Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance VAYALUR | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
14 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/Chairman
IInd Floor, DRDA, Collectorate, Karur
Clean and Green villages in Package No TN 07 36 of K.Paramathi Block under AGAMT II 2021-2022 of Karur District
2022_RDTN_248806_9
Karur District - K.Paramathi Block-AGAMT-II 21-22
Open Tender
Civil Works
Item Rate
90 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,000
Yes
IInd Floor, DRDA, Collectorate, Karur
16 Sept 2022
26 Aug 2022
14 Sept 2022
26 Aug 2022
14 Sept 2022
26 Aug 2022
2 Sept 2022
Amount
Name of the Work : Providing fencing and faver block and lighting provision for newly forming MGNREGS Miyawaki Plantation in OSR Land of at Malayampalayam KPR nagar
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and fixing of fencing using R.C.C post 150x150and 2.10m height etc complete.
Supplying and fixing chain link fencing using 2'x2' - 10 gauge galvanized Iron wire etccomplete.
Providing Green Shde Net
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:4 mix Using 20mm thick Including All labour Charges Etc
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply & Fixing of Grill Gate
Sub Estimate for Walking Pathway
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer
Flooring with paver block(60mm)laid over interlocking blocks including cost and conveyance and all labour charges.
Providing fencing and Paver block and lighting provision for newly forming MGNREGS Murungai nursery Miyawaki Plantation in OSR Land of at Thennilai south Metro green park (SF No.539)
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and fixing of fencing using R.C.C post 150x150and 2.10m height etc complete.
Supplying and fixing chain link fencing using 2'x2' - 10 gauge galvanized Iron wire etccomplete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:4 mix Using 20mm thick Including All labour Charges Etc
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply & Fixing of Grill Gate
Sub Estimate for Walking Pathway
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer
Flooring with paver block(60mm)laid over interlocking blocks including cost and conveyance and all labour charges.
Providing Drainage with Vertical Soakpit @ M.G.R Nagar (10m) H/O Gudalur East
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with CM 1:5 mix Using 12mm thick Including All labour Charges Etc
Name of the Work : Sub Estimate Vertical Soakpit @ M.G.R Nagar H/O Gudalur East
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Cost and Supply of Cement Tank including all other charges..,
Cost of Supplying 225mm boluders including of all materials charges
Cost of Supplying 40mm boluders including of all materials
Cost of Supplying 20mm boluders including of all materials
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Painting two coats of Exterier Emulsion Paint Including All labour Charges Etc
Name of the Work : Providing Drainage with Vertical Soakpit @ Selva Nagar (68m) H/O Gudalur East
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with CM 1:5 mix Using 12mm thick Including All labour Charges Etc
Sub Estimate Vertical Soakpit @ Selva Nagar H/O Gudalur East
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Cost and Supply of Cement Tank including all other charges..,
Cost of Supplying 225mm boluders including of all materials charges
Cost of Supplying 40mm boluders including of all materials
Cost of Supplying 20mm boluders including of all materials
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Painting two coats of Exterier Emulsion Paint Including All labour Charges Etc
Name of the Work : Providing Drainage with Vertical Soakpit @ Kodanthur H/O Kodanthur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with CM 1:5 mix Using 12mm thick Including All labour Charges Etc
Sub Estimate Vertical Soakpit @ Kodanthur H/O Kodanthur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Cost and Supply of Cement Tank including all other charges..,
Cost of Supplying 225mm boluders including of all materials charges
Cost of Supplying 40mm boluders including of all materials
Cost of Supplying 20mm boluders including of all materials
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Painting two coats of Exterier Emulsion Paint Including All labour Charges Etc
Name of the Work : Providing fencing and Green shade provision for newly forming MGNREGS at Kodanthur (SF No.1009B)
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
RCement concrete 1:1.5:3 mix using 20mm metals including cost and conveyence of all mterials to site
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Supplying and fixing of fencing using R.C.C post 150x150and 2.10m height etc complete.
Supplying and fixing chain link fencing using 2'x2' - 10 gauge galvanized Iron wire etccomplete.
Providing Green Shde Net
Painting two coats of Exterier Emulsion Paint Including All labour Charges Etc
Supply & Fixing of Grill Gate
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Palanisamy S
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .