Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹28.0 L+₹19,500 (0.70%)Rejected-Finance D NO 35 14 13 1 RP PETA GAVARA KANCHARAPALEM VISAKHAPATNAM 530008 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530008 | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹28.7 L+₹92,880 (3.34%)Rejected-Finance D NO 65 6 500 2 MULAGADA COLONY HIMACHALNAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹29.0 L+₹1.2 L (4.17%)Rejected-Finance | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹33.2 L+₹5.3 L (19.2%)Rejected-Finance SITE NO 29 30 1ST CROSS NAGAPPA REDDY LAYOUT KAGGADASAPURA CV RAMAN NAGAR PO BANGALORE 560 093 | BANGALORE | BANGALORE | KARNATAKA | 560093 | L5 | Rejected-Finance Being not L1 |
Tender Value
₹48.5 L
EMD Value
₹97,000
Closing Date
25 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer Utility-I
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
CERTAIN REPAIR / MAINTENANCE OF AC PLANTS AT INS DEGA AREA UNDER AGE E/M NO-II OF GE(U-I), VISAKHAPATNAM
2021_MES_488261_1
8367/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
CLASS D
8 documents required · 8 mandatory
₹500
Garrison Engineer Utility-I
₹97,000
Yes
2 Feb 2022
15 Nov 2021
27 Dec 2021
15 Nov 2021
25 Dec 2021
29 Nov 2021
60 days
Amount
M&L for carry out the descaling of shells and tubes water cooled type condenser by disconnecting the inlet and out water connections and providing of dummy to the inlet and outlet and descaling the condenser by circulating the circulated descaling agent R-111 or equivalent chemical or organic compound at the proper ratio circulated chemical till remove complete scale deposite inside the copper tubes, and opening the both end cover by the condenser brushing the copper tubes with appropriate size nylon brush remove complete scale and flushing and boxing up the both end covers connecting up the water inlet & outlet connections including renewal by damaged rubber gas kets and leak testing the joints for water leakage for the capacity of 12.5 TR and of make : Voltas , shell and tube condensers all as directed by Engineer-in-charge.
M&l for carry out leak test for the chiller type system by extracting the existing available gas from the system to separate cylinder storing and pressure testing the complete system with dry nitrogen and check the leaks , identifying the leaks, rectification of leaks by brazzing/ weilding at the leak points/replacing by damaged valve gland package/ gas ket etc, and after rectification of all the leaks pressure testing the complete system up to 300 PSIG at high side , 200 PSIG at low side of the system, holding the pressure for 24 hrs and vaccumising the complete system after releasing the dry nitrogen and charging the refrigerent gas to system and testing & comissioning the plant checking all controls for the capacity of 12.5 TR and of make : Voltas/ Blue star , shell and condensers all as directed by Engineer-in-charge.
M&L for complete servicing/ repairs to package Air conditioning unit of Make: M/S Voltas of capacity 5.5 TR compressor units, with and including servicing of three Nos outdoor units complete by blowing out the dust, spraying the organic based scale removing agent at the appropriate ratio to the condenser fan area, till removal of complete scales and dust, flushing through for proper air flow across the coil, checking of all electrical connections, greasing of motor bearing, renewal of all defective copper tubes from indoor unit to outdoor unit, replacement of corroded sheet metal screws, applying synthetic enamal paint over a coat of primer on the rusted portion, reassembling the sheet metal parts and testing the unit all as specified and as directed by the Engineer-in-charge. Note; Required copper pipe shall be measured and paid under relevant Sch "A" items.
M&L for complete servicing/ repairs to Air cooled central air conditioning unit of Make: M/s voltas of capacity 3 x12.5 TR consisting of three Nos 12.5 TR compressor units, with and including servicing of three Nos outdoor units( Each will be measured as one unit) complete by blowing out the dust spraying the organic based scale removing agent at the appropriate ratio to the condenser fin area , till removal of complete scales & dust , flushing through for proper air flow across the coil, checking of all electrical connections , greasing of motor bearing, renewal of all defective copper tubes from indoor unit to out door unit, replacement of corroded sheet metal scews, applying synthetic enamal paint over a coat of primer on the rusted portion, reassembling the sheet metal parts and testing the unit as specified and as directed by the Engineer-in-charge. Note; Required copper shall be measured and paid under relevant Sch "A" items.
Supply and charge refrigerant gas R-22 / R 407 C incuding leak testing the system, arresting the leaks with necessary materials like gasket/ 'o' rings/ washers all as directed by Engineer-in-charge. Make : Mafron/ Freon/ Floron
M&L for complete leak testing the in door and out door units , complete refrigerant pipe with nitrogen gas, locating the leaks, rectify the leak by brazing/ weilding and pressure tetsing the complete system for the capacity up to 5.8 TR air cooled package Ac system all as specified and as directed by engineer-in-charge.
Carrying out repairs and Maintenance , attending to breakdown of 5.5 TR to 25 TR capacity package type, chiller type plant, water cooled and air cooled AC plant as per the following scope of the work given below including carrying out general repairs/ servicing to ensure smooth and trouble free operation of plants to the entire satisfaction of users/department all as directed by Engineer-in-charge.
Scope of Work : (a) Periodical monitoring / Inspecting the complete AC plant and carrying out preventive and periodical maintenance to ensure smooth functioning of AC plant.The periodical inspection for preventive maintenance shall be carried out by technician/service engineer of OEM once in a quarter other than breakdown calls for monitoring the operational condition of AC plant including for preventive maintenance/breakdown calls whenever required. Each preventive maintenance & breakdown call during three months will be measured as one Job
(b) Visual inspection for oil traces, Air heat exchanger (condenser) cleaning, check for removed protection devices, and improperly closed doors/ covers, check that the temperature difference between the heat exchange inlet and outlet is correct, check the refrigeration system, motors and starters for performance and healthy condition of plant.
(c) Checking the system for leaks and rectification of leaks if any.
(d) Taking a set of readings and evaluating the same to ensure the satisfactory performance of the plant.
(e) Checking the refrigeration control system for operation and adjusting the settings as and when required.
(f) General Cleaning the evaporator and condensing coils
(g) General Lubrication of the bearings of motors, pumps and fans as and when required.
(h) Inspection of belts, which includes adjusting the tension including replacment if required.
(j) Filling only the refrigerant as a result of leak arising from the system due to standard wear and tear.
(k) Repairing/ replacing the components of the equipment at site or at workshop as required
(l) To check proper functioning of microprocessor and take control test.
(m) Intimating any breakdown requiring specific major repairs/overhauling to the contractor/ department for immediate rectification of defect.
(n) Attending the complaints/ breakdown whenever received by user /JE /Engineer in charge and attending the complaint for same within 24 hrs of receipt.
(o) The repair/replacement of all spare parts like ICVC Boards, compressor / fan motor rewinding, electrical switch gears, contactors, PCB, refrigerant gas etc., are not covered in the scope which shall be measured and paid separately under relevant items.
(p) Any minor spares/ repairs items which are required to keep the plant in operational are deemed to be included in scope.
Supply and fixing the following spares for carrying out repairs to package air conditioning unit of M/s Voltas/ M/s blue star/ M/s Carrier.
Sealed compressor of capacity 5.5 TR Make: Dafoss/ Copeland
Sealed compressor of capacity 11.6/ 12 TR Make: Dafoss/ Copeland
Fan blade suitable for above model package unit
Fan motor suitable for above model package unit
Drier assly complete suitable for above model package unit
Compressor oil suitable for scroll type hermaticaly sealed type compressor of Make : Dafoss/ Copeland. Make of oil : P-180 or equivalent.
Chillar flow switch with connection pipe
Pressure guage 0-7 kg/cm2
MNX 25 contactor 220 V ,50Hz,
MNX 40 contactor 220 V ,50Hz,
MNX 12 contactor 220 V, 50Hz
MNX relay 9-14 AMPS
Timer Star/ delta
Auxillary block
Taking down the worn out V belts of the AHU drive sets by opening of the drive motor foudation bolts , and S & F of new V belts of the folowing size and type and matching the proper alingment and testing .
V belt section A- 28
V belt Section A- 31
V belt section A-35.
V belts section B- 54
M/L for taking down the corrorded and unserviceable butterfly valves and its counter flanges, nut and bolts from the exisiting position and S/F butterfly valve of 80 mm dia with counter flanges, nut and bolts etc including welding and testing the leaks complete all as specified and directed.
M/L for taking down the burned condenser/ indoor/ outdoor unit fan motor and carrying out rewinding/including renewal of bearings/bushes of the motor and fixing back to the position and testing and commissioning the unit of package type unit of capacity upto 12TR
M/L for taking down the burned condenser/ indoor/ outdoor unit fan blade and supply and fix new fan blade for the unit of packaged unit of capacity upto 12TR
M/L for taking down the damaged referigant copper pipe and S/F new copper pipe of L type including necessary elbows/sockets/tee brackets/ clamps and bracing for the following size for air cooled package units of the following
1/2 inch copper pipe
5/8 inch copper pipe
3/4 inch copper pipe
7/8 inch copper pipe
S/F insulation foam of tubular type for refrigeration pipe which run indoor-to-outdoor with necessary adhesive tapes for the following size
1/2 inch copper pipe
5/8 inch copper pipe
3/4 inch copper pipe
7/8 inch copper pipe
M/L for taking down the blower assembly of package type AC plant and taking out the damaged/worn out AHU shaft assembly and bearings and transporting to workshop to carry out the repair/replacement of the AHU shaft, replacement of pillar block bearing units and transporting back to site and installing into the position, matching of proper alignment and testing and commissioning of blower unit of capacity 5.5TR/8.6TR
M&L for carry out the descaling of shells and tubes water cooled type condenser by disconnecting the inlet and out water connections and providing of dummy to the inlet and outlet and descaling the condenser by circulating the circulated descaling agent R-111 or equivalent chemical or organic compound at the proper ratio circulated chemical till remove complete scale deposite inside the copper tubes, and opening the both end cover by the condenser brushing the copper tubes with appropriate size nylon brush remove complete scale and flushing and boxing up the both end covers connecting up the water inlet & outlet connections including renewal by damaged rubber gas kets and leak testing the joints for water leakage for the capacity of 80 TR and of make : Voltas/ Blue star , shell and tube condensers all as directed by Engineer-in-charge.
M&l for carry out leak test for the chiller type system by extracting the existing available gas from the system to separate cylinder storing and pressure testing the complete system with dry nitrogen and check the leaks , identifying the leaks, rectification of leaks by brazzing/ weilding at the leak points/replacing by damaged valve gland package/ gas ket etc, and after rectification of all the leaks pressure testing the complete system up to 300 PSIG at high side , 200 PSIG at low side of the system, holding the pressure for 24 hrs and vaccumising the complete system after releasing the dry nitrogen and charging the refrigerent gas to system and testing & comissioning the plant checking all controls for the capacity of 80 TR and of make : Voltas/ Blue star , shell and condensers all as directed by Engineer-in-charge.
M&L for carry out the descaling of shells and tubes water cooled type condenser by disconnecting the inlet and out water connections and providing of dummy to the inlet and outlet and descaling the condenser by circulating the circulated descaling agent R-111 or equivalent chemical or organic compound at the proper ratio circulated chemical till remove complete scale deposite inside the copper tubes, and opening the both end cover by the condenser brushing the copper tubes with appropriate size nylon brush remove complete scale and flushing and boxing up the both end covers connecting up the water inlet & outlet connections including renewal by damaged rubber gas kets and leak testing the joints for water leakage for the capacity of 80 to 150 TR and of make : Voltas/ Blue star , shell and tube condensers all as directed by Engineer-in-charge.
M&l for carry out leak test for the chiller type system by extracting the existing available gas from the system to separate cylinder storing and pressure testing the complete system with dry nitrogen and check the leaks , identifying the leaks, rectification of leaks by brazzing/ weilding at the leak points/replacing by damaged valve gland package/ gas ket etc, and after rectification of all the leaks pressure testing the complete system up to 300 PSIG at high side , 200 PSIG at low side of the system, holding the pressure for 24 hrs and vaccumising the complete system after releasing the dry nitrogen and charging the refrigerent gas to system and testing & comissioning the plant checking all controls for the capacity of 80 to150 TR and of make : Voltas/ Blue star , shell and condensers all as directed by Engineer-in-charge.
Supply only refrigerant gas 134 A for charging all as directed Make : Mafron/ Freon/ Floron
M&L for dismantling the defective induction motor of following capapcity of any make 415 V, 4 pole up to 1440 RPM, 50Hz of any duty or any class of insulation from the bed duly coupled with pump / compressor /in AHU, transporting to work shop, removing burnt out winding from stator / motor, rewinding with suitable guage of super enamelled copper wire of approved make and replacing drive end and non drive end bearings , insulation materials, varnishing, heating reassembling, tetsing and commissioning for the following capacities all as directed.
Above 7.5 and up to 12.5 HP
M&L for taking down the defective fan motor of flange mounted extended type shaft upto 3 HP, 3 phase, 415 volts, 6 pole, 900 RPM, 50Hz,along with fan assembly and dismantling the motor complete cleaning with CTC, including rewinding the motor with appropriate guaue copper wire, necessary paper, tape, terminal etc., insulation shall be of class 'F' and degree of protection shall be IP-55, the work includes renewal of all corroded bolts & nuts, terminal block and assembling, fixing in position, fixing of fan blade and alignment of the fan blade for the suitable air throw of the cooling tower , testing & commissioning the cooling tower motor, all as specified and as directed by the Engineer-in-charge.
Carrying out repairs and Maintenance , attending to breakdown of 80 to 150 TR variable speed screw type liquid chiller central AC plant of Make : voltas as per the following scope of the work given below including carrying out general repairs/ servicing to ensure smooth and trouble free operation of plants to the entire satisfaction of users/department all as directed by Engineer-in-charge.
Scope of Work : (a) Periodical monitoring / Inspecting the complete ac plant and carrying out preventive/ periodical maintenance to ensure smooth functioning of AC plant.The periodical inspection for preventive maintenance shall be carried out by technician/service engineer of OEM once in a quarter other than breakdown calls for monitoring the operational condition of AC plant including for preventive maintenance/breakdown calls whenever required. Each preventive maintenance & breakdown call during three months will be measured as one Job.
(b) Visual inspection for oil traces, Air heat exchanger (condenser) cleaning, check for removed protection devices, and improperly closed doors/ covers, check that the temperature difference between the heat exchange inlet and outlet is correct, check the refrigeration system, motors and starters for performance and healthy condition of plant.
(c) Checking the system for leaks and rectification of leaks if any.
(d) Taking a set of readings and evaluating the same to ensure the satisfactory performance of the plant.
(e) Checking the refrigeration control system for operation and adjusting the settings as and when required.
(f) General Cleaning the evaporator and condensing coils
(g) General Lubrication of the bearings of motors, pumps and fans as and when required.
(h) Inspection of belts, which includes adjusting the tension including replacment if required.
(j) Filling only the refrigerant as a result of leak arising from the system due to standard wear and tear.
(k) Repairing/ replacing the components of the equipment at site or at workshop as required
(l) To check proper functioning of microprocessor and take control test.
(m) Intimating any breakdown requiring specific major repairs/overhauling to the contractor/ department for immediate rectification of defect.
(n) Attending the complaints/ breakdown whenever received by user /JE /Engineer in charge and attending the complaint for same within 24 hrs of receipt.
(o) The repair/replacement of all spare parts like ICVC Boards, compressor / fan motor rewinding, electrical switch gears, contactors, PCB, refrigerant gas etc., are not in the scope. These items shall be measured and paid separately under relevant items.
(p) Any minor spares/ repairs items which are required to keep the plant in operational are deemed to be included in scope.
Supply & Fixing/ filling of the following spares of 80 to 150 TR variable speed screw type liquid chillar of capacity of 80 to 15 0TR of Make : voltas/ Blue star for Repair/ replacement under relevant schedule item.
Oil cartridge filter
Compressor oil
Temperature sensor
Lp sensor
Chillar flow switch with connection pipe
Pressure guage 0-7 kg/cm2
MNX 25 contactor 220 V ,50Hz,
MNX 40 contactor 220 V ,50Hz,
MNX 12 contactor 220 V, 50Hz
MNX relay 9-14 AMPS
Timer Star/ delta
Auxillary block
Drier assly complete suitable for above model package unit
Ventilating fan suitable for HVAC drive panel of 132 KW /200 HP of the AC plant
Material and labour for dismantling the defective induction motor of capacity 9.3 to 30 KW of any make 415 V any duty or any class of insulation , taking down from bed duly coupled with pump/ in AHU drive , transporting to work shop, removing the burnt out stator, complete cleaning the stator, remove the cabon and cleaning with CTC/petrol and winding the stator with super enamelled copper wire of appropriate gauge as per the existing standard, varnishing and baking , including replacing of both end bearings, and assembling, transporting back to site, fixing back to position coupling with pump/AHU motor including match proper aligment with drive set and testing & commisioning the motor .
M&L for servicing / cheking/inspection AHU of following capacity of AC plant, with and including dismantling units sheet metal parts, blowing out dust, chemical cleaning by spraying the organic based scale removing agent vaniklin at the appropriate ratio till removal complete dust & scale deposite in the fins area across the evaporator coil, flushing through for proper air follow across the coil, cleaning the motor& greasing of blower motor, cleaning the condensete tray& drain pipe, renewal of rusted bolt,nuts and applying synthetic emamel paint over a coat of primer were ever the rusted portion, removal the pre filters,including checking the aligent of the drive set and testing commisioning the AHU's of the following capacity all as specified as directed .
Up to 5000 CFM.
5000 to 22500 CFM.
22500 to 40000 CFM
S/F of pre Air filter of 90 down 10 micro washable made out of fiber visco type size of 500x400x50 mm
S/F of pre Air filter of 90 down 10 micro washable made out of fiber visco type size of 500x500x50 mm
S/F of pre Air filter of 90 down 10 micron washable made out of fiber visco type size of 600x600x50 mm
S/F of pre Air Filter of 90 down 10 micron washable made out pf fiber visco type size of 500x600x50 mm
S/F of pre Air Filter of 90 down 10 micron washable made out pf fiber visco type size of 600x400x50 mm
S/F of pre Air Filter of 90 down 10 micron washable made out pf fiber visco type size of 400x400x50 mm
S/F PVC Fills size of 600x300x150 mm for FRP Cooling tower
M&L for taking down the damaged fan assembly of FRP cooling tower and connected fitting from the position and supply & fix by new fan assembly 1300mm minimum with 04 blades fan hub assembly made out of DIE Cast aluminium, with necessary clamp supports, nut & bolts by SS metal, including testing comissioning the cooling tower.
M&L for carry out the repair to cooling tower fan motor 7.5HP/5HP flange mounted extended shaft type, including taking down from position, transporting to local work shop, dismantling the motor, replacing amaged unserviceable shaft, bearings, rusted nuts & bolts including servicing motor by motor varnishings to winding etc. assembly back and installation to position and testing comissioning.
M&L for replacing the cooling tower motor base frame, base plate, Nut & bolts with new all as per the existing size and shapeas suitable 80 to 150 TR capacity.
M&L for taking down the defective unserviceable fan motor and assembly from the cooling tower and supply and fix the new fan motor of 7.5 HP, 3 phase,720RPM, 440V,50Hz of extended type shaft, flange mounted with IP-55Degree of protection, weather proof along with fan assembly with 1300mm sweep by 04 fan blades with suitable hub assembly clamps nut & bolts etc. Including connecting the power supply and testing all as specified as directed by Engr-in-charge
M&L for carrying out the overhauling of split casing type pumpset, including dismantling and taking out the worn out parts such as wearing, bearings, bushes and gland packing etc, checking the shaft, cleaning the complete pump. Assembling the pump set ith new parts such as wearing, bearings,bushes, gland packing, gaskets and renewal of rusted stud bolts and refixing in position and matching good alignment including replacement of coupling rubber and testing and commissioning of capacity up to 20 kW all as specified as directed by Engr-in-charge
Complete overhauling/servicing of FRP cooling tower, removal of complete scales, dirt etc. by using chemicals, cleaning the slump louvers, PVC fills, fan assembly, renewal of spray nozzes with connected pipe, renewal of nuts and bolts, leak arresting of the FRP tank and complete painting of the cooling tower as per the standard practice. Repairing to the leakage portion by lining with FRP material including replacement of rusted nut and bolts and replacing of bird screens at air intake portion and testing and commissioning of the cooling tower of the follwoing capacity as specified as directed.
M/L for taking down the damaged direct coupling unit of split casing pumps of chilled water/condenser water and S/F drive set of suitable size with necessary boring to the motor and pump shaft size including making of shaft key way slots and matching of proper alignment to the drive set and testing and commissioning of the drive set upto 25HP
M/L for carrying out painting to central type Air conditioning plant including compressor, condensers, chillers, Refrigeration lines Condenser water line, pumps, motors foundation frmer valves etc as per the existing colour code all as directed by Engr-In-Charge. .Note:-1. Painting should be done with existing colour codes. 2. Quotated rate shall deemed to be included for preparation of old painted surface and applying zinc chrome primer over rusted portion all as directed.
3X25 TR (Indoor & Outdoor of Air cooloed plant)
M/S CHANDRA ENGINEERS AND CONTRACTORS
ANAND ENTERPRISES AND ENGINEERS
COOL CONTROL
B5BUILDING SOLUTIONS
REAL ENGINEERING WORKS
Chitturi Associates
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .