Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance DEHRADUN VICTORIA CROSS VIJETA GABAR SINGH URJA BHAWAN KANWALI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹50.5 L (20.1%)Admitted-Finance | ₹3.0 Cr+₹50.5 L (20.1%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹54.4 L (21.7%)Admitted-Finance | ₹3.1 Cr+₹54.4 L (21.7%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S GOVERDHAN TRADERS L1 | Namdev And Sons L3 | UTTARANCHAL ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.0011 KV LINE | ||||||
| 2.00ERECTION WORK AND CARTAGE | ||||||
| 3.00Safe Cartage of stock material form store at Roorkee/Rishikesh/Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 40KM) | ||||||
| 4.00 | ST Pole SP-23 | 264 | No. | 410 ₹1,08,240 Lowest | 450 ₹1,18,800 | 450 ₹1,18,800 |
| 5.00 | ST Pole SP-55 | 14 | No. | 470 ₹6,580 Lowest | 500 ₹7,000 | 500 ₹7,000 |
| 6.00 | small line material | 40 | MT. | 3,480 ₹1,39,200 Lowest | 3,600 ₹1,44,000 | 3,600 ₹1,44,000 |
| 7.00 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing. | 7,082 | Kg. | 17.5 ₹1,23,935 Lowest | 20 ₹1,41,640 | 20 ₹1,41,640 |
| 8.00 | Erection of Double pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting & fixing of angle channel etc.)
(i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
(ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
(iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
(iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. | 4 | No. | 5,450 ₹21,800 Lowest | 5,700 ₹22,800 | 5,700 ₹22,800 |
| 9.00 | Erection of single pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting & fixing of angle channel etc.)
(i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
(ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
(iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
(iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. | 6 | No. | 2,670 ₹16,020 Lowest | 3,000 ₹18,000 | 3,000 ₹18,000 |
| 10.00 | Erection of Double pole SP-23 with complete fitting & grouting as per RESPO norms (incuding excavation, cost of grouting & fixing of angle channel etc.)
(i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
(ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
(iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
(iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. | 37 | No. | 4,020 ₹1,48,740 Lowest | 4,500 ₹1,66,500 | 4,500 ₹1,66,500 |
Tender Value
₹2.5 Cr
EMD Value
₹5.1 L
Closing Date
10 Dec 2020, 1:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Haridwar
For Construction and dismantling 11 KV, LT line
2020_UPCL5_27773_1
16/SE/KM-2021/EDCH/2020-21
Open Tender
Electrical Works
Item Rate
30 days
Kumbh Mela-2021
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
EE, TEDD, Kumbh Mela-2021
₹5.1 L
17 Dec 2020
27 Nov 2020
11 Dec 2020
27 Nov 2020
10 Dec 2020
27 Nov 2020
Amount
11 KV LINE
ERECTION WORK AND CARTAGE
Safe Cartage of stock material form store at Roorkee/Rishikesh/Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 40KM)
ST Pole SP-23
ST Pole SP-55
small line material
Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing.
Erection of Double pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting & fixing of angle channel etc.) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual. (iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. (iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.
Erection of single pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting & fixing of angle channel etc.) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual. (iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. (iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.
Erection of Double pole SP-23 with complete fitting & grouting as per RESPO norms (incuding excavation, cost of grouting & fixing of angle channel etc.) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual. (iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. (iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.
Erection of Single pole SP-23 with complete fitting & grouting as RESPO norms (incuding excavation, cost of grouting & fixing of angle channel etc.) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual. (iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. (iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.
Erection of stay with complete grouting, tightening and nozzling as per RESPO norms (i) Excavation of earth for Stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Fixing , tightening and nozzaling of 11 KV Stay with pole and stay rod on required tension as per drawing / RESSPO manual. (iii) Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
Erection of earthing of pole by earth-rod Complete as per RESPO norms
Fixing of Tee-off Channel with complete accessories
Spreading,stringing, sagging & jumpering of 3-phase, 4-wire 11 KV line with ACSR Rabbit conductor & earth-wire 7/16
Fixing of 11KV Guarding complete as per RESPO norms
Painting of following pole i. Above ground level upto 8 foot with one coat red oxide & insulating paint (suitable for 11KV insulation) (including cost of red oxide & insulating paint) ii. After 8 foot one coat red oxide & two coat enamel aluminium paint (including cost of red oxide & enamal paint)
ST Pole SP-23
ST Pole SP-55
11 KV LINE DISMANTLING WORK & BACK CARTAGE TO STORE
Dismantling of 11 KV line guarding, saparating of wires and making roll
Dismantling of 3-phase, 4-wire 11 KV line conductor ACSR rabbit with earth-wire 7/16 and making roll
Dismantling of 11KV Tee-off with complete accessories
Dismantling of 11 KV Double pole(on SP-55) with complete accessories(including opening of stay-wire)
Dismantling of 11 KV Single pole(on SP-55) with complete accessories(including opening of stay-wire)
Dismantling of 11 KV Double pole (on SP-23) with complete accessories(including opening of stay-wire)
Dismantling of 11 KV Single pole(on SP-23) with complete accessories(including opening of stay-wire)
Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) by Pvt truck including loading & unloading (average distance 40KM)
ST Pole SP-23
ST Pole SP-55
Small line material
3 PH 6 WIRE LT LINE
ERECTION WORK AND CARTAGE
Safe Cartage of stock material form store at Roorkee/Rishikesh/Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 40KM)
ST Pole SP-21
Small line material.
Erection of ST Pole SP-21 with complete fitting & grouting as per RESPO norms (including excavation & cost of grouting) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual. (iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
Erection of ST Pole SP-21 with complete fitting & grouting as per RESPO norms (including excavation & cost of grouting) (for pole stay) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual. (iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
Erection of ST Pole SP-21 with complete fitting as per RESPO norms (including excavation & without grouting) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
Erection of stay with complete grouting, tightening and nozzling as per RESPO norms (i) Excavation of earth for Stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Fixing , tightening and nozzaling of 11 KV Stay with pole and stay rod on required tension as per drawing / RESSPO manual.
Erection of earthing of pole by earth-rod Complete as per RESPO norms
Spreading,stringing, sagging & jumpering of 3-phase, 6-wire LT line with ACSR Raccon conductor for phase wire and neutral wire, ACSR Weasel conductor for street light wire & earth-wire 7/16
Spreading,stringing, sagging & jumpering of 3-phase, 6-wire LT line with ACSR Weasel conductor for phase wire, neutral wire and street light wire & earth-wire 7/16 for continous earth wire.
Painting of following pole i. Above ground level upto 8 foot with one coat red oxide & insulating paint (for LT insulation) (including cost of red oxide & insulating paint) ii. After 8 foot one coat red oxide & two coat enamel aluminium paint (including cost of red oxide & enamal paint)
ST Pole SP-23
3 PH 6 WIRE LT LINE DISMANTLING WORK & BACK CARTAGE TO STORE
Dismantling of 3-phase, 6-wire LT line with ACSR Raccon conductor for phase wire and neutral wire, ACSR Weasel conductor for street light wire & earth-wire 7/16
Dismantling of 3-phase, 6-wire LT line with ACSR Weasel conductor for phase wire, neutral wire and street light wire & earth-wire 7/16 for continous earth wire
Dismantling of ST pole SP-21 complete (including opening of stay-wire)
Dismantling of ST pole SP-21 (for pole stay)
Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) by Pvt truck including loading & unloading (average distance 40KM)
ST Pole SP-21
Small line material
1 PHASE 3 WIRE LT LINE
ERECTION WORK AND CARTAGE
Safe Cartage of stock material form store at Roorkee/Rishikesh/Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 40KM)
ST Pole SP-10
Small line material
Erection of ST Pole SP-10 with complete fitting as per RESPO norms (including excavation & without grouting) (for pole stay) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
Erection of ST Pole SP-10 with complete fitting as per RESPO norms (including excavation & without grouting) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
Erection of stay with complete grouting, tightening and nozzling as per RESPO norms (i) Excavation of earth for Stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Fixing , tightening and nozzaling of 11 KV Stay with pole and stay rod on required tension as per drawing / RESSPO manual.
Erection of earthing of pole by earth-rod Complete as per RESPO norms
Spreading,stringing, sagging & jumpering of 1-phase, 3-wire LT line ACSR Weasel conductor & earth-wire 7/16
Painting of following pole i. Above ground level upto 8 foot with one coat red oxide & insulating paint (suitable for LT insulation) (including cost of red oxide & insulating paint) ii. After 8 foot one coat red oxide & two coat enamel aluminium paint (including cost of red oxide & enamal paint)
ST Pole SP-10
1 PHASE 3 WIRE LT LINE DISMANTLING WORK & BACK CARTAGE TO STORE
Dismantling of 1-phase, 3-wire LT line with ACSR weasel conductor & earth-wire 7/16
Dismantling of ST pole SP-10 ( for pole stay)
Dismantling of ST pole SP-10 complete (including opening of stay-wire)
Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) by Pvt truck including loading & unloading (average distance 40KM)
ST Pole SP-10
Small line materiaL
STREET LIGHT
ERECTION WORK AND CARTAGE
Cartage of following material form store to work site including loading, unloading & safe stacking (average distance - 1 to 30 Km)
150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
40 watt LED light fitting with all accessoies (for street light) i. 40 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
Mounting of following street light material on pole
150 watt HPSV Flood light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 150 watt HPSV Flood lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt HPSV light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt HPSV lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt LED light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
40 watt LED light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 40 watt LED - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
STREET LIGHT DISMANTLING WORK & BACK CARTAGE TO STORE
Dismatling of following street light materials from poles
150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
40 watt LED light fitting with all accessoies (for street light) i. 40 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
Back Cartage of following material form work site to store including loading, unloading & safe stacking (average distance - 1 to 30Km)
150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
40 watt LED light fitting with all accessoies (for street light) i. 40 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter
TRANSFORMER'S
ERECTION WORK AND CARTAGE
Safe Cartage of stock material form store at Roorkee/Rishikesh/ Haridwar(SIDCUL) to work site by truck including loading, unloading & safe stacking (average distance 40KM)
25 KVA, 11/0.4 KV Transformer
63 KVA, 11/0.4 KV Transformer
100 KVA, 11/0.4 KV Transformer
250 KVA, 11/0.4 KV Transformer
400 KVA, 11/0.4 KV Transformer
ST Pole SP-23
Small line material
Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing.
Erection of S/S Double pole SP-23 with complete fitting & grouting as per RESPO norms (incuding excavation, cost of grouting, muffing ) (i) Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (ii) Erection of following pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual. (iii) Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. (iv) Muffing of following poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.
Mounting of 25 KVA 11/0.4 KV Transformer on D/P with making all connections of HT & L.T. side (complete work).
Mounting of 63 KVA 11/0.4 KV Transformer on D/P with making all connections of HT & L.T. side (complete work).
Installation / mounting of 100 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
Installation / mounting of 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning.
Installation / mounting of 400 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning.
Mounting & fixing of G.O. Switch & Fuse set on double pole structure including making all connections (complete work).
Mounting and fixing of Lightning Arrestor (complete work).with G.I Strip (G.I. strip (35X6 sqmm) will be provided by the contractor)
Mounting and fixing of DTR Metering cubical with meters (complete work).
Fixing of DTR LT Distribution Box (MCCB) (complete work).
Erection of Delta earthing as per RESPO norms( for eathing of T/F neutral, T/F body.) with GI Strip. (G.I. strip (35X6 sqmm) will be provided by the contractor)
Laying & Erection of LT PVC Single lead Cable including crimping of lugs of size 1X35 sqmm etc..(including all cost of material)
Laying & Erection of LT PVC single lead Cable including crimping of lugs of size 1X120 sqmm etc..(including all cost of material)
Laying & Erection of LT PVC single lead Cable including crimping of lugs of size 1X240,400,630 etc.. sqmm(including all cost of material)
Painting of following pole i. Above ground level upto 8 foot with one coat red oxide & insulating paint (suitable for 11KV insulation) (including cost of red oxide & insulating paint) ii. After 8 foot one coat red oxide & two coat enamel aluminium paint (including cost of red oxide & enamal paint)
Double pole of Substation with channel & angle
Construction of T/F plinth of size 2x2x1.2 mtr above ground level and 0.3 mtr. Below ground level and making wiremesh fencing of size 4.0x4.0x1.2 mtr above ground level without Toe wall. (Including cost of material) complete work.
TRANSFORMER'S DISMANTLING WORK & BACK CARTAGE TO STORE
Dismantaling of 25 KVA Transformer from the double pole with opening of connection of HT side & LT side, fuse set, G.O.Switch,L.A,Capacitor, DTR meter along with LT cable & DTR LT distribution boxes.
Dismantaling of 63 KVA Transformer from the double pole with opening of connection of HT side & LT side, fuse set, G.O.Switch,L.A,Capacitor, DTR meter along with LT cable & DTR LT distribution boxes
Dismantaling of 100 KVA Transformer from the double pole with opening of connection of HT side & LT side, fuse set, G.O.Switch,L.A,Capacitor, DTR meter along with LT cable & DTR LT distribution boxes
Dismantaling of 250 KVA Transformer from plinth with opening connection of HT side & LT side, opening of fuse set, G.O.Switch,L.A,Capacitor, DTR meter,along with LT cable, DTR LT distribution boxes & fancing
Dismantaling of 400 KVA Transformer from plinth with opening connection of HT side & LT side, fitting of fuse set, G.O.Switch,L.A,Capacitor, DTR meter, DTR LT Distribution boxes & fancing.
Dismantling of 11 KV Double pole (on SP-23) with complete accessories(including opening of stay-wire)
Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) by Pvt truck including loading & unloading (average distance 40KM)
25 KVA, 11/0.4 KV Transformer
63 KVA, 11/0.4 KV Transformer
100 KVA, 11/0.4 KV Transformer
250 KVA, 11/0.4 KV Transformer
400 KVA, 11/0.4 KV Transformer
ST Pole SP-23
Small line material
RMU CONNECTING XLPE CABLE
ERECTION WORK & CARTAGE
Safe Cartage of stock material from store at Roorkee/Rishikesh/Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 40KM)
Small line material
Laying of 11 KV XLPE Cable underground by excavation work as per RESPO, climbing of cable on D/P through G.I. Pipe, making connection both side complete work
Fixing of 11 KV Cable Jointing kit
Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing.
Erection of earthing of pole by earth-rod Complete as per RESPO norms
RMU CONNECTING XLPE CABLE DISMANTLING WORK & BACK CARTAGE TO STORE
Dismantling of 11 kv XLPE Cable & M.S. Channel safely with opening connection from both sides
Back cartage of small material
TEMPORARY BRIDGE STREET LIGHT
TEMPORARY BRIDGE STREET LIGHT CARTAGE AND MOUNTING WORK
Cartage of following material from store to work site including loading, unloading & safe stacking (average distance - 1 to 25 Km)
Small line material
Fixing of MS pipe in vertical position on temporary bridge with clamps
Fixing of Junction box and Laying of PVC pipe under or along the bridge railing with PVC cable aluminium 2 x 10 Sq.mm. and G.I wire 14 SWG for continuous earth wire for temporary bridge and making connection with nearest pole through Double Pole Iron Clad Main Switch or MCB
Mounting of following street light materials on MS poles, including making connection to supply .
40 watt LED light fitting with all accessories (for street light) i. 40 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and MS Pipe) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter v. PVC cable aluminium 2 x 6 Sq.mm - 3.5 meter
TEMPORARY BRIDGE STREET LIGHT DISMANTLING WORK & BACK CARTAGE TO STORE
Dismantling of following street light materials on MS poles.
40 watt LED light fitting with all accessories (for street light) i. 40 watt LED lumanary - 1 No. ii. G.I pipe bracket (for street ligth) - 1 No. iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and MS Pipe) - 2 No. iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter v. PVC cable aluminium 2 x 6 Sq.mm - 3.5 meter
Dismantling of Junction box and Laying of PVC pipe under or along the bridge railing with PVC cable aluminium 2 x 10 Sq.mm. and G.I wire 14 SWG for continuous earth wire for temporary bridge and Double Pole Iron Clad Main Switch or MCB
Dismantling of MS pipe from temporary bridge with clamps
Back Cartage of following material form store to work site including loading, unloading & safe stacking (average distance - 1 to 25 Km)
Small line material
Man Power (For 48 Days) Hiring of Man power for operation & maintenance of HT lines,LT lines, 11/0.4 KV Sub-stations & street lights for sectors and parkings of Kumbh Mela-2021 under temprarory work.
Supervisor
Skilled worker
Un-skilled worker
Operator for lodging electricity complaints
NSC CARTAGE AND MOUNTING WORK
Labour Cost for giving Single Phase Connection up to 4 KW
Labour Cost for giving Service Connection up to 25 KW
Labour Cost for giving Service Connection up to 75 KW
NSC DISMANTLING WORK & BACK CARTAGE TO STORE
Labour Cost of Dismentling for Single Phase Connection
Labour Cost of Dismentling for up to 25 KW Connection
Labour Cost of Dismentling for up to 75 KW Connection
GENERATOR
Hiring of 63 KVA generator (with diesel) including operator, Changeover switch, Cable, Al. Lug , Of appropriate size,Earth rod/Chemical Earhing. & loading & unloading at site & making connection for alternate supply for continuity of supply.
Hiring of 100 KVA generator (with diesel) including operator, Changeover switch, Cable, Al. Lug , Of appropriate size,Earth rod/Chemical Earhing. & loading & unloading at site & making connection for alternate supply for continuity of supply.
TRANSFORMER TROLLY
TRANSFORMER TROLLY CARTAGE AND MOUNTING WORK
Safe Cartage of stock material form store at Roorkee/Rishikesh/ Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 40KM)
400 KVA, 11/0.4 KV Transformer
Small line material
Mounting of 400 KVA Transformer on trolly with making connection of HT side & LT side
Termination of Cable Al 3x70 Sq.mm. XLPE 11 Kv by Heat Shrinkable Jointing Kit for Size 3x70 Sq.mm outdoor Type
Laying & jointing of LT/ HT cable
Trolly movement chagres
TRANSFORMER TROLLY DISMANTLING WORK & BACK CARTAGE TO STORE
Dismantling of 400 KVA Transformer from trolly with opening of connection of HT side & LT side(if have)
Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) by Pvt truck including loading & unloading (average distance 40KM)
400 KVA, 11/0.4 KV Transformer.
Small line material.
Four tyre trolly size 2m x 4m with handle
UTTARANCHAL ENTERPRISES
Namdev And Sons
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_32888.xls
BOQ • 0.34 MB
Tenderdocuments.pdf
Tender Documents • 15.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .