and stones
RAMALINGAM CONSTRUCTION COMPANY PVT LTD (BID ID -2138260)
T.M.CONSTRUCTIONS (BID ID -2149282)
GEOMETRY CONSTRUCTION COMPANY (BID ID -2137014)
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY (BID ID -2150239)
EMJAY CONSTRUCTIONS (BID ID -2135853)
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
T.M.CONSTRUCTIONS
RAMALINGAM CONSTRUCTION COMPANY PVT LTD
pkmco constructions pvt ltd
GEOMETRY CONSTRUCTION COMPANY
EMJAY CONSTRUCTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf