Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.3 L+₹67,532.55 (8.85%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.6 L+₹1.0 L (13.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹9.4 L+₹1.8 L (23.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹9.8 L+₹2.2 L (28.8%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹30,000
Closing Date
7 Apr 2026, 3:00 pmClosed
ER FAYAZ AHMAD BHAT (EXEN JS PHE RWSD GBL/SGR)
OFFICE OF THE EXEN JS PHE RWSD GBL/SGR
Stage contract for providing of water supply and maintenance of various Water supply schemes including providing drinking water facility to security forces deployed at various stations from wussan to sonamarg as per requirement for SANJY
2026_PHE_306812_10
E NIT NO 42 OF 2025 - 26
Open Tender
Civil Works - Water Works
Percentage
360 days
JS PHE RWS S/D KANGAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EXEN JS PHE RWSD GBL/SGR
₹30,000
13 Apr 2026
27 Mar 2026
8 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge | |||||
| 2All kinds of soil : | |||||
| 3Ordinary Rock | |||||
| 4Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 5In all kinds of soils | |||||
| 6Ordinary rock | |||||
| 7Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | |||||
| 8In all kinds of soils | |||||
| 9Ordinary rock | |||||
| 10Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
stage.html
html • 0.04 MB
technical_995943.pdf
techsummary_995943.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_995943.xls
BOQ • 0.94 MB
CORRIGENDUM.pdf
PDF • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .