| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | ₹6.2 L | L1 | Accepted-AOC Ag No 01/EE/2026-27 |
| 2 | L2₹6.2 L+₹1,270.54 (0.20%)Rejected-Finance | ₹6.2 L+₹1,270.54 (0.20%) | L2 | Rejected-Finance Reject In Financial Bid L2 |
| Sl No | Description | Qty | Unit | MEHFOOZ HASAN CONTRACTIOR L2 | M/S SUBHASH CHAND CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches | 244.41 | cum | 109 ₹26,640.69 Lowest | 110 ₹26,885.1 |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 10.78 | cum | 5,985.7 ₹64,525.85 | 5,980 ₹64,464.4 Lowest |
| 3.00 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 14.72 | cum | 6,465.5 ₹95,172.16 | 6,451 ₹94,958.72 Lowest |
| 4.00 | First class B/W in 1:3 cement ,coarse sand mortar i/c cost of material,lobour and T&P etc complete. | 19.66 | cum | 5,713 ₹1,12,317.58 | 5,711 ₹1,12,278.26 Lowest |
| 5.00 | Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 79.25 | Rm | 605 ₹47,946.25 | 601 ₹47,629.25 Lowest |
| 6.00 | Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 62.5 | Rm | 329.1 ₹20,568.75 Lowest | 330 ₹20,625 |
| 7.00 | Centering shuttering for P.c.c work I/C all type of material and Labour , T&P filter etc complete | 114.47 | Sqm | 244 ₹27,930.68 Lowest | 245 ₹28,045.15 |
| 8.00 | 12mm. Thick plaster with 1:4 of approved coarse sand including supply of all materials labour and completion of work.Including making of groove in plaster surface. | 50.6 | Sqm | 155.1 ₹7,848.06 Lowest | 156 ₹7,893.6 |
| 9.00 | Earth work in filling upto 600 m lead for minor in all type of soil i/c cost of earth, ramminh, dressing, labour T&P etc. | 1,100 | cum | 201 ₹2,21,100 | 200 ₹2,20,000 Lowest |
Tender Value
₹6.3 L
EMD Value
₹12,500
Closing Date
2 Apr 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 02 CONSTRUCTION OF 20 NO OUTLETS OF JATPURA MINOR FROM KM 0.00 TO KM 4.800 OF M.G.C STAGE-II
2026_UPIDC_1123188_15
02/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹12,500
16 Jun 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches | |||||
| 2Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | |||||
| 3Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | |||||
| 4First class B/W in 1:3 cement ,coarse sand mortar i/c cost of material,lobour and T&P etc complete. | |||||
| 5Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | |||||
| 6Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | |||||
| 7Centering shuttering for P.c.c work I/C all type of material and Labour , T&P filter etc complete | |||||
| 812mm. Thick plaster with 1:4 of approved coarse sand including supply of all materials labour and completion of work.Including making of groove in plaster surface. | |||||
| 9Earth work in filling upto 600 m lead for minor in all type of soil i/c cost of earth, ramminh, dressing, labour T&P etc. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
LOT02.pdf
Tender Documents • 2.98 MB
LOT01Retender.pdf
Additional Documents • 0.49 MB
BOQ_2109854.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .