Loading…
Loading…
Found 4 active tenders
4 results • Latest
Preventive Maintenance of Ventilation system at NFC KOTA
Preventive Maintenance(PM) of Centrifugal Blowers : Frequency : Quarterly (once in 3 months) PM works involves tbe following: a) Ensure Drive V-Belts tension (if reqd, adjust motor) b) Replace damaged V-belts c) Ensure coupling in good condition (if reqd, replace) d) Grease the Brearings e) Ensure Flexible joints in good condition (if reqd, replace) f) Ensure Belt guard in good position (if reqd, reset) g) Grease Damper bearings h) Ensure all fasteners are in complete fastened conditon (if reqd, fasten) i) Ensure the actuator connections in order (if reqd, refix) j) Report, if any abnormality in functioning Note : PM shall be performed for installed 184 qty per quater.
SALE OF MAGNESIUM SCRAP
Magnesium Scrap Mg - 35 to 40 % MgCl2 - 60 to 65 %
Sample collection, analysis, data compilation, report preparation for submission to MoEF CC for SWRO plant, ZC.
Quarterly monitoring of Marine water quality, Marine Sediment quality and Benthic assemblages, including ecologically sensitive habitats monitoring – Coral reefs/gorgonian, sea grass beds and associated biodiversity including fish population. Collection, interpretation, compilation of data, report preparation for submission to MoEF&CC.
Flooring, waterproofing and other civil works for various plant and non-plant buildings at NFC Kota.
Painting exterior walls on plaster with two coats of antifungus and acrylic emulsion paint of exterior quality having 100% acrylic Asian Paint Ultima Protek/Dulux Professional weathershield flex or any other approved brand and shade including preparing surfaces filling cracks with external crack filler of Birla or any approved equivalent, applying one coat of approved primer as per manufacturers specification, filling cracks or wherever required for external filler, curing, scaffolding, cleaning, etc., complete. Note:- 1. Rates should be qouted inclusive of 1 coat of primer and removing old paint by using scrubbing machine, preparing the surface smooth including necessary repairs to scratches etc. complete is also included. 2. Rates are inclusive of scaffolding required at all heights.