Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹54.9 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹56.7 L+₹1.8 L (3.24%)Rejected-AOC KAREDATH H KIDANGOOR P O ANGAMALY PIN 683572 | ANGAMALY | ERNAKULAM | KERALA | 683572 | 2 | Rejected-AOC 2 | |
| 3 | 3₹59.1 L+₹4.2 L (7.65%)Rejected-AOC | 3 | Rejected-AOC 3 | |
| 4 | 4₹59.5 L+₹4.6 L (8.40%)Rejected-AOC | 4 | Rejected-AOC 4 |
| Sl No | Description | Qty | Unit | K. K. YACOB L3 | V. JOY L1 | JOY KURIAN L2 | BABY M J L4 |
|---|---|---|---|---|---|---|---|
| 1.00Reactive Maintenance (Initial Rectification Work) | |||||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 46.02 | cum | 2,246.56 ₹1,03,382.2 | 2,192.82 ₹1,00,909.19 Lowest | 2,302.85 ₹1,05,972.55 | 2,377.05 ₹1,09,387.09 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 8 | cum | 2,323.28 ₹18,586.24 | 2,267.72 ₹18,141.76 Lowest | 2,381.5 ₹19,052 | 2,458.24 ₹19,665.92 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 6.02 | cum | 5,578.37 ₹33,570.63 | 5,444.95 ₹32,767.71 Lowest | 5,654.62 ₹34,029.5 | 5,902.4 ₹35,520.64 |
| 1.00 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 40 | cum | 3,203.91 ₹1,28,156.4 | 3,127.28 ₹1,25,091.2 Lowest | 3,247.7 ₹1,29,908 | 3,390.01 ₹1,35,600.4 |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 8 | cum | 12,523.04 ₹1,00,184.32 | 12,223.51 ₹97,788.08 Lowest | 12,694.19 ₹1,01,553.52 | 13,250.46 ₹1,06,003.68 |
| 1.01 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | 150 | sqm | 5.41 ₹811.5 | 5.28 ₹792 Lowest | 5.48 ₹822 | 5.72 ₹858 |
| 1.01 | 10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material | 730 | sqm | 541.06 ₹3,94,973.8 | 528.12 ₹3,85,527.6 Lowest | 548.45 ₹4,00,368.5 | 572.49 ₹4,17,917.7 |
| 1.01 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 18 | cum | 3,209.46 ₹57,770.28 | 3,132.69 ₹56,388.42 Lowest | 3,289.88 ₹59,217.84 | 3,395.89 ₹61,126.02 |
| 1.01 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | 6 | cum | 3,156.16 ₹18,936.96 | 3,080.68 ₹18,484.08 Lowest | 3,199.3 ₹19,195.8 | 3,339.49 ₹20,036.94 |
Tender Value
₹64.1 L
EMD Value
₹50,000
Closing Date
7 Sept 2026, 2:00 pmClosed
EXECUTIVE ENGINEERPWD ROAD DIVIISON, ERNAKULAM
EXECUTIVE ENGINEERPWD ROAD DIVIISON, ERNAKULAM
Please see the tender documents and NIT for work details
2026_PWD_866864_1
PWD/RB/TR/3948/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
360 days
Angamaly
Please see the tender documents and NIT for work details
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
16 Oct 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
31 Aug 2026 - 7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reactive Maintenance (Initial Rectification Work) | |||||
| 1.001 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | - | cum | - | - |
| 1.002 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | - | cum | - | - |
| 1.003 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 1 | cum | - | - |
| 1.004 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | - | cum | - | - |
| 1.005 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | - | cum | - | - |
| 1.006 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | - | sqm | - | - |
| 1.007 | 10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material | - | sqm | - | - |
| 1.008 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | - | cum | - | - |
| 1.009 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1467564.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BID.pdf
Tender Documents • 1.65 MB
BOQ_1467564.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .