| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹28.7 LAccepted-AOC | L-1 | Accepted-AOC LOW RATE | |
| 2 | L-2₹29.8 L+₹1.1 L (3.78%)Rejected-Finance | L-2 | Rejected-Finance HIGH RATE | |
| 3 | L-3₹30.3 L+₹1.6 L (5.56%)Rejected-Finance | L-3 | Rejected-Finance HIGH RATE | |
| 4 | L-4₹33.9 L+₹5.2 L (18.0%)Rejected-Finance Q NO 121 SHANTI NAGAR RAJNAGAR COLLIERY ANUPPUR MADHYA PRADESH 484 446 | ANUPPUR | MADHYA PRADESH | 484446 | L-4 | Rejected-Finance HIGH RATE | |
| 5 | L-5₹34.8 L+₹6.1 L (21.1%)Rejected-Finance | L-5 | Rejected-Finance HIGH RATE |
| Sl No | Description | Qty | Unit | K M Rai L7 | Rajendra Singh Chawla L5 | M/S. Maa Bhadrakali Enterprises L1 | Amrendra Kumar Singh L4 | ROUSHAN ENTERPRISES L2 | MEENA ENTERPRISES L6 | VJ ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
All kinds of soil | 258.9 | cum | 154.96 ₹40,119.14 | 150 ₹38,835 | 120 ₹31,068 Lowest | 131.58 ₹34,066.06 | 130 ₹33,657 | 150 ₹38,835 | 150 ₹38,835 |
| 2.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
In cement mortar | 31.25 | cum | 1,232.8 ₹38,525 | 500 ₹15,625 | 800 ₹25,000 | 1,047.15 ₹32,723.44 | 430 ₹13,437.5 | 1,150 ₹35,937.5 | 100 ₹3,125 Lowest |
| 3.00 | Brick work with flyash brick in F&P (1:6) | 312.57 | cum | 5,001.93 ₹15,63,453.26 | 5,000 ₹15,62,850 | 3,800 ₹11,87,766 Lowest | 4,248.64 ₹13,27,997.4 | 4,250 ₹13,28,422.5 | 4,500 ₹14,06,565 | 4,000 ₹12,50,280 |
| 4.00 | Carriage of meterials by mechanical transport including loading, unloading and staking up to 1 KM | 290.15 | cum | 140.92 ₹40,887.94 | 120 ₹34,818 | 105 ₹30,465.75 | 119.7 ₹34,730.95 | 95 ₹27,564.25 Lowest | 135 ₹39,170.25 | 110 ₹31,916.5 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 88.94 | cum | 5,592.8 ₹4,97,423.63 | 4,500 ₹4,00,230 | 4,000 ₹3,55,760 | 4,750.53 ₹4,22,512.14 | 3,700 ₹3,29,078 Lowest | 5,100 ₹4,53,594 | 4,200 ₹3,73,548 |
| 6.00 | 12 mm cement plaster finished with a floating coat of neat cement of mix
1:4 (1 cement: 4 fine sand) | 1,691.2 | sqm | 288.25 ₹4,87,488.4 | 220 ₹3,72,064 | 200 ₹3,38,240 | 245.27 ₹4,14,800.62 | 190 ₹3,21,328 Lowest | 265 ₹4,48,168 | 200 ₹3,38,240 |
| 7.00 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete
40 mm thick with 20 mm nominal size stone aggregate | 377.5 | cum | 442.65 ₹1,67,100.38 | 280 ₹1,05,700 Lowest | 320 ₹1,20,800 | 375.99 ₹1,41,936.23 | 280 ₹1,05,700 Lowest | 400 ₹1,51,000 | 350 ₹1,32,125 |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 82.7 | cum | 6,620.45 ₹5,47,511.21 | 5,500 ₹4,54,850 | 4,500 ₹3,72,150 Lowest | 5,538.47 ₹4,58,031.47 | 4,900 ₹4,05,230 | 6,000 ₹4,96,200 | 5,000 ₹4,13,500 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 623.2 | sqm | 247.95 ₹1,54,522.44 | 120 ₹74,784 | 180 ₹1,12,176 | 210.61 ₹1,31,252.15 | 100 ₹62,320 Lowest | 230 ₹1,43,336 | 200 ₹1,24,640 |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level
Cold twisted bars | 4,722.26 | kg | 75.65 ₹3,57,238.97 | 70 ₹3,30,558.2 | 48 ₹2,26,668.48 Lowest | 64.26 ₹3,03,452.43 | 58 ₹2,73,891.08 | 72 ₹3,40,002.72 | 52 ₹2,45,557.52 |
Tender Value
₹47.1 L
EMD Value
₹59,000
Closing Date
20 Aug 2025, 5:00 pmClosed
ACE PB AREA
PB AREA
Up gradation of drain, RCC cover, culvert in various colonies (Sri Nagar, Shivshankar nagar, Prem nagar, A type colony, B and C type colony and Others) under PB Area
2025_BCCL_340881_1
GM/PBA/ACE/ENIT/25-26/21 DT 04.08.2025
Open Tender
Civil Works - Others
Item Rate
90 days
PB AREA
Please refer Tender documents.
4 documents required · 4 mandatory
₹59,000
10 Feb 2026
4 Aug 2025
22 Aug 2025
5 Aug 2025
20 Aug 2025
5 Aug 2025
5 Aug 2025 - 14 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .