Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.1 L+₹1.6 L (9.52%)Rejected-Finance 67 AASANI BAS PALANA PALANA BIKANER BIKANER RAJASTHAN 334402 UDYAM RJ 08 0063520 | BIKANER | RAJASTHAN | 334402 | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.7 L+₹2.2 L (13.2%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹20.1 L
EMD Value
₹40,300
Closing Date
14 Feb 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
MGCCD4AMROHA
CONSTRUCTION OF VRB AT KM 0.680 AND FALL AT KM 1.600 OF UMRO MINOR UNDER M.G.C. PROJECT STAGE II IN DIST AMROHA SAMBHAL
2025_UPIDC_1003908_1
01/EE/24-25
Open Tender
Civil Works - Canal
Item Rate
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹40,300
25 Feb 2025
8 Feb 2025
14 Feb 2025
8 Feb 2025
14 Feb 2025
8 Feb 2025
Amount
Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work
Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge
Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Providing & laying of R.C.C. M 15 (1:2:4) with A-20 including all cost of material, labour, T & P etc. required for proper completion of the work as directed by Engineer-in-charge.
Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work
Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work
Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work
Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work
Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work
Making cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work
Providing and filling of local sand as back filling i/c cost of all material,labour and T&P complete for proper completion of work
Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work
Providing and Fixing of year Plate for proper completion of work
Providing and fixing of B.M Plate for proper completion of work
Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm) for proper completion of work
E/w in cutting or filling for making approaches of VRB in ordinary soil in layers i/c cost of all labours T& P with ramming drassing upto required levels and slopes or gradient proper completion of work and required lead up to 1.00 Km distence from work site or as per directed by Engineer- in -charge. The earth from cutting to be used in making embankment or to be deposited is spoil bank within 30m distence as per directed by Engineer-in-charge. The rates will be made as per given table in case 1.00 km lead reduced in any condition..
Supply and Laying RBM for making hard base Including cost of all labour T&P etc. required for proper completion of work
P / laying of coarse sand in graded filter including all cost of labour, material, T & P etc. complete required for proper completion of work as directed by Engineer in Charge.
P / laying of pea gravel in bed and graded filter sand in graded filter including all cost of labour, material, T & P etc. complete required for proper completion of work as directed by Engineer in Charge.
P / laying of boulder 20 to 40 kg in bed, launching appron including all cost of labour, material, T & P etc. complete required for proper completion of work as directed by Engineer in Charge.
Painting and finishing with water proof approved paint on all exposed surface including all cost of labour, material, T & P etc. complete required for proper completion of work as directed by Engineer in Charge.
S S CONSTRUCTION COMPANY (BID ID -4955824)
M/S SAVERA BUILDCON (BID ID -4955729)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .