Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC KERALA KL | ALAPPUZHA | KERALA | 688548 | ₹3.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 L+₹9,362.24 (2.75%)Rejected-Finance | ₹3.5 L+₹9,362.24 (2.75%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.0 L+₹55,440.13 (16.3%)Rejected-Finance | ₹4.0 L+₹55,440.13 (16.3%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Rameshchandran.C.S L3 | ANI C B L1 | RENJITH S I L2 |
|---|---|---|---|---|---|---|
| 1.00Road Concreting | ||||||
| 1.00 | OD50096/2025-2026:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil | 242.25 | sqm | 32.26 ₹7,814.99 | 27.75 ₹6,722.44 Lowest | 28.51 ₹6,906.55 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 36.34 | cum | 8,397.82 ₹3,05,159.98 | 7,222.71 ₹2,62,458.84 Lowest | 7,421.17 ₹2,69,670.48 |
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 4.5 | cum | 827.01 ₹3,721.55 | 711.29 ₹3,200.81 Lowest | 730.83 ₹3,288.74 |
| 1.00 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 12.07 | cum | 6,012.95 ₹72,606.37 | 4,669.47 ₹56,383.85 Lowest | 5,313.65 ₹64,162.32 |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 0.45 | cum | 8,681.7 ₹3,906.77 | 20,940.4 ₹9,423.18 | 7,672.03 ₹3,452.41 Lowest |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.03 | tonne | 88,192.89 ₹2,998.56 | 75,852.04 ₹2,578.97 Lowest | 77,936.23 ₹2,649.83 |
Tender Value
₹4.6 L
EMD Value
₹11,531
Closing Date
8 Jul 2025, 9:00 amClosed
Assistant Engineer
Office of Assistant Engineer Pulimath GP Karette Vamanapuram PO 695606
92/26-Kunjanmukku Kadalukani road concrete in ward 10-General Civil Work
2025_LSGD_772711_7
3/E-TENDER/AE/PLT/2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
Pulimath GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,020
Yes
₹11,531
Yes
6 Aug 2026
30 Jun 2025
9 Jul 2025
30 Jun 2025
8 Jul 2025
30 Jun 2025
Amount
Road Concreting
OD50096/2025-2026:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
RENJITH S I (BID ID -2241294)
Rameshchandran.C.S (BID ID -2240063)
Bidder Name
Rameshchandran.C.S
ANI C B
RENJITH S I
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1261855.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .