Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance GARIAHAT RD OPP LOYALKA HOSE KOLKATA 700019 WEST BENGAL | KOLKATA | WEST BENGAL | 700019 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD DHANBAD 828121 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance 01 MALKERA KATRASGARH DHANBAD 01 MALKERA KATRASGARH DHANBAD 01 MALKERA KATRASGARH DHANBAD DHANBAD DHANBAD 828304 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828304 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1,938
Closing Date
27 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Manager Excavation
Office of The General Manager Bastacolla Area Office Excavation Department BCCL Dhanbad
Repairing of the 01 No. main hydraulic pump of REL Drill MaCHINE sl.No. DR-241 of Kuya OCP, Bastacolla Area IX
2023_BCCL_268556_1
BCCL/BA-IX/AM (Excvn)/E-Tender/22-23/191
Open Tender
Excavation Department Work
Item Rate
10 days
Kuya OCP, Bastacolla Area IX.
As Per NIT
3 documents required · 3 mandatory
₹1,938
Yes
28 Jan 2023
21 Jan 2023
28 Jan 2023
21 Jan 2023
27 Jan 2023
21 Jan 2023
21 Jan 2023 - 25 Jan 2023
Amount
Repairing of the 01 No. main hydraulic pump of REL Drill MACHINE sl.No. DR-241 of Kuya OCP, Bastacolla Area IX
Repairing of the 01 No. main hydraulic pump of REL Drill MACHINE sl.No. DR-241 of Kuya OCP, Bastacolla Area IX 1. Dismantling of the main hydraulic Pump – 01 No. 2. Replacement of piston sub assly, seal kit, spring outlet, piston spring, retaining ring, drive shaft. 3. Assembling of Pump assly – 01 No. Note:- Materials required for the job as per scope of work will be provided by the bidder.
Total impact of GST for the purpose of CTC
W. A. ENGINEERING WORKS
SUNRISE ENTERPRISES
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .