| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 LAccepted-AOC | ₹7.8 L Quoted ₹9.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹9.9 LRejected-Finance GOVT ELECTRICAL CONTRACTOR C VILLAGE HAT PO BAJAURA TEHSIL BHUNTAR DISTRICT KULLU HP 175125 | KULLU | HIMACHAL PRADESH | 175125 | ₹9.9 L | 2 | Rejected-Finance L2 |
| 3 | 3₹10.2 LRejected-Finance | ₹10.2 L | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | VINOD KUMAR L2 | Lehnu Ram L1 | Jitender Singh L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Jablyana 1st, 2nd, 3rd phase whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 9,90,000 ₹9.9 L | 9,44,880 ₹9.4 L | 10,20,000 ₹10.2 L |
| 2.00Description of main components of the scheme is as under:- | ||||||
| 2.01Civil works: 4 Nos pump house, Rising main: Booster stage 1st phase 80mm dia =220 Rmt, 1st phase 100mmdia 1110 Rmt, Booster stage 2nd phase 80mm dia 25 Rmt, 2nd phase 80mm dia 1785Rmt, Booster stage 3rd phase 80mm dia 90 Rmt 3rd phase 80mm dia 1530 Rmt, 4th phase 40mmdia 890 Rmt. Pumping machinery:Booster stage 1st phase submerisbhle pump 2x7.50=15 HP, 1st phase 2x30=60 HP, Booster stage 2nd phase submersible pump 2x3=6 HP, 2nd phase 2x30=60 HP, Booster stage 3rd phase submersible pump 2x5=10 HP, 3rd phase 2x50=100 HP, 4th phase submersibhle pump 2x=6 HP. Distribution system: No of storage tanks: 4 Nos main storage tank & 10 Nos sub storage tank, Total working hours: 30 through , 5 Nos persons. Indicators to be mentioned:Average per day 9 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (180000 Litr). Pumping hours per day (12) and energy consumptoin per day 850 Unit. | ||||||
Tender Value
₹8.0 L
EMD Value
₹15,910
Closing Date
4 Oct 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Jablyana 1st 2nd 3rd phase Tehsil Ghumariwn District Bilaspur (SH Operation of pumping machinery and distribution system of water supply from Sector storage tank to different habitation for one year).
2025_HPIPH_115544_1
BLP-BLP-0736-NIT No. 7999-8098 Dated 22/05/2025
Open Tender
Civil Works
365 days
Sub Division Kandrour Section Harlog
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹15,910
1 Apr 2026
24 Sept 2025
4 Oct 2025
24 Sept 2025
4 Oct 2025
24 Sept 2025
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Jablyana 1st, 2nd, 3rd phase whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 4 Nos pump house, Rising main: Booster stage 1st phase 80mm dia =220 Rmt, 1st phase 100mmdia 1110 Rmt, Booster stage 2nd phase 80mm dia 25 Rmt, 2nd phase 80mm dia 1785Rmt, Booster stage 3rd phase 80mm dia 90 Rmt 3rd phase 80mm dia 1530 Rmt, 4th phase 40mmdia 890 Rmt. Pumping machinery:Booster stage 1st phase submerisbhle pump 2x7.50=15 HP, 1st phase 2x30=60 HP, Booster stage 2nd phase submersible pump 2x3=6 HP, 2nd phase 2x30=60 HP, Booster stage 3rd phase submersible pump 2x5=10 HP, 3rd phase 2x50=100 HP, 4th phase submersibhle pump 2x=6 HP. Distribution system: No of storage tanks: 4 Nos main storage tank & 10 Nos sub storage tank, Total working hours: 30 through , 5 Nos persons. Indicators to be mentioned:Average per day 9 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (180000 Litr). Pumping hours per day (12) and energy consumptoin per day 850 Unit.
VINOD KUMAR (BID ID -561190)
Jitender Singh (BID ID -561175)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Termsandconditions.pdf
Tender Documents • 0.35 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.43 MB
BOQ_168619.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid