Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.5 CrAdmitted-Finance K16 11 GROUND FLOOR PHASE II DLF CITY GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L1 | Admitted-Finance | |
| 2 | L2₹104.0 Cr+₹42.5 Cr (69.1%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹107.1 Cr+₹45.6 Cr (74.1%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MATU RAM ART CENTRES PVT LTD L1 | Construction Catalysers Pvt. Ltd. L3 | SHILPPAM L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cost for making, supply, fabrication, erection after necessary structural design & drawing for 125ft tall Bronze Statue including internal steel structure in Eco Park including all man and machineries, manpower etc. and all complete required for the job as per the direction and upto the satisfaction of Engineer-In-Charge.
N.B.- Bidders are requested to follow the R.F.P. for quoting their rates. | 1 | No | 51,70,00,000 ₹51,70,00,000 Lowest | 90,00,00,000 ₹90,00,00,000 | 87,40,00,000 ₹87,40,00,000 |
| 2.00 | Add CGST @9% of total amount of Sl No-1 | 1 | Each | 4,65,30,000 ₹4,65,30,000 Lowest | 8,10,00,000 ₹8,10,00,000 | 7,86,60,000 ₹7,86,60,000 |
| 3.00 | Add SGST @9% of total amount of Sl No-1 | 1 | Each | 4,65,30,000 ₹4,65,30,000 Lowest | 8,10,00,000 ₹8,10,00,000 | 7,86,60,000 ₹7,86,60,000 |
| 4.00 | Add Cess @1% of total amount of Sl No-1 | 1 | Each | 51,70,000 ₹51,70,000 Lowest | 90,00,000 ₹90,00,000 | 87,40,000 ₹87,40,000 |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
14 Sept 2026, 4:00 pmClosed
General Manager (Engg)-IV
HIDCO BHABAN 6th floor Room No 612
Selection of Artist Sculptor Agency for Designing, Supply and Installation of 125ft. Bronze Statue of Dr. Syama Prasad Mookerjee at Eco Park, in New Town, Kolkata.
2026_HIDCO_1038951_1
HIDCO/GM(E)IV/RFP-02/26-27
Open Tender
CIVIL WORKS
Item Rate
240 days
Eco Park New Town
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹50 L
Conference Hall of HIDCO BHABAN
1 Oct 2026
21 Aug 2026
16 Sept 2026
21 Aug 2026
14 Sept 2026
28 Aug 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost for making, supply, fabrication, erection after necessary structural design & drawing for 125ft tall Bronze Statue including internal steel structure in Eco Park including all man and machineries, manpower etc. and all complete required for the job as per the direction and upto the satisfaction of Engineer-In-Charge.
N.B.- Bidders are requested to follow the R.F.P. for quoting their rates. | - | No | 100 | - |
| 2 | Add CGST @9% of total amount of Sl No-1 | - | Each | 10 | - |
| 3 | Add SGST @9% of total amount of Sl No-1 | - | Each | 10 | - |
| 4 | Add Cess @1% of total amount of Sl No-1 | - | Each | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.20 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.75 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.59 MB
Specialtermsandcondition_GM4.pdf
Tender Documents • 0.68 MB
Drawing.pdf
Tender Documents • 14.00 MB
WBF_2912.pdf
Tender Documents • 0.28 MB
BOQ_2551918.xls
BOQ • 0.33 MB
datechange_corrigendum.pdf
PDF • 0.09 MB
corrigendum.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .