Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC 3 304 NEAR TOLL PLAZA SOWMIA NAGAR SOWMIA NAGAR INAAM SAMAYAPURAM MANNACHANALLUR TALUK TIRUCHIRAPPALLI TIRUCHIRAPPALLI TAMIL NADU 621112 UDYAM TN 27 0027452 | TIRUCHIRAPPALLI | TAMIL NADU | 621112 | ₹2.2 Cr | L1 | Accepted-AOC LESS RATE |
| 2 | L2₹2.2 CrRejected-Finance | ₹2.2 Cr | L2 | Rejected-Finance MORE RATE |
| Sl No | Description | Qty | Unit | PSG AND CO H2 | S PERIASAMY H1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 1,394 | One Cubic Metre | 173 ₹2,41,162 Lowest | 175 ₹2,43,950 |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 142 | One Cubic Metre | 406 ₹57,652 Lowest | 410 ₹58,220 |
| 3.00 | Cement Concrete M 7.5 --1:4:8 (one Cement Four M.Sand and Eight Aggregate) for Using 40mm HBG for foundation curing etc., complete complying with std.spe and as directed by the dept.officers | 142 | One Cubic Metre | 5,514 ₹7,82,988 Lowest | 5,515 ₹7,83,130 |
| 4.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 704 | One Quintal | 9,475 ₹66,70,400 Lowest | 9,480 ₹66,73,920 |
| 5.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for RETAINING SIDE WALL | 1,153 | One Cubic Metre | 12,080 ₹1,39,28,240 Lowest | 12,100 ₹1,39,51,300 |
Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
19 Jan 2026, 3:00 pmClosed
The Commissioner, Tiruchirappalli City Corporation
Bharathidasan Road, Cantonment, Trichy - 620 001
Construction of Strom water channal Retaining Wall at SS Nagar Channal From SS Nagar to Oyamari Madhura Garden Channal (From Sanjeevi Nagar Park Road to Nehru Street-ReachI in Ward No 15.
2026_MAWS_641984_1
E8/14601/2025 SR NO.2
Open Tender
Civil Works
Lump-sum
60 days
WARD 15
AS PER TENDER CONDITION
3 documents required · 3 mandatory
₹10,000
₹2.6 L
Main office, Tiruchirappalli City Corporation
8 Jul 2026
10 Jan 2026
19 Jan 2026
10 Jan 2026
19 Jan 2026
12 Jan 2026
12 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Supplying and filling in foundation and basement with Crushed Stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Cement Concrete M 7.5 --1:4:8 (one Cement Four M.Sand and Eight Aggregate) for Using 40mm HBG for foundation curing etc., complete complying with std.spe and as directed by the dept.officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for RETAINING SIDE WALL
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BidDoc262.pdf
Tender Documents • 0.62 MB
BOQ_768934.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].