| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹6,693.48 (0.04%)Admitted-Finance | ₹1.6 Cr+₹6,693.48 (0.04%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹16,559.81 (0.10%)Admitted-Finance | ₹1.6 Cr+₹16,559.81 (0.10%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MOHAMMAD KOYA BAPU L2 | K. MOOSA L3 | P. M Abdul kareem L1 |
|---|---|---|---|---|---|---|
| 1.00stadium | ||||||
| 1.01 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 954.34 | cum | 11,023 ₹1,05,19,700.84 | 11,022.71 ₹1,05,19,424.08 Lowest | 11,022.71 ₹1,05,19,424.08 Lowest |
| 1.02 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 524.02 | sqm | 337.42 ₹1,76,814.49 | 337.42 ₹1,76,814.49 | 337 ₹1,76,594.4 Lowest |
| 1.03 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 23,845.35 | kilogram | 98.92 ₹23,58,782.12 Lowest | 98.92 ₹23,58,782.12 Lowest | 98.92 ₹23,58,782.12 Lowest |
| 1.04 | od208890/2024_2025 : Supplying providing and fixing PVC pipes 110 mm dia including all charges for providing weep hole | 863.78 | metre | 209.77 ₹1,81,196.18 Lowest | 210 ₹1,81,394.85 | 209.77 ₹1,81,196.18 Lowest |
| 1.05 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 94.65 | cum | 3,513.33 ₹3,32,533.17 | 3,515 ₹3,32,691.24 | 3,513 ₹3,32,501.94 Lowest |
| 1.06 | 50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 9,786.35 | cum | 298 ₹29,16,332.6 | 299 ₹29,26,118.95 | 297.37 ₹29,10,167.2 Lowest |
Tender Value
₹2 Cr
Closing Date
25 Jan 2025, 6:00 pmClosed
BaijuT P
Forest Industries Travancore Limited , Aluva
Construction of Stadium
2025_FITL_727492_1
FIT/CP-56/2024-25
Open Tender
Civil Works - Others
Item Rate
365 days
Oorakam international stadium in Oorakam GP
Refer Tender Document
8 documents required · 8 mandatory
₹5,900
Exempted
Forest Industries Travancore Limited , Aluva
28 Jan 2025
17 Jan 2025
27 Jan 2025
17 Jan 2025
25 Jan 2025
17 Jan 2025
17 Jan 2025 - 20 Jan 2025
20 Jan 2025
Amount
stadium
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od208890/2024_2025 : Supplying providing and fixing PVC pipes 110 mm dia including all charges for providing weep hole
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
MOHAMMAD KOYA BAPU (BID ID -2076098)
K. MOOSA (BID ID -2076035)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1157919.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .