| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | l2₹12.7 L+₹12,010.81 (0.95%)Rejected-Finance RAMANILAYAM H MOKERI PO | l2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | CHANDRAN. P. L2 | Muraleedharan K L1 |
|---|---|---|---|---|---|
| 1.00Canal work | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 79.59 | cum | 182.64 ₹14,537.23 | 180.7 ₹14,382.82 Lowest |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | 17.28 | cum | 1,077.58 ₹18,620.58 | 1,066.13 ₹18,422.73 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 38.12 | cum | 5,815.24 ₹2,21,671.13 | 5,753.53 ₹2,19,318.81 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 548.3 | sqm | 613 ₹3,36,107.9 | 605.51 ₹3,32,001.13 Lowest |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 82.58 | cum | 6,286.85 ₹5,19,199.51 | 6,220.14 ₹5,13,690.26 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 6.9 | cum | 6,818.72 ₹47,049.17 | 6,746.35 ₹46,549.82 Lowest |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 433.6 | sqm | 228.33 ₹99,003.89 | 225.91 ₹97,954.58 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 57.16 | cum | 220.63 ₹12,610.77 | 218.29 ₹12,477.02 Lowest |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 35 | kg | 44.21 ₹1,547.35 Lowest | 101.13 ₹3,539.55 |
Tender Value
₹15.0 L
EMD Value
₹37,495
Closing Date
5 May 2025, 6:55 pmClosed
Executive Engineer
O/O Executive Engineer ,KyIP Division Perambra
Canal rectification
2025_Irrig_734609_2
EE/KyIP/19/2024-25
Open Tender
Civil Works - Canal
Item Rate
180 days
Ayancheri
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹37,495
Yes
23 Sept 2025
28 Apr 2025
7 May 2025
28 Apr 2025
5 May 2025
28 Apr 2025
28 Apr 2025 - 5 May 2025
Amount
Canal work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
CHANDRAN. P. (BID ID -2207441)
Bidder Name
CHANDRAN. P.
Muraleedharan K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1240645.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .