| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 CrAdmitted-Finance FLAT NO 1 SAMATA CHS SECTOR NO 7 SHREENAGAR THANE W 400604 | THANE | MAHARASHTRA | 400604 | ₹4.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹4.5 CrAdmitted-Finance PLOT NO 46 SECTOR 19C GEOSTAR SADAN VASHI NAVI MUMBAI MAHARASHTRA 400703 UDYAM MH 33 0068037 | THANE | MAHARASHTRA | 400703 | ₹4.5 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 402 MADHAVA PLOT NO C 4 E BLOCK BANDRA KURLA COMPLEX BANDRA EAST MUMBAI MAHARASHTRA 400051 | MUMBAI SUBURBAN | MAHARASHTRA | 400051 | - | - | Not Admitted-Fee/PreQual/Technical Others-EMD not as per Tender Document |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting NIT criteria |
| Sl No | Description | Qty | Unit | GEOSTAR SURVEYS INDIA PVT LTD L3 | M/s. S and R Geotechniques Pvt.Ltd. L1 | RENUKA CONSULTANTS (EXPLORERS AND DESIGNERS) PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Mobilisation and demobilisation of not limited to Jackup Barge, Tugs, boats crew transfer vessels including suitable boring and drilling plant and all other allied equipment like boring rigs, all other in-situ tests equippments, and all equipment necessary to do the work under scope of this contract etc. including all skilled and non-skilled personnel required for the work etc. complete and demobilisation of same on completion and removal from site (CONTRACTOR to mobilise sufficient equipment to the site in order to complete the work within the stipulated time-frame.) Drilling rigs must be capable of vertical drilling through all kinds of soils and all types of soft to hard basaltic / Granite rock all as per specification & drawing and as directed by the Engineer-in-charge.
Notes:
1. The item cost is also inclusive of the cost required for mobilization & de-mobilization from nearest sea port or jetty to proposed loaction & vice-versa. No seperate claim shall be entertained for the same.
2. Whenever the delivery of Services and incidental Goods/ Works requires the contractor to obtain permits, approvals, and licenses from local public authorities, it shall be the contractor's sole responsibility to obtain these and keep these current and valid. Such requirements may include but not be restricted to licences or environmental clearance if required. If requested by the contractor, the Procuring Entity shall make its best effort to assist the contractor in complying with such requirements in a timely and expeditious manner, without any dilution of the Contractor’s responsibility in this regard. | 1 | Job | 1,65,00,000 ₹1.6 Cr | 1,80,00,000 ₹1.8 Cr | 1,35,00,000 ₹1.4 Cr |
| 2.00 | Setting up of Jack up Barge at each borehole location, from Low tide line to 700m inside sea(offshore), at BARC Visakhapatnam site and movement from each borehole location only once for each borehole location including moves between borehole position, locating using DGPS upto accuracy of +/-5m including crew transfer and all the movement of the team from noshore to marine environment as per the drawing and as directed by the Engineer-in-charge.
Note:
1. Total 13 Nos. of setting of boring rigs locations are for individual boreholes locations as per drawings (issued to successful bidders). From LTL to 700m length equidistance 10 Bore holes(BH) & 3 BH at 700 distance offshore for intake structure. At least One BH shall be of 60m deep from sea bead rest all upto 30m depth from sea bed. | 13 | Nos. | 97,500 ₹12.7 L | 1,25,000 ₹16.3 L | 5,60,000 ₹72.8 L |
| 3.00Boring vertically through all kinds of soils, weathered rock and soft rock, boulders, if any met with suitable and adequate equipment of diameter 116 / 150 mm or more during drilling, for the depth as measured below existing ground level. | ||||||
| 3.01 | 0-10m from sea bed | 80 | RM | 7,750 ₹6.2 L | 6,500 ₹5.2 L | 20,500 ₹16.4 L |
| 3.02 | 10-20m from sea bed | 40 | RM | 8,750 ₹3.5 L | 7,000 ₹2.8 L | 7,500 ₹3 L |
| 3.03 | 20-30m from sea bed | 20 | RM | 9,500 ₹1.9 L | 7,500 ₹1.5 L | 4,500 ₹90,000 |
| 4.00Drilling vertically through bedrock strata (Hard rock), using Nx size diamond bit, using double tube core barrel with suitable core catcher, including collection and logging of cores, placing them in approved core boxes made of Fibre Reinforced polymer of standard size, numbering and indexing each core, noting the lithology, colour photographs (100X150mm size) of rock cores, locking arrangements, labeling and transporting the boxes to core store/laboratory for the following depths measured from existing ground level all as per with requirements as per IS:4078 and as directed by Engineer In Charge. | ||||||
| 4.01 | 0m to 20m from sea bed | 130 | RM | 7,950 ₹10.3 L | 8,000 ₹10.4 L | 18,500 ₹24.1 L |
| 4.02 | 20m to 40m from sea bed | 45 | RM | 9,250 ₹4.2 L | 8,500 ₹3.8 L | 19,500 ₹8.8 L |
| 4.03 | 40m to 60m from sea bed | 10 | RM | 11,750 ₹1.2 L | 9,000 ₹90,000 | 20,500 ₹2.0 L |
Tender Value
₹4.8 Cr
EMD Value
₹11.3 L
Closing Date
3 Oct 2025, 3:30 pmClosed
Chief Engineer, BARC, Visakhapatnam
UC-1 Annex office, BARC(V) main campus, Gajuwaka - Yellamanchili Road, Maduturu Sub Post Office, Visakhapatnam- 531 011
Marine Geotechnical investigations for effluent discharge Jetty and other miscellaneous works at BARC main campus, Atchutapuram, Near Visakhapatnam, A.P.
2025_BARC_868505_1
BARC(V)/CES/MarineGeotech/185 Dated 10.07.2025
Open Tender
Civil Works - Others
270 days
Atchutapuram, Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹11.3 L
Atchutapuram, Visakhapatnam
19 Jan 2026
11 Jul 2025
10 Oct 2025
11 Jul 2025
3 Oct 2025
15 Sept 2025
11 Jul 2025 - 1 Aug 2025
1 Aug 2025
Amount
Mobilisation and demobilisation of not limited to Jackup Barge, Tugs, boats crew transfer vessels including suitable boring and drilling plant and all other allied equipment like boring rigs, all other in-situ tests equippments, and all equipment necessary to do the work under scope of this contract etc. including all skilled and non-skilled personnel required for the work etc. complete and demobilisation of same on completion and removal from site (CONTRACTOR to mobilise sufficient equipment to the site in order to complete the work within the stipulated time-frame.) Drilling rigs must be capable of vertical drilling through all kinds of soils and all types of soft to hard basaltic / Granite rock all as per specification & drawing and as directed by the Engineer-in-charge. Notes: 1. The item cost is also inclusive of the cost required for mobilization & de-mobilization from nearest sea port or jetty to proposed loaction & vice-versa. No seperate claim shall be entertained for the same. 2. Whenever the delivery of Services and incidental Goods/ Works requires the contractor to obtain permits, approvals, and licenses from local public authorities, it shall be the contractor's sole responsibility to obtain these and keep these current and valid. Such requirements may include but not be restricted to licences or environmental clearance if required. If requested by the contractor, the Procuring Entity shall make its best effort to assist the contractor in complying with such requirements in a timely and expeditious manner, without any dilution of the Contractor’s responsibility in this regard.
Setting up of Jack up Barge at each borehole location, from Low tide line to 700m inside sea(offshore), at BARC Visakhapatnam site and movement from each borehole location only once for each borehole location including moves between borehole position, locating using DGPS upto accuracy of +/-5m including crew transfer and all the movement of the team from noshore to marine environment as per the drawing and as directed by the Engineer-in-charge. Note: 1. Total 13 Nos. of setting of boring rigs locations are for individual boreholes locations as per drawings (issued to successful bidders). From LTL to 700m length equidistance 10 Bore holes(BH) & 3 BH at 700 distance offshore for intake structure. At least One BH shall be of 60m deep from sea bead rest all upto 30m depth from sea bed.
Boring vertically through all kinds of soils, weathered rock and soft rock, boulders, if any met with suitable and adequate equipment of diameter 116 / 150 mm or more during drilling, for the depth as measured below existing ground level.
0-10m from sea bed
10-20m from sea bed
20-30m from sea bed
Drilling vertically through bedrock strata (Hard rock), using Nx size diamond bit, using double tube core barrel with suitable core catcher, including collection and logging of cores, placing them in approved core boxes made of Fibre Reinforced polymer of standard size, numbering and indexing each core, noting the lithology, colour photographs (100X150mm size) of rock cores, locking arrangements, labeling and transporting the boxes to core store/laboratory for the following depths measured from existing ground level all as per with requirements as per IS:4078 and as directed by Engineer In Charge.
0m to 20m from sea bed
20m to 40m from sea bed
40m to 60m from sea bed
Obtaining 90mm diameter, 450mm long undisturbed soil samples (UDS) from boreholes at every change in stratum or for every 1.5m stratum depth, whichever is less, as per IS:2132, WITH JARRING LINK and sealing and labelling the container & to be tested in site laboratory used for determining various parameters all as per specifications and as directed by Engineer-In-charge.
Conducting Downhole Standard Penetration Tests (SPT) in boreholes as specified at offshore locations at every change in stratum or 1.5m, whichever is less, all as per IS:2131 / ASTM D 1586, and collecting, packaging and labelling disturbed soil/rock samples above and with a part of the distrubed soil samples from SPT sampler to be coated with paraffin wax and sealed immediately after collection to completely retain all moisture within the sample (to be used in laboratory for Grain Sieve Analysis, hydrometer or pipette analysis, Liquid Limit, Plastic Limit, Plastic Index, Specific Gravity, chemical analysis and any other tests), and other part of the sample to be collected, packaged, sealed, labelled and to be placed in core boxes all as per specifications and as directed by Engineer-In-Charge.
Conducting downhole Standard Penetration Tests (SPT) as specified at offshore locations, at every change in stratum or 1.5m, whichever is less, all as per IS:2131 / ASTM D 1586, storing the samples in the plastic tubes for the cohesive samples, or as directed by Engineer-In-charge.
Conducting Standard Penetration Tests (SPT) as above in rock with RQD greater than 10% and less than up to 25% as per IS:2131, including replacement of SPT shoe by a new SPT shoe for each SPT all as per specifications and as directed by Engineer-In-Charge.
Conducting Double Packer Cyclic Permeability test in weathered and hard rock upto maximum effective pressure of 10Kg/sq.cm, for each rocky stratum or at depth corrosponding to RQD values of 25%, 50% and 75%, all as per IS:5529 (Part 2). Each unit of this item shall consist of a series of three tests with pressure of three(3) equal increments to the maximum and three(3) equal decrements etc., as per specificationsand as directed by Engineer-In- Charge.
Conducting Pressuremeter Test as per IS:12955 (Part 2)/ ASTM D4719 in NX size bore holes in specified boreholes for each soil stratum at specified depths in soil stratum as well as in weathered and hard rock at depths corresponding to each rocky strata preferably at interval of 5m as well as at depth corresponding to the RQD in the order of of 25%, 50% and 75% with Electronic Probe for a pressure upto 200bar or failure which occurs earlier and submitting parameters (like Deformation modulus, Elastic modulus, shear modulus, limiting pressure, Creep pressure, Coefficient of Elastic uniform compression and safe allowable bearing pressure, pile load capacity and associated settlements of foundations, piles and pile group etc. and all data required as mentioned in specifications), all as per specification and as directed by Engineer-In-charge.
In Soil and Weathered Rock (RQD less than 10%)
In Hard Rock
Conducting P-S Suspession logging in each bore hole (Total depth of each borehole~30m) at every 1m interval along with data interpretation and reporting, complete as per technical specifiaction & as directed by Engineer-In-charge. Excluding the cost of drilling.
Electric Cone Penetration Test (CPTu) as per ASTM D5778. To evaluate safe bearing capacity and settlement of cohessionless soil for undrained cohession clays. 'Note: CPTu to be conducted at specified locations as specified in drawing or as directed by Engineer in charge
LABORATORY TESTS
TESTS ON SOIL
Conducting grain sieve analysis of soil(Sieve analysis & Hydrometer analysis) and submission of grain size distribution curve as per IS:2720(Part-4) of the soil (SPT/UDS) samples and Classification of soil as per IS:1498 for every soil stratum in each borehole in alternate and staggered manner to represent each soil stratum. Sutability of Soil for various purpose shall be reported as directed by the Engineer In Charge. ** Note: Distribution curve, Cu, Cc, D50 and soil classification shall be mentioned in the report.
Grain Sieve analysis.
Hydrometer or Pipette analysis
Conducting tests for Atterberg/Consistency Limits (SPT/UDS) samples such as Liquid limits, Plastic limits, Plasticity Index, Shrinkage limits, Shrinkage ratio to represent each soil stratum and submission of reports complete geotechnical characterization and engineering properties of soil as per specifications and IS:2720(Part 5&6) and as directed by Engineer In Charge.
Liquid limit, Plastic Limit and Plasticity Index
Shrinkage limit and Shrinkage Ratio
Conducting Natural Moisture content, Bulk density, dry density, Specific gravity and void ratio of soil (SPT/UDS)samples to represent each soil stratum as per IS:2720 (Part 2 & Part 3 )and specifications and submission of test reports as directed by EIC.
Chemical analysis of undisturbed soil samples or disturbed SPT soil samples coated with wax including Total soluble solids, Organic matter, pH, total Soluble sulphates (as SO3 & SO4), chlorides, Nitrate Contents, chemical salinity and any other chemicals harmful to the foundation material as per IS:2720 (Part 21, 22, 26, 27) as per specifications and as directed by Engineer In Charge.
Same as in Item No. 14.04 above, but on 2:1 water:soil extract of the soil samples, giving sulphates as SO3 only.
Chemical analysis of sub soil water samples, including colour, odour, turbidity, pH, Specific conductivity at 25 deg. and carbonates, nitrate, organic matter, sulphates as SO3, chlorides, soluble salt content etc as per IS:3025 for one or more water samples collected from each boreholes and submission of report as per specifications and as directed by Engineer-In-Charge.
Consolidation tests on undisturbed soil samples or on soil samples representative to each soil stratum compacted to specified density, giving full test results including unit weights, specific gravity, e-log p curve, virgin curve, pre-consolidation pressure (P0), initial and final void ratios, compression index(Cc), coefficient of permeability(Cv), coefficient of compressibility(av) and coefficient of volume change(mv) and t50 or t90 for all pressure increments etc and settlement calculations as per IS: 2720 (Part-15) & as directed by Engineer-In-Charge. (Tests without presentation of lab test readings for individual load increments and consolidated report as per APPENDIX A and B of the IS:2720 (Part-15) and without these results the test shall not be paid.)
Unconfined Compressive Strength test on undisturbed soil samples of cohesive soils of each soil stratum as per IS:2720 (Part- 10) along with submision of report of compression strength, undrained shear strength and bearing capacity as directed by Engineer-In-Charge.
Conducting Direct shear test in consolidated drained condition on undisturbed soil samples or soil samples compacted to specified density and submiting full test report including lab readings of complete test, cohesion and angle of friction (CD test), shear strength etc. Tests to be conducted as per IS:2720 (Part-13) or as per IS:2720 (Part-39) for soils containing gravel) and as per direction of Engineer-In-Charge.
Conducting Triaxial Shear Strength Test on undisturbed soil samples or on soil samples compacted to specified density representative to each soil stratum. Tests to be conducted along with submission of test reports including lab observation readings, cohession and angle of internal friction, shear strength envelope, stress-strain behaviour, poissions ratio and elastic modulus as per specifications and IS:2720(Part-11&12) and as directed by Engineer-In-Charge.
Unconsolidated Undrained (UU, without pore water pressure measurement)
Consolidated Undrained (CU including pore water pressure measurement)
TESTS ON ROCK
Carrying out petrographic examination of rock sample as per ASTM: C-295 for determination of core recovery, rock quality designation and rock mass rating in each borehole, for each rock stratum and submission of test result as directed by EIC.
Conducting True Specific gravity of rock core samples corresponding to each rocky strata and submission of reports as per IS: 1122 and specifications as directed by Engineer-In-Charge.
Conducting water absorption of rock samples as per IS:1124 and specification as directed by Engineer-In-Charge.
Unit weight, water content, porosity, bulk density, dry density of rock sample corresponding to each rocky strata as per IS:13030 and specifications as directed by Engineer-In-Charge.
Conducting Unconfined compressive strength of rock core at depths corresponding to RQD=25%, 50% and 75% or corresponding to each rocky strata with submission of Unconfined compressive strength of intact rock as per procedure in IS:9143 and stress-strain curve, poissions raatio and deformation modulus as per IS:9221 and specification as directed by Engineer-In-Charge.
Point load strength index test on rock core at depths corresponding to RQD=25%, 50% and 75% or corresponding to each rocky strata as per IS:8764 and as per specifications as directed by Engineer-In-Charge.
Brazilian test on rock core at depths corresponding to RQD=25%, 50% and 75% or corrosponding to each rocky strata along with submittion of tensile strngth as per IS:10082 and as per specifications as directed by Engineer-In-Charge.
Conducting Triaxial compression test on rock core with internal pressure up to 160kg/sq.cm on minimum 3 samples with 3 different confining pressures, at depths corrosponding to RQD=25%, 50% and 75% or corrosponding to each rocky strata as per procedure in IS:13047or ASTM D 2664-86 and submission of report including cohession and angle of inter friction, shear strength envelope along with stress-strain curve, poissions raatio and deformation modulus as per specification as directed by Engineer in Charge.
BATHYMETRY SURVEY
Mobilization & Demobilization of suitable survey spread, positioning system (DGPS) and survey equipment as specified to commence the survey including personnel, travel cost of personnel, transportation of equipment etc. complete as per the scope of work.
Surveys for the following parametres including providing all vessels,tools, equipments, accessories, consumables, personnel etc by the contractor and completing the work in all respects inline with the Scope of Work. 1. Grid Survey at 10m grid intervals at within harbour (Approx Area 1.2KMx1.2KM) deploying DGPS, multibeam eco sounder, side scan sonar, sub bottom profiler and magnetometer as per the scope of work. 2. Cross line survey deploying single beam eco sounder and sub bottom profiler as per the scope of work. 3. Shallow water and topographic survey using total station at inter tidal zone.
Wave Measurement at Jetty Head location & along Pipe trestle approach route area for 90 Days as per IS:4651-Part-1 and technical specifications.
Current measurement at Jetty Head and along Pipe Trestle Route for 90 days as per IS:4651-Part-1 and technical specifications.
Tidal Measurement close to the survey area for 90 days. as per IS:4651-Part-1 and technical specifications.
Analysis and processing of all data collected and preparation of report including printing, compiling and submission of specified copies of final reports and preparation of soft copy of proposed report in relevant format and report drawing in AUTOCAD Incorporation of any comments in final report:Submission and acceptance of report thereof.
REPORT
Preparation and submission of Three (3) hard copies of Draft reports as specified followed by Five (5) hard copies of Final report of Geotechnical Investigations as detailed in specifications along with FIve (5) soft copies of the same in Pen-Drive along with bore hole location drawing in ".DWG" format. Field and laboratory record sheets shall also to be submitted. Note: Item cost is also inclusive of 5 Pen-Drives.
RENUKA CONSULTANTS (EXPLORERS AND DESIGNERS) PRIVATE LIMITED (BID ID -3292201)
GEOSTAR SURVEYS INDIA PVT LTD (BID ID -3284706)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 8.09 MB
BOQ.xls
BOQ • 0.11 MB
BOQ_2.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid