Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | -46.00% | ₹4.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.6 L+₹32,552 (7.59%)Admitted-Finance | -41.90% | ₹4.6 L+₹32,552 (7.59%) | L2 | Admitted-Finance |
| 3 | L3₹4.7 L+₹39,697.57 (9.26%)Admitted-Finance | -41.00% | ₹4.7 L+₹39,697.57 (9.26%) | L3 | Admitted-Finance |
| 4 | L4₹4.8 L+₹55,576.59 (13.0%)Admitted-Finance | -39.00% | ₹4.8 L+₹55,576.59 (13.0%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Finance | - | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹7.9 L
EMD Value
₹15,900
Closing Date
16 May 2026, 3:00 pmClosed
Executive Engineer PMGSY Division Rajouri
Executive Engineer PMGSY Division Rajouri
Permanent Restoration of road from L027-T01 Km 13th to Thus Under SASKI Rajouri
2026_JKRRD_147556_12
EE/PMGSY/R/14 OF 2026-27 Dt.09.05.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PMGSY Division Rajouri
₹15,900
22 May 2026
11 May 2026
16 May 2026
11 May 2026
16 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 42 | Cum | 256.85 | ₹10,787.7 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.28 | Cum | 4,826.5 | ₹25,483.92 |
| 3 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of
Engineer -in - charge. | 19.8 | Cum | 218.4 | ₹4,324.32 |
| 4 | Random Rubble masonry with hard stone in superstructure above plinth
level and upto floor five level, including levelling up with cement concrete
1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm
nominal size) and curing complete at window sills, ceiling level and the
like:Cement mortar 1:6 (1 Cement : 6 coarse sand) | 81 | Cum | 6,857.45 | ₹5,55,453.45 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. | 34.84 | Cum | 3,262.1 | ₹1,13,651.56 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 4.45 | Cum | 8,422.45 | ₹37,479.9 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 13.2 | Sqm | 286.35 | ₹3,779.82 |
| 8Carriage/consumption of material | |||||
| 8.1 | Sand for an average distance of 140 km by MT | 3.5 | Cum | 1,734.74 | ₹6,071.59 |
| 8.2 | Aggregate 40 mm normal size for an average distance of 17 km by MT | 6.6 | Cum | 370.67 | ₹2,446.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_230295.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .