Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹28,626
Closing Date
27 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE
AE, LID AND EW OFFICE, MAVOOR GP
DRINKING WATER
2024_LSGD_646670_2
AE/LSGD/ETENDER/MAVOOR/2023-23
Open Tender
Civil Works - Water Works
Item Rate
240 days
MAVOOR
9 documents required · 9 mandatory
₹2,760
Yes
₹28,626
Yes
22 Feb 2024
19 Jan 2024
29 Jan 2024
19 Jan 2024
27 Jan 2024
19 Jan 2024
Amount
KACHERIKUNNU WELL
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD144716/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 9.00-10.5m
OD144760/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 7.50 -9.00m
OD144761/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 6.00-7.50 m
OD144762/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 4.50-6.00m
OD144763/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 3.00 - 4.50 m
9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
OD219208/2023-2024: Demolishing laterite work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer in charge . In cement mortar
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos Sheet
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD261060/2023-2024: Providing and fixing 1mm thick M.S.sheet door with frame of 40x40x6 mm angle iron and 3mm M.S gueset plates at the junction and corners, all necessary fittings complete, including applying a priming coat of approved steel primer using MS angle 40x40x6 mm for diagonal braces
10.25.1:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
OD344297/2023-2024: Providing and fixing 0.35mm or nearest size thick powder coated GI Trafford sheet of good quality upto any pitch including fixing J or L hooks, bolts etc complete excluding purlins , rafters etc complete ( Modified DAR 12.1.1 )
PAZHAMPALLY COMMUNITY IRRIGATION
9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
PUNATHIL MEETHAL WELL
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD314146/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 3.00 - 4.50 m
OD314145/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 4.50-6.00m
OD314144/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 6.00-7.50 m
OD314143/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 7.50 -9.00m
OD314142/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 9.00-10.5m
OD314168/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 10.5-12 m
OD314167/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 12-13.5 m
OD314166/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 13.5-15 m
OD315762/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 15.00-16.5 m
OD315779/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 16.50-18.00m
OD315778/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 18.00-19.50 m
OD315777/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 19.50-21.00 m
OD315776/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 21.00-22.50 m
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
OD314212/2023-2024: Demolishing laterite work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer in charge . In cement mortar
OD314211/2023-2024:well steining -Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.( MODIFIED OD 50.6.7.1 )
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
GMUP SCHOOL WELL
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD314080/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 3.00 - 4.50 m
OD314079/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 4.50-6.00m
OD314078/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 6.00-7.50 m
OD314077/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 7.50 -9.00m
OD314076/2023-2024: Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 9.00-10.5m
OD314200/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 10.5-12 m
OD314199/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 12-13.5 m
OD314198/2023-2024:Extra for additional lift 1.5m or part there of in excavation / banking excavated or stacked materials: 13.5-15 m
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
MANNINGATHODI WELL
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD344105/2023-2024:Demolishing Laterite masonary work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. i)In cement mortar
OD344104/2023-2024:Well steining - Laterate masonry with neatly dressed laterate stone of size 40x20x15 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.(MODIFIED OD 50.6.7.1)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
OD344175/2023-2024:DR WITH DEPARTMENTAL STONE-Dry rubble masonry without concrete levelling course using departmental rubble including packing to lines and levels, labour charges etc complete as per direction of engineer in charge
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
10.25.1:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
ALAVIEM
Bidder Name
ALAVIEM
Haneefa
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_991270.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .