Chief Engineer and Dy Chief Executive CED PD EP
O/o Chief Engineer 2nd Floor Sarathi Building NFC Hyderabad 500062
Design, Engineering, SITC of Substation Automation system with SCADA for Power distribution system at NFC, Kota
2026_NFC_926989_1
NFC/EP/12/2026
Open Tender
Electrical Works
Works
NFC Kota
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹19 L
21 Sept 2026
21 Sept 2026
28 Oct 2026
21 Sept 2026
24 Oct 2026
7 Oct 2026
22 Sept 2026 - 5 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Local SCADA System at SS-03:
SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Substation : SS-03. complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete | 1 | Lot | - | - |
| 2 | Local SCADA System at SS-04:
SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Substation : SS-04. complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete | 1 | Lot | - | - |
| 3 | Local SCADA System at LC-01:
SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : LC-01. complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete | 1 | Lot | - | - |
| 4 | Local SCADA System at LC-02:
SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : LC-02 complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete | 1 | Lot | - | - |
| 5 | Local SCADA System at LC-03:
SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : LC-03 complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete | 1 | Lot | - | - |
| 6 | Local SCADA System at ETP-LC:
SITC of Substation Automation System (SAS) with Standalone Substation Controller (Data Concentrator/ Remote Terminal Unit/PLC ) along with required no of I/Os, Operator Workstation as Client to CCR servers , Station Edge Switches & other integrating hardwares and required furnitures as given in Technical Specification, along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs, AIs etc from all equipments as listed in Annexure-III of Technical Specification and the substation controller in Load Centre : ETP-LC complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items including transportation complete | 1 | Lot | - | - |
| 7 | SITC of required I/O modules and Interfacing modules to existing PLC system and integrating the data to existing Local SCADA Software along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs from 1Nos of LT-PCC panel as listed in Technical Specification and PLC panel in Substation : SS02-M01. complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items and complete | 1 | Lot | - | - |
| 8 | SITC of required I/O modules and Interfacing modules to existing PLC system and integrating the data to existing Local SCADA Software along with all associated interconnecting cabling among all numerical relays, MFMs, DIs, DOs from 1 Nos of LT-PCC panel as listed in Technical Specification and PLC panel in Substation : SS02-M02 . complete as per scope of work detailed in Technical Specification.
Note: Rate shall be inclusive of all equipment required for testing & commissioning of these items and complete | 1 | Lot | - | - |
| 9 | Establishment of CCR and Integration of 10 no of Substations
SITC of High-Availability (Hot-Standby) server pair , Long-Term Historian & Archiving Storage , IT/Domain Controller, Engineering Workstation- 1 Nos , Operator Work Stations - 2 Nos, Giant LED screen/ Videowall, GPS master time server, firewall, parallel redundant UPS, Printer-1 No, Laptop-2 Nos, SCADA software including licenses, Managed Core Ethernet Switches, Edge Switches at 4 locations and other integrating hardwares and associated interconnecting cabling as per scope of work detailed in technical specification for integrating data from 6 nos of substation nodes with new Substation Automation Systems (SAS) under this project and 4 nos of substation nodes with already existing PLC based SAS panel to the Central Control Room (CCR) complete as per technical specification.
Note: Rate shall be inclusive of all furnitures such as PC & printer tables as required, chairs, UPS rack, trolley, supply of mandatory spares etc, transportation, all labour and materials | 1 | Lot | - | - |
| 10Supply, laying, testing, and commissioning (SITC) of 12-Core, industrial-grade, loose-tube, jelly-filled, Corrugated Steel Tape (CST) armored, Single-Mode Fiber (SMF) Optic Cable with an FRLS/HDPE outer sheath and compliant with ITU-T G.652.D. The scope includes laying the cable in HDPE pipes through existing trenches, and overhead cable trays, including all requisite pulling, dressing, clamping, End-to-End Termination & Splicing and necessary cable identification tags between all station switches at each substation nodes and managed core ethernet switches at Central Control Room (CCR) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.17 MB
Tendernotice_2.pdf
PDF • 0.04 MB
Tendernotice_3.pdf
PDF • 0.29 MB
Tendernotice_4.pdf
PDF • 3.32 MB
Tendernotice_5.pdf
PDF • 1.49 MB
Tendernotice_6.pdf
PDF • 1.04 MB
BOQ_974150.xls
BOQ • 0.26 MB
Technicalbid2.xls
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .