Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.4 L+₹7,657 (0.58%)Admitted-Fee/PreQual/Technical/Finance THANIMOLAL HOUSE MEENANGADI WAYANAD | MEENANGADI | WAYANAD | KERALA | ₹13.4 L+₹7,657 (0.58%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.9 L+₹57,850 (4.36%)Admitted-Fee/PreQual/Technical/Finance | ₹13.9 L+₹57,850 (4.36%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.0 L+₹69,500 (5.23%)Admitted-Fee/PreQual/Technical/Finance | ₹14.0 L+₹69,500 (5.23%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹14.1 L+₹83,450 (6.28%)Admitted-Fee/PreQual/Technical/Finance SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | ₹14.1 L+₹83,450 (6.28%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Synergy Architects and Engineers L1 | Babu Mathew T M L4 | Akhil Paul L2 | Lamanto T. Somervell L3 | AA AND S CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Investigation work for Bridges. | ||||||||
| 1.00 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | 4.95 | Hectare | 7,000 ₹34,650 Lowest | 7,000 ₹34,650 Lowest | 9,000 ₹44,550 | 10,000 ₹49,500 | 12,000 ₹59,400 |
| 1.00 | 56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. | 3 | Hectare | 7,000 ₹21,000 Lowest | 7,000 ₹21,000 Lowest | 9,000 ₹27,000 | 10,000 ₹30,000 | 12,000 ₹36,000 |
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 1,00,000 ₹1,00,000 | 25,000 ₹25,000 | 15,798 ₹15,798 Lowest | 75,000 ₹75,000 | 1,98,000 ₹1,98,000 |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 30 | Bore Holes | 3,000 ₹90,000 Lowest | 5,000 ₹1,50,000 | 3,000 ₹90,000 Lowest | 3,000 ₹90,000 Lowest | 9,000 ₹2,70,000 |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 300 | metre | 700 ₹2,10,000 | 1,100 ₹3,30,000 | 900 ₹2,70,000 | 850 ₹2,55,000 | 600 ₹1,80,000 Lowest |
| 1.01 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 150 | metre | 100 ₹15,000 | 750 ₹1,12,500 | 200 ₹30,000 | 300 ₹45,000 | 50 ₹7,500 Lowest |
| 1.01 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 150 | metre | 10 ₹1,500 Lowest | 250 ₹37,500 | 10 ₹1,500 Lowest | 10 ₹1,500 Lowest | 50 ₹7,500 |
| 1.01 | 56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land | 150 | metre | 1,000 ₹1,50,000 | 100 ₹15,000 | 1,000 ₹1,50,000 | 1,600 ₹2,40,000 | 50 ₹7,500 Lowest |
| 1.01 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. | 90 | metre | 4,000 ₹3,60,000 | 5,000 ₹4,50,000 | 4,500 ₹4,05,000 | 3,200 ₹2,88,000 Lowest | 3,250 ₹2,92,500 |
Tender Value
₹18.4 L
EMD Value
₹45,881
Closing Date
11 Sept 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
PWD NH DIVISION MALAPPURAM
GENERAL Budget 2026-27 Investigation Work Flyover on Kondotty Reach of NH 966 Investigation Work 1
2026_PWD_867735_1
PWD/NH/TR/10172/2026_3_1_1/1
Open Tender
Civil Works - Highways
Item Rate
120 days
kondotty
Please refer tender documents
9 documents required · 9 mandatory
₹2,760
Yes
₹45,881
Yes
15 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Investigation work for Bridges. | |||||
| 1.001 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | 4.95 | Hectare | - | - |
| 1.002 | 56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. | 3 | Hectare | - | - |
| 1.003 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | - | - |
| 1.004 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 30 | Bore Holes | - | - |
| 1.005 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 300 | metre | - | - |
| 1.006 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 150 | metre | - | - |
| 1.007 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 150 | metre | - | - |
| 1.008 | 56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land | 150 | metre | - | - |
| 1.009 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. | 90 | metre | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1469512.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .