Loading…
Loading…
Tender ID
Tender Value
₹8.6 L
EMD Value
₹9,000
Closing Date
25 May 2026, 5:00 pmClosed
Deputy Executive Engineer, Irrigation Sub Division, Kodinar
Repairs to H.R. gates at main Canal BC of Left bank canal system of shingoda irrigation scheme.
305448
Tender Notice No-1 2026-27
Open
Civil - All
Works
Gir Somnath
6 documents required · 6 mandatory
₹900
Executive Engineer,Gir Somnath Irrigation Division,Veraval
₹9,000
16 May 2026
16 May 2026
16 May 2026
25 May 2026
16 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Dismentalling stone/brick masonry & 68.90 Cum 616.00
stacking of useful and unuseful
material from the dismentalled
materials as directed etc complete.(a)
In cement mortar
2 Providing &Laying in position 63.40 Cum 3544.00
controlled cement concrete
usingcement sand & crushed metal
aggregate by machine mix incl.
necessary formworks ,compaction by
mechanical vibrator curing as directed
with all lead and lift etc
complete.Excluding the cost of steel .
(Concrete grade M-15 and MSA-
40mm(Graded) For foundation
3 Providing & Laying in position 44.700 Cum 5103.00
controlled cement concrete using
cement sand & crushed metal
aggregate by machine mix incl.
necessary formworks compaction by
mechanical vibratoer curing as
directed with all lead and lift etc
complete. Excluding the cost of
steel.(Concrete grade M-20 and MSA-
40mm(Graded). For pier concrete
4 Prov. & Laying. in position controlled 2.900 Cum 5666.00
cement concrete using cement,sand
and crushed metal aggregate by
machinemix for R.C.Cwork incl.
necessary formworks centering
scaffolding compaction by mechanical
vibrator,curingasdirectedwithall
lead& lift etc complete Excluding the
cost of reinforcement 1/e) Concrete
grade M-20 and MSA-20mm (Graded)
5 Provinding,cutting,bending,binding 1.200 MT 76574.00
and fixing in position as per drawing
T.M.T BAR reinforcement for R.C.C.
works and anchor bars incl cost of
black annealed 16 to 18 BWS M.S. Wire
etc.complete with all lead and lift B)
6 Providing & Fixing H.R. & C.R. gates for 591.520 Kg. 89.00
canal including all materials , labours,
fabrication transporting fixing to site
of work all lead & lift including one
coat of primer and two coats of oil
painting as directed including square
threaded screw, bearing, nuts,
handles, and locking arrangements
7 Clearing the canal by 1.525 Km 26329.00
cleaning/removing the thick
weed,shrubs and all other vegetations
including silt upto 10cm thickness,
stones,debris etc from canal bed and
side slope of canal upto outer toe of
canal bank and deposing as directed
8 Clearing the canal by 960.750 Cum 166.00
cleaning/removing the thick
weed,shrubs and all other vegetations
including silt upto 10cm thickness,
stones,debris etc from canal bed and
side slope of canal upto outer toe of
canal bank and deposing as directed a.
I/We am/are willing to carry out the work at… % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 10 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer,
Irrigation Sub Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Repair-H.R. gate bc Tender.pdf
2.BOQ.pdf
3.Tender Notice No.1 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .