Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.7 LAccepted-AOC | ₹57.7 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹60.7 LRejected-AOC | ₹60.7 L | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹63.1 LRejected-AOC | ₹63.1 L | L3 | Rejected-AOC L3 Bidder |
| 4 | L4₹63.1 LRejected-AOC THIRUVILAKKIL SANATHANAPURAM P O ALAPPUZHA AMBALAPPUZHA TALUK ALAPPUZHA DISTRICT | ₹63.1 L | L4 | Rejected-AOC L5 Bidder |
| 5 | L5₹65.2 LRejected-AOC | ₹65.2 L | L5 | Rejected-AOC L5 Bidder |
| Sl No | Description | Qty | Unit | James Thomas L5 | BAIJU V L4 | sanalkumar v d L7 | C K SATHEESH L8 | J M J DEVELOPERS L3 | K K JAMES L6 | MARTIN JOSEPH L1 | JOE THOMAS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Protection | |||||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 440.48 | cum | 209 ₹92,060.53 | 229.25 ₹1.0 L | 218.62 ₹96,297.96 | 227.93 ₹1.0 L | 275 ₹1.2 L | 220 ₹96,905.82 | 185.96 ₹81,911.85 | 195 ₹85,893.80 |
| 1.00 | OD31457/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 440.48 | cum | 2,882 ₹12.7 L | 2,787.73 ₹12.3 L | 3,037.07 ₹13.4 L | 3,129.51 ₹13.8 L | 2,925 ₹12.9 L | 3,000 ₹13.2 L | 2,553.3 ₹11.2 L | 2,684 ₹11.8 L |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 6.3 | cum | 617 ₹3,887.10 | 556.7 ₹3,507.21 | 649.9 ₹4,094.37 | 670.21 ₹4,222.32 | 700 ₹4,410 | 649 ₹4,088.70 | 546.81 ₹3,444.90 | 575 ₹3,622.50 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 5.04 | cum | 1,398 ₹7,045.92 | 1,261 ₹6,355.44 | 1,472.1 ₹7,419.38 | 1,518.11 ₹7,651.27 | 1,500 ₹7,560 | 1,472 ₹7,418.88 | 1,238.59 ₹6,242.49 | 1,302 ₹6,562.08 |
| 1.00 | OD31458/2023-2024:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 978.55 | cum | 4,166 ₹40.8 L | 4,028.69 ₹39.4 L | 4,385.57 ₹42.9 L | 4,522.62 ₹44.3 L | 3,900 ₹38.2 L | 4,309.09 ₹42.2 L | 3,689.91 ₹36.1 L | 3,878 ₹37.9 L |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 130.15 | cum | 6,800 ₹8.9 L | 6,575.64 ₹8.6 L | 7,158.13 ₹9.3 L | 7,381.82 ₹9.6 L | 6,800 ₹8.9 L | 7,150 ₹9.3 L | 6,022.67 ₹7.8 L | 6,330 ₹8.2 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 81.2 | sqm | 314 ₹25,498.06 | 304.34 ₹24,713.63 | 331.3 ₹26,902.89 | 341.65 ₹27,743.35 | 350 ₹28,421.40 | 330 ₹26,797.32 | 278.74 ₹22,634.80 | 293 ₹23,792.77 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 18.56 | cum | 6,984 ₹1.3 L | 6,753.47 ₹1.3 L | 7,351.72 ₹1.4 L | 7,581.46 ₹1.4 L | 7,000 ₹1.3 L | 7,351 ₹1.4 L | 6,185.55 ₹1.1 L | 6,502 ₹1.2 L |
| 1.01 | OD31459/2023-2024:Earthwork in rough excavation in or under water banking excavated clay inlayers not exceeding
20 cm in depth,breaking clods and dressing up in embackment for roads
,flood<br>banks,marginal banks and guid banks with all kinds of soil(CPWD 2.2.1-2.4-
2.5+2.24.1)under excavation in<br>stiff heavy cayal clay. Certificate :-Cetified that the
observed data is prepared by taking the rates and laboure<br>charges as per current
schedule of rate and has been prepared as per the actual observation at the
site.all<br>kinds of soil. | 30.35 | cum | 946 ₹28,710.15 | 915.15 ₹27,773.89 | 996.22 ₹30,234.28 | 1,027.35 ₹31,179.05 | 800 ₹24,279.20 | 995 ₹30,197.26 | 838.19 ₹25,438.23 | 881 ₹26,737.47 |
Tender Value
₹85.8 L
EMD Value
₹50,000
Closing Date
16 Mar 2026, 6:00 pmClosed
SUPERINTENDING ENGINEER
KD CIRCLE CHENGANNUR
GENERAL-Vendiyanikkal Nandiyattukari-KPFlood Mitigation Programme and Improving Infrastructural Facilities of Vendiyanikkal Nandiyattukari padasekharam in Thakazhy Panchayath - Reach I -General Civil Work
2026_Irrig_845531_1
IRR/KP/TR/8496/2023_5_1_1/1
Open Tender
Civil Works - Others
545 days
Thakazhy
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
5 Jun 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Protection
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD31457/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD31458/2023-2024:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
OD31459/2023-2024:Earthwork in rough excavation in or under water banking excavated clay inlayers not exceeding 20 cm in depth,breaking clods and dressing up in embackment for roads ,flood<br>banks,marginal banks and guid banks with all kinds of soil(CPWD 2.2.1-2.4- 2.5+2.24.1)under excavation in<br>stiff heavy cayal clay. Certificate :-Cetified that the observed data is prepared by taking the rates and laboure<br>charges as per current schedule of rate and has been prepared as per the actual observation at the site.all<br>kinds of soil.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1428105.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1428105.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 2.12 MB
Download all tender documents and submit your bid