Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 38 2406 A2 MITHRALAYAM A V GEOEGE ROAD KALOR ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically Qualified |
Tender Value
Refer Docs
EMD Value
₹10,295
Closing Date
31 May 2026, 4:00 pmClosed
MANAGING DIRECTOR
STEEL INDUSTRIALS KERALA LTD.SILK Nagar, Athani P. O., Mulamgunnathukavu,Thrissur - 680 581, Kerala, India.
Supply, Installation and Commissioning of Tyre changing equipment for PV and LCV as per the technical specifications and detailed scope for RVSF at SILK Steel Fabrication Unit, Cherthala, Alappuzha and SILK Ship Building Unit, Azhikkal, Kannur
2026_SILK_849706_2
SILK/RVSF/SBUA/SFU/2026-27/18
Open Tender
Miscellaneous Works
Item Rate
35 days
Cherthala
As per the tender documents
11 documents required · 11 mandatory
₹972
₹10,295
17 Jun 2026
21 May 2026
1 Jun 2026
21 May 2026
31 May 2026
21 May 2026
21 May 2026 - 31 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1STEEL FABRICATION UNIT, CHERTHALA, ALAPPUZHA, KERALA | |||||
| 1.01 | Supply, Installation, Commissioning and Performance Demonstration of Tyre changing equipment for Passenger Vehicle (PV) and Light Commercial Vehicle (LCV) as per the technical specifications and detailed scope | 1 | set | - | - |
| 1.02 | First year AMC (after the warranty period of 2 years as per the tender conditions) | 1 | LS | - | - |
| 1.03 | Second year AMC (after the warranty period of 2 years and 1 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 1.04 | Third year AMC (after the warranty period of 2 years and 2 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 2SHIP BUILDING UNIT, AZHIKKAL, KANNUR, KERALA | |||||
| 2.01 | Supply, Installation, Commissioning and Performance Demonstration of Tyre changing equipment for Passenger Vehicle (PV) and Light Commercial Vehicle (LCV) as per the technical specifications and detailed scope | 1 | set | - | - |
| 2.02 | First year AMC (after the warranty period of 2 years as per the tender conditions) | 1 | LS | - | - |
| 2.03 | Second year AMC (after the warranty period of 2 years and 1 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 2.04 | Third year AMC (after the warranty period of 2 years and 2 year AMC period as per the tender conditions) | 1 | LS | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
COMPLIANCEMATRIX.pdf
Additional Documents • 0.24 MB
GCC.pdf
Tender Documents • 0.66 MB
TECHNICALSPECIFICATION.pdf
Additional Documents • 0.27 MB
TENDERENQUIRY.pdf
Additional Documents • 0.32 MB
BOQ_1439980.xls
BOQ • 0.28 MB
849706D.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .