Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance B BLOCK B 66 B BLOCK NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Non Responsive |
Tender Value
₹64.3 L
EMD Value
₹1.3 L
Closing Date
18 Apr 2022, 6:00 pmClosed
Commissioner Municipal Corporation Bharatpur
Municipal Corporation Bharatpur
Consultancy services for the Preparation of the DPR for New Nagar Nigam Office Building Construction at Jawahar Nagar Bharatpur
2022_DLB_265610_1
Nit (28/2021-22) Municipal Corporation Bharatpur
Open Tender
Consultancy
Percentage
60 days
Municipal Corporation Bharatpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Commissioner Municipal Corporation Bharatpur
₹1.3 L
Yes
4 May 2022
28 Mar 2022
25 Apr 2022
28 Mar 2022
18 Apr 2022
28 Mar 2022
Amount
Providing the Architectural consultancy services for the Preparation of DPR for New Nagar Nigam Office Building Construction at Jawahar Nagar Bharatpur, as per following scope of work: (a) Preparation of the conceptual architectural drawings and getting it approved from Municipal Corporation Bharatpur. (b) Preparation of detailed architectural working drawings including architectural working plans, elevations from all four sides, cross sectional drawings, plumbing, sanatary drawings for all floors, toilet details, door window details, electrical layout plans alongwith drawings for all floors, staircase details and all required drawings including provision of fire fighting, tube well, parking, gardening and other facilities as required. Providing the structural design and drawings for the proposed building including drawings for footings, foundations, beams, slabs and framing plans for all floors, columns and other relevant structural design and details as required. (c). Preparing the estimate and bid document for the said project based on prevailing BSR. (d) Supervision of work one visit per month or as and when required upto completion of building in all respect pto satisfaction of engineer incharge Payment schedule for contractor/Consultancy firm 1. Payment shall be released as follows: 10% on Completion of 1 (a) 10% on Completion of 1 (b) 20% on Completion of 1 (c) 60% on Compliance of 1 (d) and completion of the project.
m/s acro ventures pvt ltd
Nitesh Aggarwal
Dexterous Designers & Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .