Tender Value
₹28.8 L
EMD Value
₹29,000
Closing Date
16 Jun 2026, 6:00 pmClosed
Executive Engineer Panchayat (R&B) Division, Gir Somnath
Construction of Vented Causeway over the Karkari River on the way to Nagarchi pir dargah at Village Madhupur (Jambur) Ta. Talala, Dist. Gir Somnath.
311879
04/2026-27 Sr.No.4
Open
Civil Works - Others
Works
Gir Somnath
6 documents required · 5 mandatory · 1 optional
₹1,500
DD in favour of Executive Engineer, Panchayat R&B Division - Gir Somnath
₹29,000
5 Jun 2026
5 Jun 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
Name of Work :- Construction of Vented Causeway over the Karkari River on the way to
Nagarchi pir dargah at Village Madhupur (Jambur) Ta. Talala, Dist. Gir
Bill of Quantities
Memorandum showing items of works to be carried out
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words. quantieis.
1 0.000 Cum Earth work for embankment 82.71 Rupees One
including breaking clods, Eighty Two and Cubic
dressing with all lead and Paise Seventy metre
lift.(Excluding watering and One only
consolidation) Selected soil
From borrow area within Land
width from 1.00 km. lead
machineries.(Selected soil to be
used For earthwork shall be
From BORROW AREA only
having CBR not less than
2 0.000 Cum Rolling and Watering of earth 11.71 Rupees One
work in layers with vibratory Eleven and Paise Cubic
roller including filling in Seventy One only metre
depressions which occur during
the process as directed.
3 235.000 Cum Filling available excavated 137.47 Rupees One One
earth (excluding rock) in Hundred Thirty Cubic
trenches plinth, sides of Seven and Paise metre
foundations etc. in layers not Fourty Seven
exceeding 20 cm in depth
consolidating each disposited
layer by ramming and watering.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words. quantieis.
4 56.000 Cum WBM Grading 1 Providing, laying, 1483.60 Rupees One One
spreading and compacting stone Thousand Four Cubic
aggregates of 90 to 45mm sizes to Hundred Eighty metre
water bound macadam specification Three and Paise
including spreading in uniform
thickness, hand packing, rolling with
smooth wheel roller 80100 kN in
stages to proper grade and camber,
applying and brooming, stone
screening/binding materials to fill-up
the interstices of coarse aggregate,
watering and compacting to the
required density grading I as per
Technical Specification Clause
By Manual Means
5 298.000 Cum Excavation in large boulders 750.68 Rupees Seven One
and soft rock by welding Hundred Fifty Cubic
including shoring, strutting and and Paise Sixty metre
dewatering as necessary and Eight only
disposing of the excavated stuff
6 76.000 Cum Excavation in hard rock by dry- 902.90 Rupees Nine One
wet blasting and chiselling Hundred Two Cubic
including dewatering preparing and Paise Ninty metre
foundation base by proper only
benching and stepping and
disposing of the excavated stuff
as directed.(A) General blasting
7 67.000 Cum Providing and filling in 3554.31 Rupees Three One
foundation with ordinary Thousand Five Cubic
cement concrete M-100 mix Hundred Fifty metre
and providing necessary Four and Paise
Thirty One only
vertical pin headers incl.
Formwork, vibrating, ramming
and curing complete. All Sand
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words. quantieis.
8 349.100 Cum Providing & casting in situ 4122.57 Rupees Four One
ordinary cement concrete M- Thousand One Cubic
150 mix and providing Hundred Twenty metre
necessary pin headers including Two and Paise
shuttering, scaffolding, laying,
vibrating, curing and finishing
complete without V-Groves.
(A) Height from 0.0 M. to
M. All Sand Lead.
9 56.100 Cum Providing and casting in situ 4560.39 Rupees Four One
ordinary cement concrete M- Thousand Five Cubic
200 for average 150MM thick Hundred Sixty metre
wearing coat laid as directed and Paise Thirty
including tamping,
vibrating,finishing,curing and
filling in joints with bitumen
complete All sand lead.
10 0.300 MT Providing and laying in 73858.69 Rupees One
position FE 500/500D TMT bar Seventy Three Metric
reinforcement including Thousand Eight Ton
cutting, bending, hooking and Hundred Fifty
Eight and Paise
tying complete as per detailed
Sixty Nine only
drawings for the following.(A)
Piers (B) Abutments (C)
Returns (d) Walls etc
11 0.990 MT Providing and fixing in position 73243.01 Rupees One
FE 500/500D TMT bar Seventy Three Metric
reinforement including cutting, Thousand Two Ton
bending and tying complete as Hundred Fourty
Three and Paise
per detailed drawings. (A)
R.C.C. Kerb. (B) R.C.C.
Footpath.(C) R.C.C. Approch
slab.(D) Wearing Coat.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words. quantieis.
12 55.000 Rm Supplying and fixing 5560.00 Rupees Five One
reinforced concrete heavy Thousand Five Running
Hundred Sixty metre
duty non-pressure pipes with
collars for culverts carrying only
heavy traffic as per IS 458-
1991 specifications including
setting the pipes in C.M. 1:2
watering and laying (to level
or slopes) of class NP3 of
following internal
daimeters.I)1200mm. Dia.
13 4.000 No Providing and Fixing FLOOD 3047.17 Rupees Three One
GAUGE POST conferming to Thousand Number
IRC-67-2001 using Engineering Fourty Seven
grade retro reflective sheeting and Paise
including lettering and border
as directed for New Structure.
14 2.000 No Cautionary warning sign:-Providing & 3808.65 Rupees Three One
Fixing sign boards made out of 2mm. Thousand Eight Number
alluminium sheet size 90x90x90cms.
equilateral triangle as per design of IRC-
67-1977 Pretrated with hospheting and Paise Sixty
process & acid atching : coated with one Five only
coat of apoxy primer and two coats of best
quality epoxy paint, reflectrorised with
retro reflective sheeting as per latest
MOSTspecifications. 3.1mt. lomg stand
post & frame fabricated from suitable size
iron angle of 35x35x3 mm., 75x75x6mm.
required paited with best quality epoxy
coatings in black and white bends, the
detail of symbols for each board shall be
as per the instruction of the engineer in
charge. The fixing at site shall be in C.C.
1:2:4 block of size 5x45x60 cms for each
leg, incl. xcavation,curing etc. comp.under
the supervision of Engineer - in charge.
(A) Engineer grade.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words. quantieis.
15 1.000 No Citizen' s information Board- Providing and 8574.90 Rupees Eight One
fixing of typical MMGSY information board as
per instruction. Two M.S. sheets of 3 mm thick, Thousand Five Number
of 900 mm x 750mm size fixed at top & bottom Hundred Seventy
duly rivetted with MS angles of 25 x 25 x 5 mm Four and Paise
thick M.S angle shall be welded by two vertical
M.S angle of 5 mm thick to 75 mm x 75 mm of Ninty only
12 SWG square tubes posts duly embedded in
cement concrete M-15 grade blocks of 600mm x
600mm x 750mm, below ground level. The
letters & figure of any shade reflectorised with
High Intensity Prismatic Grade Retro Reflective
Sheeting of Type-4 as per ASTM D-4956 and
latest MORD specifications; All sections of
framed posts and steel tube will be painted with
primer and two coats of epoxy paints as per
drawing Clause 1701 and Annexure
(10.16). (A) Class-B High intensity Grade Retro
Reflective sheeting
16 2.000 No Hazard Marker Sign :-Providing and fixing sing 2423.73 Rupees Two One
boards made out of 2mm aluminium sheet; size
90 x 30cms. rectangle as as per the Thousand Four Number
design/drawing attached (IRC) pretreated with Hundred Twenty
phospheting process & acid etching; coated with Three and Paise
one coat of epoxy primer and two coats of best
quality epoxy paint; reflectorised with retro Seventy Three
refiective sheeting as per latest M.O.S.T. only
Specifications; 3.1m long stand post and frame
fabricated from suitable size iron angle of 35 x
35 x 3mm & 50 x 50 x 5mm painted with best
quality epoxy coatings The fixing at site shall be
in 1:2:4 CC block of size 45x45x 60cms. for
each leg. including excavation curing etc.
complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)...
17 13.500 Rm Removing all types of Hume 295.17 Rupees Two One
pipes and stacking within a lead Hundred Ninty Running
of 1000 m including Earthwork Five and Paise metre
and Dismantling of Masonry Seventeen only
Works as per Technical
Specification Clause
(A)Upto 600 mm dia Hume
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words. quantieis.
18 63.000 Cum Dismentaling the existing 974.66 Rupees Nine One
structure including removing Hundred Seventy Cubic
and stacking the dismentelled Four and Paise metre
materials as and where Sixty Six only
directed. (A) R.C.C. work
19 67.000 No Providing and fixing guard 106.39 Rupees One One
stone as per I.R.C. type design Hundred Six and Number
including white washing etc. Paise Thirty Nine
complete.(i) Fixing in Earth only
20 6.000 Sqm Providing and laying polished 1019.39 Rupees One One
Kota stone slab flooring over Thousand Squere
20mm (Average) thick base of Ninteen and metre
cement mortar 1:6 (1-cement : Paise Thirty Nine
6-coarse sand) or L.M. 1.1.5 (1-
Lime putty :1.5 - coarse sand)
laid over and jointed with grey
cement slurry mixed with
pigment to match the shade of
slab including rubbing and
polishing etc. complete. (A)
25mm thick (more than 10 ton)
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but may according to
be more or less. estimated
In Figure In Words. quantieis.
21 24.000 Rm Providing and fixing post and 1214.67 Rupees One One
pipe railing as per detailed Thousand Two Running
drawing including 3 coats of Hundred metre
painting to steel works Fourteen and
Paise Sixty Seven
Dismentled Material Credit Rs.
will be deducted from 1 St R.A. Bill
Rupees Twenty Eight Lakh Eighty Two Thousand Three Hundred Fifty Seven and Paise Thirty Nine only
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow
percent ( Should be written in figures and words ) of the estimated rate mentioned above.
Amount of My \ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Note: Dismentled Material Credit Rs. 8933.00 will be deducted from 1 St R.A. Bill
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Veraval Gir Somnath
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular All.zip
ZIP
Genaral Condition.pdf
Schedule B VCW Karkari.pdf
SBD VCW Karkari River Nagarchi pir dargah.pdf
Speci.pdf
8 cement.pdf
6 Qty Sheet.pdf
3 Test.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .