Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.4 LAccepted-AOC 101 VRAJ APARTMENT OPP POLICE HEAD QUARTER SARU SECTION ROAD JAMNAGAR 361008 | JAMNAGAR | JAMNAGAR | GUJARAT | 361008 | L1 | Accepted-AOC Lowest Bid | |
| 2 | L2₹34.9 L+₹1.5 L (4.39%)Rejected-Finance | L2 | Rejected-Finance Not the lowest bid | |
| 3 | L3₹35.5 L+₹2.1 L (6.30%)Rejected-Finance PLOT NO 626 627 GIDC BEHIND GANGOTRI DIARY PORBANDAR 360 577 | PORBANDAR | GUJARAT | 360577 | L3 | Rejected-Finance Not the lowest bid | |
| 4 | L4₹35.7 L+₹2.3 L (6.99%)Rejected-Finance 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | L4 | Rejected-Finance Not the lowest bid | |
| 5 | L5₹35.8 L+₹2.4 L (7.19%)Rejected-Finance 108 MARUTI COMPLEX NEAR DIGVIJAY TIN FACTORY MILE STONE BUILDING KV ROAD JAMNAGAR 361001 | JAMNAGAR | JAMNAGAR | GUJARAT | 361001 | L5 | Rejected-Finance Not the lowest bid |
Tender Value
₹34.8 L
EMD Value
₹69,560
Closing Date
21 Sept 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE JAMNAGAR
CWE JAMNAGAR AIR FORCE STATION JAMNAGAR
REPAIR / MAINTENANCE OF 66 KVA MRS AND HT CABLES AND CONNECTED WORKS AT AF STATION JAMNAGAR UNDER GE (AF) No 1 JAMNAGAR
2021_MES_472369_1
81109/E8
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Jamnagar
Class D and above and category b (ii)
7 documents required · 7 mandatory
₹500
GE AF Jamngar No 1
₹69,560
Yes
14 Oct 2021
2 Sept 2021
23 Sept 2021
2 Sept 2021
21 Sept 2021
16 Sept 2021
4 Sept 2021 - 11 Sept 2021
60 days
Amount
Dehydration / filtration of transformer oil of transformers, OCBs, PT's, oil switches, Ring main Tee unit , Stabilizers etc of various capacities installed at different locations by disconnecting plants electrically for recirculation existing transformer oil with trolley mounted filtration plant till dielectric strength not less than 50 KV. Note- Quoted rates shall be deemed to include for following :- (i) Oil shall be tested after filtration and test result will be recorded before & after filtration of oil. (ii) Contractor should make his own arrangement for oil filtration plant including transportation complete. (iii) New Transformer oil for topping up will be measured and paid in relevant item as required (iv) All necessary T&P / testing equipment shall be provided by the contractor at his own cost. No extra payment shall be made to the contractor.
Supply & topping up of transformer oil up to required level for transformer / PT's / stabilizers / HT switches etc of duly filtered with filtration plant to obtain high dielectric strength 50 KV & above all as per IS specification. (Note : Transformer oil shall be supplied in sealed barrels with test certificate. Cost of barrel shall be deemed to be included in the unit rate quoted by the contractor and empty barrel will be the property of the Department and same shall be deposited to the AGE E/M Store Yard. Nothing extra shall be paid on this account )
Supply and fix in repair breather with silica gel for transformer of capacity from 5000 KVA.
Cutting, trimming and prunning of trees/tree branches/creepers/climbers of all around existing 66/11KV Sub Stn area up to fencing/boundry wall including cleaning the disturbed area beneath and removing the tree branches and debris from site and depositing complete all as specified and directed by Engineer-in-Charge. (Note:- (i) Each sub stn will be maintained once in a month as directed by JE/AGE as per rquirement.)
Supply and spreading 40 mm graded stone aggregate on ground of sub station, average spreading levelling complete all as specified and directed by Engg-in-Charge. (Note: Measurement shall be carried out for nit finished area of work executed.)
M&L for heat shrinkable jointing kit indoor type suitable for 11 KV, along with complette accessories suitabhle for XLPE armoured aluminium cable of 95/120 sqmm 3 core complete all as specified and as directed.
M&L for heat shrinkable jointing kit outdoor type suitable for 11 KV, along with complette accessories suitabhle for XLPE armoured aluminium cable of 95/120 sqmm 3 core complete all as specified and as directed.
M&L for heat shrinkable jointing kit straight through type suitable for 11 KV, along with complette accessories suitabhle for XLPE armoured aluminium cable of 95/120 sqmm 3 core complete all as specified and as directed.
Supply, laying, jointing and testing XLPE insulated, PVC inner sheathed, armoured with galvanised steel strip or wire, heavy duty, HT underground cable ISI marked with aluminium multistranded conductor 11000 volt grade of size 95 Sqmm 3 core laid in trenches / duct passing through pipe / duct or fixed on pole and connecting complete all as specified and as directed. (Note :- Sand cushioning, cable protection cover, GI pipe and excavation & earth work shall be measured & paid for separately.)
Deployment of manpower and cable fault locator machine duly mounted on vehicle for detection of HT UG cable fault of any size & make applying upto 15 KV supply to locate the fault and any necessary arrangements required contractor should be provided Note: HT cable fault not detected payment not to be paid.
Taking out / taking down carefully old serviceable / unserviceable HT underground cable from trenches / pole etc, aluminium conductor of size 95 sqmm 3 core complete all as specified and as directed.
Laying only old taking down serviceable HT underground cable from trenches / pole etc, aluminium conductor of size 95 sqmm 3 core all as specified and directed.
Excavation in trenches not exc 1.5 m wide and n.exc 1.5 m in depth for foundation / fixing of pole / laying of cable and pipe line etc or for man hole etc not exc 10 sqm on plan and getting out in soft / loose soil all as specified.
Excavation in trenches not exc 1.5 m wide and n.exc 1.5 m in depth for foundation / fixing of pole / laying of cable and pipe line etc or for man hole etc not exc 10 sqm on plan and getting out in Hard/Rock/Rcc/Pcc/interlocking tiles soil complete all as specified and as directed. .
Returning filling in including spreading levelling, watering and well ramming in layers not exc 25 cm thick using excavated soil complete all as specified and as directed.
Removing excavated soil to a distance n.exc 50 m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and as directed. .
M&L for providing dry river sand as in sand cushioning below and above cable thickness as specified in SSR to under ground cable including punning down of sand in layer complete all as specified and as directed. (Note: for measurement purpose punned thickness of sand will be considered.)
Taking out old PCC cable cover of any type / any size from trenches all as specified and directed.
Laying only serviceable PCC cable cover for HT / LT UG cable of any description retrieved from item No 18, complete all as specified and directed by Engr-in-Charge.
Supply & laying ISI marked & conforming to IS - 5820 - 1970 unreinforced precast concrete cable cover Class HV ,type-1 flat of size 300 mm X 180 mm X 40 mm in trenches as protection to HT UG cable all as specified and directed by Engr-in-Charge
Supply and laying in repair GI tubing 100 mm dia bore light grade laid in trenches / floor / fixing on pole / wall for cable protection with necessary fittings etc including taking down old tubing complete all as specified and directed.
M&L for Boring under roads / pavement / hard standing without disturbing the top surface by trench less technology using ultra sound technique and necessary machine including supply & inserting HDPE pipe of 150 mm dia suitable for 0.4 mpa working pressure for passing through the cables complete all as specified and as directed. (Note : Necessary infrastructure required for boring shall be arranged by the Contractor at his own cost.)
M&L for Repair/Maintenance of HT VCB 11 KV by cleaning the VCB by using air blower, tightening of connection/controls, checking of all fuses, sealing of VCB at bottom, repairing of VCB at bottom, reparing of mechanical parts, oiling/greasing of all mooving -parts and carrying out following checks for smooth functioning complete all as specified and directed at site.
(a) Visual Inspection Checking.
(b) Checking of funtional locks, interlocks, signaling devices and auxiliary devices.
(c) Checking of suitablility and correct operations of protections, control instruments and electrical connection of the circuit breaker operating mechanism.
(d) Checking of Tripping Mechanism operation.
(e) Checking Spring Charging Limit Switch Operation.
(f) Checking with Standard voltage on the auxiliary circuit.
(g) Checking of with Standard voltage at potential transformer.
(h) Checking of Breaker ON/OFF operation manually and electrically.
(j) Testing of vacuum Bottle integrity.
(k) Relay testing.
(l) Checking of the resistance of the main circuit.
(m) Verification of wiring. (Note: (i) Any spare Parts if found unserviceable will be measured & paid separately as supply only unserviceable parts shall be property of contractor as per credit schedule.)
Supply only CT 75 to 150 +5-5 as per required existing size of VCB.
Supply only CT 150 to 300 +5-5 as per required existing size of VCB.
Supply only Indication lamp for VCB panels(red/green/white/blue).
Supply only auxiliary switch for VCB.
Supply only Tripping coil for VCB.
Supply only Closing coil for VCB.
Supply only Vaccum bottle.
Supply only Limit switch.
Supply only Spring charging motor.
Supply only 11KV ,1 AMP , AVT type Fuse.
Supply only Jha contact.
Note for above Srl Item No 1,2, 3 & 23 :- (i) Work shall be executed by the authorised service mechanic/Electrician of manufacturer,After satisfactorily completion of servicing of HT Transformer/VCB If any fault occurs upto the completion of contract should be attended by concerned rep within stripulated time frame without fail , quoted rates is deemed to be included all such charges.(ii) If any above HT Equipment and connected items become breakdown, the contractor shall loacate the problem/fault at site within 12 hours on intimation by JE/Engineer-In-Charge and ensure that the fault to be rectified within 48 Hours , failing which an amount of Rs 200 /- per hour will be recovered as a penal recovery from any payment due to contractor after expiry of 48 hours.) (iii) Minor consumable items, ie Nuts bolts, Control wires , PVC tapes, Welding Job, cotton waste & cleaning clothes, petroleum jelly, grease , lubricating oil, emery paper , T & P items etc, is to be arranged by contracttor without any extra cost.
Sukhi Electricals
K K Construction Co
ALBA AC AND REF SERVICES
Rameshwar Enterprise
Parth Infrastructure Pvt. Ltd.
vijay infraprojects pvt ltd
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .