Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹47.0 L+₹41,913.90 (0.90%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹47.2 L+₹68,078.39 (1.46%)Admitted-Finance DIGHALI GAON P O SHILAMARA DIST LAKHIMPUR | UNNAO | UTTAR PRADESH | 209869 | L3 | Admitted-Finance | |
| 4 | L4₹47.3 L+₹79,377.30 (1.71%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹47.5 L+₹93,180.40 (2.00%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Chanda Construction L7 | M/S LALIT DOLEY L6 | KULA PRASAD GOHAIN L3 | PRADIP CHANGMAI L4 | SATYA CHANGMAI L8 | GHANA KRISHNA BORA L2 | Bipul Gogoi L5 | M/s GOURAB JYOTI GOGOI L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and disposal of debris and rubbish complete all as specified and directed. | 244 | Sqm | 50 ₹12,200 | 30 ₹7,320 Lowest | 49 ₹11,956 | 100 ₹24,400 | 33 ₹8,052 | 100 ₹24,400 | 45 ₹10,980 | 45 ₹10,980 |
| 2.00 | Demolition of un-reinforced cement concrete in ground floors and pavings n.exc 15cm thickness, (Below or above Ground level) and disposal of debris and rubbish to a distance complete all as directed by the Engr-in-Charge | 25.3 | Cum | 1,100 ₹27,830 | 900 ₹22,770 Lowest | 900 ₹22,770 Lowest | 1,500 ₹37,950 | 1,075 ₹27,197.5 | 1,500 ₹37,950 | 1,000 ₹25,300 | 1,050 ₹26,565 |
| 3.00 | Demolition/Dismantling of stone slabs /paver Blocks and tiles of any description or thickness laid bedded and pointed in any mortar in floors , aprons etc. and clean the surface to receive screed bed to lay new tiles complete all as directed and directed | 2.76 | 10sqm | 900 ₹2,484 | 500 ₹1,380 | 475 ₹1,311 | 670 ₹1,849.2 | 885 ₹2,442.6 | 670 ₹1,849.2 | 400 ₹1,104 | 340 ₹938.4 Lowest |
| 4.00 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 1 | Cum | 980 ₹980 | 900 ₹900 | 875 ₹875 Lowest | 1,300 ₹1,300 | 996 ₹996 | 1,300 ₹1,300 | 900 ₹900 | 900 ₹900 |
| 5.00 | Taking down chowkats or frame, n.exc 1.5 Sqm each with shutters (without taking off shutter from the frame) complete all as specified and directed. | 7 | Each | 100 ₹700 | 90 ₹630 | 90 ₹630 | 200 ₹1,400 | 120 ₹840 | 200 ₹1,400 | 70 ₹490 Lowest | 80 ₹560 |
| 6.00 | Taking down chowkats or frames, exc 1.5 but n.exc. 4 Sqm in each with shutter (without taking off shutter from the frame) complete all as specified and directed. | 12 | Each | 100 ₹1,200 | 80 ₹960 | 80 ₹960 | 200 ₹2,400 | 120 ₹1,440 | 200 ₹2,400 | 75 ₹900 Lowest | 90 ₹1,080 |
| 7.00 | Taking down shutters of any descriptions exc. 1 sqm and n exc 2 sqm each and removing from site complete all as specified & directed. | 2 | Each leaf | 90 ₹180 | 50 ₹100 Lowest | 50 ₹100 Lowest | 160 ₹320 | 87 ₹174 | 160 ₹320 | 50 ₹100 Lowest | 50 ₹100 Lowest |
| 8.00 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water and removing rubbish complete all as specified and directed | 23.04 | Sqm | 62 ₹1,428.48 | 36 ₹829.44 Lowest | 36 ₹829.44 Lowest | 75 ₹1,728 | 38 ₹875.52 | 75 ₹1,728 | 40 ₹921.6 | 60 ₹1,382.4 |
| 9.00 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, in roof covering including ridges and keeping serviceable sheets in safe custody for reuse in the work complete as directed. | 247.74 | Sqm | 48 ₹11,891.52 | 35 ₹8,670.9 Lowest | 35 ₹8,670.9 Lowest | 90 ₹22,296.6 | 54 ₹13,377.96 | 90 ₹22,296.6 | 62 ₹15,359.88 | 55 ₹13,625.7 |
| 10.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3.3 | Qtl | 900 ₹2,970 | 800 ₹2,640 Lowest | 800 ₹2,640 Lowest | 1,040 ₹3,432 | 845 ₹2,788.5 | 1,040 ₹3,432 | 800 ₹2,640 Lowest | 900 ₹2,970 |
Tender Value
₹46.6 L
EMD Value
₹93,200
Closing Date
3 Sept 2026, 6:00 pmClosed
GE 872 EWS
GE 872 EWS PIN 913872 C/O 99 APO
PROVN OF 01 x GUN STORE ROOM, PROVN OF 01 x OPR STORE ROOM, PROVN OF SENTRY POST NEAR MAIN OFFICE COMPLEX, SPL REPAIRS TO BLDG NO CHDH OWT-76 AND BLDG NO 29 (OJL SHELTER) AT SIGAR MIL STN UNDER GE 872 EWS
2026_MES_784317_1
8868/E8
Open Tender
Civil Works
Item Rate
180 days
SIGAR
All as per NIT and Tender documents
7 documents required · 7 mandatory
₹500
GE 872 EWS
₹93,200
14 Sept 2026
13 Aug 2026
5 Sept 2026
13 Aug 2026
3 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and disposal of debris and rubbish complete all as specified and directed. | 244 | Sqm | - | - |
| 2 | Demolition of un-reinforced cement concrete in ground floors and pavings n.exc 15cm thickness, (Below or above Ground level) and disposal of debris and rubbish to a distance complete all as directed by the Engr-in-Charge | 25.3 | Cum | - | - |
| 3 | Demolition/Dismantling of stone slabs /paver Blocks and tiles of any description or thickness laid bedded and pointed in any mortar in floors , aprons etc. and clean the surface to receive screed bed to lay new tiles complete all as directed and directed | 2.76 | 10sqm | - | - |
| 4 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 1 | Cum | - | - |
| 5 | Taking down chowkats or frame, n.exc 1.5 Sqm each with shutters (without taking off shutter from the frame) complete all as specified and directed. | 7 | Each | - | - |
| 6 | Taking down chowkats or frames, exc 1.5 but n.exc. 4 Sqm in each with shutter (without taking off shutter from the frame) complete all as specified and directed. | 12 | Each | - | - |
| 7 | Taking down shutters of any descriptions exc. 1 sqm and n exc 2 sqm each and removing from site complete all as specified & directed. | 2 | Each leaf | - | - |
| 8 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water and removing rubbish complete all as specified and directed | 23.04 | Sqm | - | - |
| 9 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, in roof covering including ridges and keeping serviceable sheets in safe custody for reuse in the work complete as directed. | 247.74 | Sqm | - | - |
| 10 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3.3 | Qtl | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender8868.pdf
Tender Documents • 1.48 MB
BOQ_878796.xls
BOQ • 0.50 MB
corr.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .