Loading…
Loading…
Tender Value
₹69.6 L
EMD Value
₹1.6 L
Closing Date
28 Jul 2026, 5:00 pm
GENERAL MANAGER (JAL)
Water Works Compound Sector-5 Noida
M/o Gangajal (Replacement of damaged GRP/DI/MS Gangajal Water lines at different places in Noida Region) Noida
2026_NOIDA_1169524_1
11/SM(GANGAJAL)/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
180 days
NOIDA
Please Refer to Tender Document
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.6 L
15 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge bituminous road | 330.5 | sqm | 164.91 | ₹54,502.76 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil -The contractor has to dectect different utilities like sewer line,water supply line,electric cable,telephone cable gas pipe line etc using utility dectecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in- Charge | 2,353.07 | cum | 136 | ₹3,20,017.52 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundaions etc. in layers not exceeding 20 cm in depth: consolidating earth deposited layer by ramming and watering, lead up to 50m and lift upto 1.50 m. | 2,353.07 | cum | 93 | ₹2,18,835.51 |
| 4 | P/F M.S. specials such as tee, bends, collars, Tapers, gap pieces, including Flange Ends as requered, Painting, cutting,welding as per site requirement of MS pipe thickness etc in all respect as per direction by the E/I. | 75,800.01 | Kg | 72.63 | ₹55,05,354.73 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size) | 65 | cum | 6,066.29 | ₹3,94,308.85 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 Cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 65 | cum | 6,753.45 | ₹4,38,974.25 |
| 7 | Hiring of Diesel Engine ( including cost of Diesel, lubricant & Operator)( For Dewatering) | 125 | Hrs | 238 | ₹29,750 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Capability_11.xls
Additional Documents • 0.05 MB
TD11.pdf
Tender Documents • 2.38 MB
BOQ_2194645.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid