Tender Value
₹88.7 L
EMD Value
₹1.8 L
Closing Date
1 Aug 2026, 10:40 pm2d left
Hubli Electricity Supply Company Limited
NAGAPPA C BELAKERI
9449057833
Repairs & Reconditioning of 05 Nos of faulty 33/11kV 1X5MVA Power Transformer failed at 33/11KV Sub-stations in O&M Zone, HESCOM, Belagavi
HESCOM/2026-27/SE0758
HESCOM/2026-27/SE0758
Open
Two Tender Document System(Two Cover)
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
21 documents required · 21 mandatory
The bidder should have Satisfactorily completed(at least 90% of the contract value),as prime a contractor, at least one contract repairs and re-conditioning of 5MVA and above capacity, 33/11KV and above voltage class of Power Transformers including replacement of faulty/burnt winding & core, repairs to OLTC unit & other such allied works of value not less than 50% of the amount put to Tender either in HESCOM or in any ESCOM's/Govt. distribution/Transmission Utilities including PSUs in in the last Five Financial Years. (i.e., 2020-21, 2021-22, 2022-23 2023-24 and 2024-25).As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies/PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited
The Bidder should have achieved in at least Two financial year, an average annual financial turnover of not less than the amount put to tender in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25)The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection.Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited
Liquid assets (Cash at Bank plus Term deposit in any Nationalized/Scheduled Commercial Bank) on or after the date of notification of tender plus Availability of credit facility in any Nationalized/ Scheduled Commercial Bank shall not be less than 30% of the amount put to tender i.e., Rs.26.59 Lakhs Equivalent of estimated cash flow for 3 months/year in peak execution period) which shall be which shall be supported by certificate issued by any Nationalized /Scheduled Commercial Bank. The said Original scanned Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele), Project Monitoring Cell, Corporate Office, HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid. (ANNEXURE-V). The conditional credit certificates are liable for rejection.
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 /Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka.The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black Listed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission.Self-declaration for the same shall be uploaded
The bidder should not have been Defaulted or Terminated closed due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission.Self-declaration for the same shall be uploaded
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid.Self-declaration for the same shall be uploaded
The bidder should have a valid Factory License. The copy of the same issued by competent authority shall be uploaded
The bidder should have his own repair & testing center with all infrastructures required for repair & testing the 5MVA and above Power transformer and should possess the following equipments & machinery.a)Turn ratio kit.b)High voltage test set on HV&LV.c)DVDF set for testing of 5MVA power transformers.d)Testing panel with CT of ratio 25-300/5amp, class 0.2 -3 Nos.e)PT of ratio-11KV/110v class-0.2 -3 Nos.f)All testing equipments for testing of 5MVA power transformers.g)Oil Filtration Plant of 3000LPH capacity.h)Drying facility and winding facility.i)Validity certificate for the measuring and testing equipments.j)Pressure test and oil leakage testing facility.The details of equipment and machineries uploaded shall be duly certified by the concerned jurisdictional Executive Engineer(Ele),MRT Division of ESCOMs.The bidder shall upload the latest certified copy issued within 3 months from the date of bid submission
The Firm should have Annealing furnace for annealing of HT & LT copper winding of transformer. The necessary Certificate shall be uploaded duly certified by the concerned jurisdictional Executive Engineer (Ele), MT Division of ESCOM's. The bidder shall upload the latest certified copy issued within 3 months from the date of bid submission
The bidder should have carried out repairs and re-conditioning of not less than 80% of the quantity proposed in the bid of 5MVA and above capacity, 33/11KV and above voltage class of Power Transformers including replacement of faulty/burnt winding & core, repairs to OLTC unit & other such allied works, either in HESCOM or in any ESCOM's/Govt. distribution/Transmission Utilities including PSUs during any one of the last Five Financial Years. (i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24) on Total Turnkey/Partial Turnkey Basis/ Labour contract basis/self-execution basis in any State/ Central Govt. Distribution Companies / PSUs.These Power Transformers shall be in successful operation for a period of at least 2(Two) years as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
₹2,220
₹1.8 L
17 Jul 2026
17 Jul 2026
3 Aug 2026
22 Jul 2026
23 Jul 2026
Repairs & Reconditioning of 05 Nos of faulty 33/11kV 1X5MVA Power Transformer failed at 33/11KV Sub-stations in O&M Zone, HESCOM, Belagavi
S.No 33KV S&L Division Name of the Sub Station Make Sl.No. Cost of Estimate without GST
1 Belagavi 33/11KV S/S Bennadi Techno Power Corporation TPC/33/11500008037 1614481.17
2 Belagavi 33/11KV S/S Mangsuli GEC 214017/3 1817512.97
3 Belagavi 33/11KV S/S Nandagaon Kirloskar 70SG-008/14 1809960.64
4 Belagavi 33/11 KV MUSS Sankonatti GEC 214021/2 1838621.17
5 Belagavi 33/11KV Sub-station Shedbal SPEC ST-37382 1785142.62
Estimated Cost 8,865,718.57
SLNO Particulars Amount
1 Material Cost
2 Labour/Erection/Dismantaling Charges and Testing & Commissioning Charges
3 Cost of Civil engineering works
4 Basic Rate(Sum of SlNo.1to 3 )
5 Area of Specific loading Rates on Basic Rates (SlNo4)Wherever applicable
6 Appliacable GST on SLNo.4&5
7 Cost of the Estimate(Sum of SlNo.4 to 6)
8 Statutory Charges Such as PTCC, Electrical Inspectorate Payment towards Civic Bodies
9 Forest Clerance/ Crop Cut Compensation
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Mallur.
Name plate details of power transformer OLTC Details
Make: Crompton Greaves Ltd Off Load Tap Changer
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11
Core and Winding Mass 7800 Kg
Mass of Oil in Kg/Liters 3900Kg/ 4500 ltrs 11100
Total Mass 15000 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Total 4635 ('----a)
Empty oil barrels (Good) 22.18 appr. 22 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7800 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2340 ('----c)
Only copper winidng weight ( 80% of c) 1872 ('----d)
Only Solid insulation weight ( 20% of c) 468
For 1 Limb winding weight (d/3) 624 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1872
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1622 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 4635 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.00
8. Loading of the faulty power transformer from the site. 11.100
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: GEC Make: Crompton Greaves
Capacity: 5MVA Type: F.3.17/33/100
YOM 1985 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 610 Kg
Untanking Mass 5900 Kg Oil is selector Switch tank: 660Kg/760 Ltrs
Mass of Oil in Kg/Liters 2870Kg/ 3300 ltrs Total weight : 1270Kg 11100
Total Mass 14500 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3300
Wastage 3% 121.8
Empty oil barrels (Good) 20.01 appr. 20 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5900 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1770 ('----c)
Only copper winidng weight ( 80% of c) 1416 ('----d)
Only Solid insulation weight ( 20% of c) 354
For 1 Limb winding weight (d/3) 472 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1416
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1266 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 250
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 4060 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 14.50
8. Loading of the faulty power transformer from the site. 10.970 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: Techno Power Corporation Make CTR
Capacity: 5MVA Type EO16
YOM 2008 YOM 2007
Volts at No load HV: 33KV LV: 11KV Steps 16
Amperes HV: 87.4 LV: 262.4 Weight/ volume wothout oil 393 Kg
Vector Group DYn11 Oil 327Kg/380 ltr
Untanking Mass 10465 Kg Direction of Power flow HV to LV: 100%,
Volume of Oil in Liters 3100 ltrs LV to HV:--- 11100
Transport Mass 13100Kg Frequency 50 Hz
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Empty oil barrels (Good) 17.15 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 10465 10.46 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3139.5 ('----c)
Only copper winidng weight ( 80% of c) 2511.6 ('----d)
Only Solid insulation weight ( 20% of c) 627.9
For 1 Limb winding weight (d/3) 837.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2511.6
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 2261.6 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 200
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 3480 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.10
8. Loading of the faulty power transformer from the site. 9.980 9983.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Alagawadi.
Name plate details of power transformer OLTC Details
Make: Kirloskar Off Load Tap Changer
Sl No: 80 SG-018/2
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11 15370
Core and Winding Mass 7230 5922.5
Mass of Oil in Kg/Liters 5923Kg/ 5150 ltrs
Total Mass 15370 Kg 9447.5
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4400
Wastage 3% 154.5
Empty oil barrels (Good) 25.38 appr. 26 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7230 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2169 ('----c)
Only copper winidng weight ( 80% of c) 1735.2 ('----d)
Only Solid insulation weight ( 20% of c) 433.8
For 1 Limb winding weight (d/3) 578.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1735.2
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1485.2 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 5304.5 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.30
8. Loading of the faulty power transformer from the site. 9.400
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Muragundi
Name plate details of power transformer OLTC Details
Make: GEC Make: CTR
Capacity: 5MVA Type: -
YOM 2008 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 720 Kg
Untanking Mass 5500 Oil is selector Switch tank: 380 Ltrs 13500
Mass of Oil in Kg/Liters 3800Kg/ 3300 ltrs Total weight : 1157 Kg 3795
Total Mass 13500 Kg 9705
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3000
Wastage 3% 101.4
Empty oil barrels (Good) 16.66 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5500 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1650 ('----c)
Only copper winidng weight ( 80% of c) 1320 ('----d)
Only Solid insulation weight ( 20% of c) 330
For 1 Limb winding weight (d/3) 440 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1320
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1170 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 3380 6613 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.50 3887
8. Loading of the faulty power transformer from the site. 9613.000 6713 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: GEC India Limited Make:Crompton parkinson Ltd England
Volts: 33kV/11kV Sl No: 41370151
Amps: 87.5A/262.43 A Rated Step Voltage: 418V
Untanking Mass: 12980 kgs Total Weight: 1270 Kg appx
Mass of Oil: 3902 kgs Volume of Oil: 760 ltrs(appx) 1270
Volume of Oil: 4500 Ltrs Mass of Oil : 660 Kgs(appx)
Transport Mass: 16882 Kgs
Total Mass: 16882 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Wastage 3% 157.8
Total 5418 Litre ('----a)
Empty oil barrels (Good) in Nos Total 26
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 12980 12.98 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3894 ('----c)
Only copper winidng weight ( 80% of c) 3115.2 ('----d)
Only Solid insulation weight ( 20% of c) 779
For 1 Limb winding weight (d/3) 1038.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 3115.2
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2865 Appr 250Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 5260
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 16.88
8. Loading of the faulty power transformer from the site in Tons 12.320
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Haligeri.
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-08042 Type: E016
Volts: 33kV/11kV Sl No: 2822589
Amps: 87.4A/262.4 A Rated Step Voltage: 412.5V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-09/24 Type: E016
Volts: 33kV/11kV Sl No: 2925066
Amps: 87.4A/262.4 A Rated Step Voltage: 413V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: Kirloskar, Sl No: 70SG-008/14, YOM: 1973, which was failed at 2X5MVA, 33/11KV MUSS, Nandagaon in Athani Taluka in O&M Division, HESCOM, Athani
Sl. No. Particulars Material Erection Transit Insuranace Total
1 Material cost 1378149.54 1378149.54
2 Labour charges 421811.10 421811.10
3 Transit Insuranace 10000.00 10000.00
5 Apllicable GST on Sum SLNo- 4 0.00 0.00 0.00 0.00
6 Cost of estimate (Sum of Sl No 4 to 5) 1378149.54 421811.10 10000.00 1809960.64
Tender Component 0.00 0.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Sl. No Particulars As per Sanctioned Estimate Cost
1a Materials Cost (Exclusive of GST) Material Supplied by HESCOM 481900.30 1199894.3
1 b Materials Cost (Exclusive of GST) Material Supplied by Agency 1390004.78 #REF!
2a Labour Charges (Exclusive of GST) Carried out by HESCOM Employees 0.00
2b Labour Charges (Exclusive of GST) Carried out by Agency 432863.43
3 Basic Rate (Sum of SLNo.1a, 1b, 2a & 2b ) 2304768.51 1822868.21
4 Area Specific Loading on Basic rates (Slno-3) Wherever applicable 0.00 2150984.485
5 Apllicable GST on Sum SLNo- 3&4 414858.33
6 Cost of Estimate (Sum of SlNo-3 to 5) Amount Put to tender 2719626.84
7 Satutory Charges as per actual + Applicable GST on Satutory Charges (Inspectorate Charges, Civic Body Chrges, Compensation etc.,) 0.00
8 Total Cost of the estimate(Sum of SlNo.6 &7 ) 2719626.84
REPORT: The provisional estimate Rs. 2498315/- for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
The existing 5MVA,33/11KV Power transformer No.3, Make:GEC, Sl. No.: 214017/3, YOM:1971 at 33/11KV Sub-Station Mangsuli in O & M Division, HESCOM, Athani was experienced a trouble on dated 25.09.2025 around 11:45 am at the same 5MVA Power Transformer No-3 was tripped on OC and BH relays. After releasing gas from the BH relay and resetting the protection, a test charge was taken at 12:25 pm. However, the transformer tripped again immediately on OC and EF Relay. And the same was intimated to the BDM Staff HESCOM Chikkodi. The Asst. Executive Engineer(El), BDM Sub-Division, HESCOM Chikkodi along with staff had visited the station and observed carried out detailed testing of the transformer. The results revealed a shift of current towards neutral from the B-phase during the short circuit test, which is an anomaly. Furthermore, a large current was recorded in the LV MBT test on the neutral side, indicating a possible B-phase winding damage. During inspection, the top lid of the main transformer tank was opened to verify the firmness of the windings, which was found satisfactory. However, metallic granules were noticed inside the tank, and a burning smell of oil was observed, therefore, the above said troubled Power Transformer has to be shifted to the Power Transformer repair center for rectification and detail analysis of the quantum of damage internaly occured. Hence, The Assistant Executive Engineer(El) BDM Sub-Division HESCOM Chikkodi had declared that the above said 5MVA, 33/11KV Power Transformer was failed and submitted the detail report vide their office letter No CKD/AEE(El)/BDM/2025-26/125 Dated:26.09.2025 3780
This provisional estiamte is prepared as per the test results obtained and based on physical through inspection of Power Transformer at the site during test. However, actual quantity/ cost of estimate will be submitted after the detail inspection of all the internal parts of the subject power transformer by joint inspection committe constituted under the chairmanship of Honrable DT HESCOM Hubballi and members Chief Engineer O&M Zone, HESCOM, Belagavi, Executive Engineer (Ele) 33KV S&L Division, HESCOM, Belagavi and convener Executive Engineer (Ele) MRT Division, HESCOM, Belagavi.
Therefore, this estimate is prepared for repairs and reconditioning of faulty 5MVA, 33/11KV Power Transformer Make: GEC, Sl No: 214017/3, YOM:1971 which was failed on 26.09.2025 at 3X5MVA, 33/11KV MUSS, Mangsuli. The necessary spares and adequate labour charges are included in this estimate. Hence kindly requested to sanction the estimate at an early.
CERTIFICATE: I have personally visited the spot & prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Junior Engineer(Ele.)
33/11 MUSS, HESCOM,
CERTIFICATE: I have personally visited the spot & got prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Assistant Executive Engineer(Ele)
33KV S&L Sub-Division, HESCOM, Athani
Executive Engineer (Ele.) Superintending Engineer (El.
33KV S&L Division, HESCOM, Belagavi. O&M Circle, HESCOM, Chikkodi
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Name plate details of power transformer OLTC Details
Make: GEC Make CG
Capacity: 5MVA Type F317.33/300
YOM 1971 YOM NA 12320
Volts at No load HV: 33KV LV: 11KV Steps -
Amperes HV: 87.5 LV: 262.5 Weight/ volume without oil 610 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660kg/750 Ltrs
Untanking Mass 6670 kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3902Kg/ 4500 ltrs 1.422413793 157.5
Transport Mass 16882 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
2 EHV Grade Fresh Transformer Oil: O (5250+157.5= Ltrs) + 3% wastage is 115.89 Total Oil: 5408 Ltrs as per CSR-2023-24(Page No.24 SlNo-120 Item No.15.01) Ltrs 5408 105.545 570787.36 0 5250 5250 3863.00 18.94761905 3863 1295318
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2023-(PageNo-16 of 86 SlNo-120 Item No-15.01) Nos 26 469 12194.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 118.00 0.00 11400 5407.5
5 Sub-Total amount of PART-A 583099.36 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 481900.2975 #REF!
Total amount of PART-A 481900
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116(12.32 MT X 10Mtrs )= 123.2 Per MT/ Mtr 123.20 80.00 0.00 9856.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Nandagaon (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3850.00 130900.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3850.00 130900.00
iii. Transition resistors No's 3 3500.00 10500.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 5250 5.32 0.00 27930.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 5525.00 5525.00 0.00
iii. WTI relay No 1 6340.00 6340.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 5000.00 10000.00 0.00
vi. LV bushing No 2 3500.00 7000.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm ( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(16.882MT*30Mtr) Per MT/ Mtr 506.46 80.00 0.00 40516.80 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 16.88 1134.00 0.00 19144.19 7500 4000 140282.57
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 26 0.00 469.00 12194.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 85621.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: Kirloskar, Sl No: 70SG-008/14, YOM: 1973, which was failed at 2X5MVA, 33/11KV MUSS, Nandagaon in Athani Taluka in O&M Division, HESCOM, Athani
Name plate details of power transformer OLTC Details
Make: Kirloskar Make CG
Sl No: 70SG-008/14 Sl No 42370113
Capacity: 5MVA Type F3-17-33/300
YOM 1973 YOM - 12320
Volts at No load HV: 33KV LV: 11KV Steps 17
Amperes HV: 87.4 LV: 262.4 Weight/ volume without oil 1270 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660Kg/750 Ltrs
Untanking Mass - Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 2320Kg/ 3300 ltrs 1.422413793 157.5
Transport Mass 14380 Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
Make:Kirloskar, Sl No:70SG-008/14, YOM: 1973 4200 25.75
2 EHV Grade Fresh Transformer Oil: (3300+750= Ltrs) + 3% wastage is 121.5 Total Oil: 4172 Ltrs as per HESCOM common SR-2025-26 page no 143, Sl.No: 155, item no:15.01 material code: 601400, For KL= 79911.00, For per ltr Rs:79.911/- Ltrs 4172 79.911 333388.69 0 5250 5250 3863.00 18.94761905 3863
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2025-26, (PageNo-53, SlNo-731, Item No-69.19) Nos 20 451 9020.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 286.26 0.00 11400 5407.5
5 Sub-Total amount of PART-A 342694.95 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 283218.9686 #REF!
Total amount of PART-A 283219
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116 (11.40 MT X 10Mtrs )= 171 Per MT/ Mtr 171 80.00 0.00 13680.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Nandagaon (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 11.40 1655.00 0.00 18867.00 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Nandagaon, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 11.40 1655.00 0.00 18867.00
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3800.00 129200.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3800.00 129200.00
iii. Transition resistors No's 3 2000 6000.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 4050 5.32 0.00 21546.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 2747.76 2747.76 0.00
iii. WTI relay No 1 2662.00 2662.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 4500.00 9000.00 0.00
vi. LV bushing No 3 3500.00 10500.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 14.38 2061.00 0.00 29637.18
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 (actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 14.38 2061.00 0.00 29637.18 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(14.38MT*30Mtr) Per MT/ Mtr 431.40 80.00 0.00 34512.00 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 14.38 1134.00 0.00 16306.92 7500 4000 129230.24
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 20 0.00 469.00 9380.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 82807.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 585000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1846000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 336600.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2767600.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 3265768.00 3091878.00 8.47
REPORT : This is an estimate amounting to Rs. 32,65,768/- (Rupees. Thirty two Lakhs Sixty five thousands Seven hundred & Sixty eight Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 16.09.2023 for its insulation resistance values, HV & LV magnetic balance test & open circuit test results are found satisfactory, But 1). the Test results of SC test found unsatisfactorily. Neutral drawing abnormal current in SC test 2). In winding resistance test YB phase shows high resistance compared to RY & BR.It is suspected that, “Y” phase both HV and LV winding faulty, Detailed inspection of internal live parts of the power transformer is to be carried out to ascertain the exact nature of fault at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2023-24/165-68 Dated 16.09.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: GEC India Limited OLTC Details: #REF! #REF! #REF!
Sl No: 214019/2 Make:Crompton parkinson Ltd England #REF! #REF! #REF!
Capacity: 5MVA Type: F317331300
YOM 1971 Sl No: 41370151 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 418V
Amperes HV: 87.5 LV: 262.43 Total Weight: 1270 Kg appx 1622
Vector Group DYn11 Volume of Oil: 760 ltrs(appx)
Untanking mass 12980 Kg Mass of Oil : 660 Kgs(appx)
Mass of Oil in Kg/Liters 3902Kg/ 4500 ltrs 3100
Total Mass 16882 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: GEC India Limited bearing Sl No: 214019/2
2 Fresh Transformer Oil: Oil released (5260= Ltrs) + 3% wastage is 157.8 Total Oil: 5417.8 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 5418 105.545 571842.81 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 26 469 12194 0 0 -169000.00
4 Miscellaneous towards unforseen requirements L/s 963.19 0.00 0.00 -273
Total amount of PART-A 585000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 173890.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.32 MT/ 30Mtr 80.00 0.00 29568.00 0.00 As per actuals in allotted station 985.6
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 12.32 2061.00 0.00 25391.52 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 12.320 186.00 0.00 2291.52 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 250 973.00 243250.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 779 939.00 731481.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2865 248.00 710520.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 5260 5.32 0.00 27983.20 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 0 2654.04 0.00 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 16.88 186.00 0.00 3140.05 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 16.88 2061.00 0.00 34793.80 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 16.88 MT/ 30Mtr 80.00 0.00 40516.80 0.00 As per actuals in allotted station 40512 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 973.16 57.77 -916000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 250.00 569.00 142250.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 26.00 0.00 469.00 12194.00 Good
Total amount of 'PART-C' 173890.00 -85140.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 17.03.2023 for its insulation resistance values, Further By using multimeter continuity checked. R phase HV-Ground, Y phase HV-Ground & B phase HV-Ground found continuity for different taps.(IR values of HV (R+Y+B) to EARTH is 2 MOhms) Drained out the oil upto inspection chamber, no finding observed and opened the top cover of OLTC no findings obserbed. For conducting the test for Open Circuit and Short Circuit while giving 3 ph power supply to HV side the “Y” phase fuse blown out immediately & unable to process the further transformer tests. From the above results. it is suspected that, HV side of transformer winding grounded, Hence recommended for thorough inspection at repairer bay. It can not be attended at site.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: No. BGK/BDM/AEE/AE/ 2022-23/417-22 Date: 18.03.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-09/24 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2925066 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000-09/24
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00 2341631.00 8.47
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot
The subject power transformer is tested on site, on 01.03.2021 for its insulation resistance values, HV & LV magnetic balance test & Short circuit test and open circuit test results are satisfactory, But insulation between HV and LV may be detoriated i.e PI value is only 0.28. It can not be attended at site.Hence recommended for reconditioning of insulation may be done at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2020-21/380-83 Dated 01.03.2021. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C
vii. HV bushing
viii. LV bushing
ix. wiring cable for above relays
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-08042 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2822589 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
SLNO Particulars Amount
1 Material Cost
2 Labour/Erection/Dismantaling Charges and Testing & Commissioning Charges
3 Cost of Civil engineering works
4 Basic Rate(Sum of SlNo.1to 3 )
5 Area of Specific loading Rates on Basic Rates (SlNo4)Wherever applicable
6 Appliacable GST on SLNo.4&5
7 Cost of the Estimate(Sum of SlNo.4 to 6)
8 Statutory Charges Such as PTCC, Electrical Inspectorate Payment towards Civic Bodies
9 Forest Clerance/ Crop Cut Compensation
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Mallur.
Name plate details of power transformer OLTC Details
Make: Crompton Greaves Ltd Off Load Tap Changer
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11
Core and Winding Mass 7800 Kg
Mass of Oil in Kg/Liters 3900Kg/ 4500 ltrs 11100
Total Mass 15000 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Total 4635 ('----a)
Empty oil barrels (Good) 22.18 appr. 22 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7800 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2340 ('----c)
Only copper winidng weight ( 80% of c) 1872 ('----d)
Only Solid insulation weight ( 20% of c) 468
For 1 Limb winding weight (d/3) 624 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1872
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1622 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 4635 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.00
8. Loading of the faulty power transformer from the site. 11.100
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: GEC Make: Crompton Greaves
Capacity: 5MVA Type: F.3.17/33/100
YOM 1985 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 610 Kg
Untanking Mass 5900 Kg Oil is selector Switch tank: 660Kg/760 Ltrs
Mass of Oil in Kg/Liters 2870Kg/ 3300 ltrs Total weight : 1270Kg 11100
Total Mass 14500 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3300
Wastage 3% 121.8
Empty oil barrels (Good) 20.01 appr. 20 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5900 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1770 ('----c)
Only copper winidng weight ( 80% of c) 1416 ('----d)
Only Solid insulation weight ( 20% of c) 354
For 1 Limb winding weight (d/3) 472 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1416
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1266 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 250
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 4060 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 14.50
8. Loading of the faulty power transformer from the site. 10.970 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: Techno Power Corporation Make CTR
Capacity: 5MVA Type EO16
YOM 2008 YOM 2007
Volts at No load HV: 33KV LV: 11KV Steps 16
Amperes HV: 87.4 LV: 262.4 Weight/ volume wothout oil 393 Kg
Vector Group DYn11 Oil 327Kg/380 ltr
Untanking Mass 10465 Kg Direction of Power flow HV to LV: 100%,
Volume of Oil in Liters 3100 ltrs LV to HV:--- 11100
Transport Mass 13100Kg Frequency 50 Hz
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Empty oil barrels (Good) 17.15 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 10465 10.46 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3139.5 ('----c)
Only copper winidng weight ( 80% of c) 2511.6 ('----d)
Only Solid insulation weight ( 20% of c) 627.9
For 1 Limb winding weight (d/3) 837.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2511.6
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 2261.6 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 200
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 3480 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.10
8. Loading of the faulty power transformer from the site. 9.980 9983.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Alagawadi.
Name plate details of power transformer OLTC Details
Make: Kirloskar Off Load Tap Changer
Sl No: 80 SG-018/2
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11 15370
Core and Winding Mass 7230 5922.5
Mass of Oil in Kg/Liters 5923Kg/ 5150 ltrs
Total Mass 15370 Kg 9447.5
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4400
Wastage 3% 154.5
Empty oil barrels (Good) 25.38 appr. 26 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7230 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2169 ('----c)
Only copper winidng weight ( 80% of c) 1735.2 ('----d)
Only Solid insulation weight ( 20% of c) 433.8
For 1 Limb winding weight (d/3) 578.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1735.2
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1485.2 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 5304.5 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.30
8. Loading of the faulty power transformer from the site. 9.400
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Muragundi
Name plate details of power transformer OLTC Details
Make: GEC Make: CTR
Capacity: 5MVA Type: -
YOM 2008 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 720 Kg
Untanking Mass 5500 Oil is selector Switch tank: 380 Ltrs 13500
Mass of Oil in Kg/Liters 3800Kg/ 3300 ltrs Total weight : 1157 Kg 3795
Total Mass 13500 Kg 9705
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3000
Wastage 3% 101.4
Empty oil barrels (Good) 16.66 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5500 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1650 ('----c)
Only copper winidng weight ( 80% of c) 1320 ('----d)
Only Solid insulation weight ( 20% of c) 330
For 1 Limb winding weight (d/3) 440 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1320
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1170 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 3380 6613 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.50 3887
8. Loading of the faulty power transformer from the site. 9613.000 6713 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: GEC India Limited Make:Crompton parkinson Ltd England
Volts: 33kV/11kV Sl No: 41370151
Amps: 87.5A/262.43 A Rated Step Voltage: 418V
Untanking Mass: 12980 kgs Total Weight: 1270 Kg appx
Mass of Oil: 3902 kgs Volume of Oil: 760 ltrs(appx) 1270
Volume of Oil: 4500 Ltrs Mass of Oil : 660 Kgs(appx)
Transport Mass: 16882 Kgs
Total Mass: 16882 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Wastage 3% 157.8
Total 5418 Litre ('----a)
Empty oil barrels (Good) in Nos Total 26
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 12980 12.98 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3894 ('----c)
Only copper winidng weight ( 80% of c) 3115.2 ('----d)
Only Solid insulation weight ( 20% of c) 779
For 1 Limb winding weight (d/3) 1038.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 3115.2
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2865 Appr 250Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 5260
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 16.88
8. Loading of the faulty power transformer from the site in Tons 12.320
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Haligeri.
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-08042 Type: E016
Volts: 33kV/11kV Sl No: 2822589
Amps: 87.4A/262.4 A Rated Step Voltage: 412.5V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-09/24 Type: E016
Volts: 33kV/11kV Sl No: 2925066
Amps: 87.4A/262.4 A Rated Step Voltage: 413V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: SPEC, Sl No: ST-37382, YOM: 2007, which was failed at 2X5MVA, 33/11KV MUSS, Shedbal in Athani Taluka in O&M Division, HESCOM, Athani
Sl. No. Particulars Material Erection Transit Insuranace Total
1 Material cost 1378149.54 1378149.54
2 Labour charges 396993.08 396993.08
3 Transit Insuranace 10000.00 10000.00
5 Apllicable GST on Sum SLNo- 4 0.00 0.00 0.00 0.00
6 Cost of estimate (Sum of Sl No 4 to 5) 1378149.54 396993.08 10000.00 1785142.62
Tender Component 0.00 0.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Sl. No Particulars As per Sanctioned Estimate Cost
1a Materials Cost (Exclusive of GST) Material Supplied by HESCOM 481900.30 1199894.3
1 b Materials Cost (Exclusive of GST) Material Supplied by Agency 1390004.78 #REF!
2a Labour Charges (Exclusive of GST) Carried out by HESCOM Employees 0.00
2b Labour Charges (Exclusive of GST) Carried out by Agency 432863.43
3 Basic Rate (Sum of SLNo.1a, 1b, 2a & 2b ) 2304768.51 1822868.21
4 Area Specific Loading on Basic rates (Slno-3) Wherever applicable 0.00 2150984.485
5 Apllicable GST on Sum SLNo- 3&4 414858.33
6 Cost of Estimate (Sum of SlNo-3 to 5) Amount Put to tender 2719626.84
7 Satutory Charges as per actual + Applicable GST on Satutory Charges (Inspectorate Charges, Civic Body Chrges, Compensation etc.,) 0.00
8 Total Cost of the estimate(Sum of SlNo.6 &7 ) 2719626.84
REPORT: The provisional estimate Rs. 2498315/- for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
The existing 5MVA,33/11KV Power transformer No.3, Make:GEC, Sl. No.: 214017/3, YOM:1971 at 33/11KV Sub-Station Mangsuli in O & M Division, HESCOM, Athani was experienced a trouble on dated 25.09.2025 around 11:45 am at the same 5MVA Power Transformer No-3 was tripped on OC and BH relays. After releasing gas from the BH relay and resetting the protection, a test charge was taken at 12:25 pm. However, the transformer tripped again immediately on OC and EF Relay. And the same was intimated to the BDM Staff HESCOM Chikkodi. The Asst. Executive Engineer(El), BDM Sub-Division, HESCOM Chikkodi along with staff had visited the station and observed carried out detailed testing of the transformer. The results revealed a shift of current towards neutral from the B-phase during the short circuit test, which is an anomaly. Furthermore, a large current was recorded in the LV MBT test on the neutral side, indicating a possible B-phase winding damage. During inspection, the top lid of the main transformer tank was opened to verify the firmness of the windings, which was found satisfactory. However, metallic granules were noticed inside the tank, and a burning smell of oil was observed, therefore, the above said troubled Power Transformer has to be shifted to the Power Transformer repair center for rectification and detail analysis of the quantum of damage internaly occured. Hence, The Assistant Executive Engineer(El) BDM Sub-Division HESCOM Chikkodi had declared that the above said 5MVA, 33/11KV Power Transformer was failed and submitted the detail report vide their office letter No CKD/AEE(El)/BDM/2025-26/125 Dated:26.09.2025 3780
This provisional estiamte is prepared as per the test results obtained and based on physical through inspection of Power Transformer at the site during test. However, actual quantity/ cost of estimate will be submitted after the detail inspection of all the internal parts of the subject power transformer by joint inspection committe constituted under the chairmanship of Honrable DT HESCOM Hubballi and members Chief Engineer O&M Zone, HESCOM, Belagavi, Executive Engineer (Ele) 33KV S&L Division, HESCOM, Belagavi and convener Executive Engineer (Ele) MRT Division, HESCOM, Belagavi.
Therefore, this estimate is prepared for repairs and reconditioning of faulty 5MVA, 33/11KV Power Transformer Make: GEC, Sl No: 214017/3, YOM:1971 which was failed on 26.09.2025 at 3X5MVA, 33/11KV MUSS, Mangsuli. The necessary spares and adequate labour charges are included in this estimate. Hence kindly requested to sanction the estimate at an early.
CERTIFICATE: I have personally visited the spot & prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Junior Engineer(Ele.)
33/11 MUSS, HESCOM,
CERTIFICATE: I have personally visited the spot & got prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Assistant Executive Engineer(Ele)
33KV S&L Sub-Division, HESCOM, Athani
Executive Engineer (Ele.) Superintending Engineer (El.
33KV S&L Division, HESCOM, Belagavi. O&M Circle, HESCOM, Chikkodi
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Name plate details of power transformer OLTC Details
Make: GEC Make CG
Capacity: 5MVA Type F317.33/300
YOM 1971 YOM NA 12320
Volts at No load HV: 33KV LV: 11KV Steps -
Amperes HV: 87.5 LV: 262.5 Weight/ volume without oil 610 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660kg/750 Ltrs
Untanking Mass 6670 kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3902Kg/ 4500 ltrs 1.422413793 157.5
Transport Mass 16882 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
2 EHV Grade Fresh Transformer Oil: O (5250+157.5= Ltrs) + 3% wastage is 115.89 Total Oil: 5408 Ltrs as per CSR-2023-24(Page No.24 SlNo-120 Item No.15.01) Ltrs 5408 105.545 570787.36 0 5250 5250 3863.00 18.94761905 3863 1295318
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2023-(PageNo-16 of 86 SlNo-120 Item No-15.01) Nos 26 469 12194.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 118.00 0.00 11400 5407.5
5 Sub-Total amount of PART-A 583099.36 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 481900.2975 #REF!
Total amount of PART-A 481900
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116(12.32 MT X 10Mtrs )= 123.2 Per MT/ Mtr 123.20 80.00 0.00 9856.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Nandagaon (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3850.00 130900.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3850.00 130900.00
iii. Transition resistors No's 3 3500.00 10500.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 5250 5.32 0.00 27930.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 5525.00 5525.00 0.00
iii. WTI relay No 1 6340.00 6340.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 5000.00 10000.00 0.00
vi. LV bushing No 2 3500.00 7000.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm ( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(16.882MT*30Mtr) Per MT/ Mtr 506.46 80.00 0.00 40516.80 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 16.88 1134.00 0.00 19144.19 7500 4000 140282.57
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 26 0.00 469.00 12194.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 85621.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: SPEC, Sl No: ST-37382, YOM: 2007, which was failed at 2X5MVA, 33/11KV MUSS, Shedbal in Athani Taluka in O&M Division, HESCOM, Athani
Name plate details of power transformer OLTC Details
Make: SPEC Make CTR
Sl No: ST-37382 Sl No 2621888
Capacity: 5MVA Type EO-16
Volts at No load HV: 33KV LV: 11KV Steps 16
Amperes HV: 87.5 LV: 262.4 Weight/ volume without oil 393 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 327kg/380 Ltrs
Untanking Mass 6800kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3100Kg/ 3483 ltrs 1.422413793 157.5
Transport Mass 12900 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
Make:SPEC, Sl No:ST-37382, YOM: 2007 4200 25.75
2 EHV Grade Fresh Transformer Oil: (3483+380= Ltrs) + 3% wastage is 115.89 Total Oil: 3979 Ltrs as per HESCOM common SR-2025-26 page no 143, Sl.No: 155, item no:15.01 material code: 601400, For KL= 79911.00, For per ltr Rs:79.911/- Ltrs 3979 79.911 317965.87 0 5250 5250 3863.00 18.94761905 3863
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2025-26, (PageNo-53, SlNo-731, Item No-69.19) Nos 19 451 8569.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 125.44 0.00 11400 5407.5
5 Sub-Total amount of PART-A 326660.31 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 269967.1975 #REF!
Total amount of PART-A 269967
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116 (9.47 MT X 10Mtrs )= 94.70 Per MT/ Mtr 94.70 80.00 0.00 7576.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Shedbal (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 9.47 1655.00 0.00 15672.85 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Shedbal, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 9.47 1655.00 0.00 15672.85
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3800.00 129200.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3800.00 129200.00
iii. Transition resistors No's 3 2000 6000.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 3863 5.32 0.00 20551.16
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 2747.76 2747.76 0.00
iii. WTI relay No 1 2662.00 2662.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 4500.00 9000.00 0.00
vi. LV bushing No 3 3500.00 10500.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.90 2061.00 0.00 26586.90
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 (actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.90 2061.00 0.00 26586.90 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(12.90MT*30Mtr) Per MT/ Mtr 387.00 80.00 0.00 30960.00 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 12.90 1134.00 0.00 14628.60 7500 4000 104412.22
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 19 0.00 469.00 8911.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 82338.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 585000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1846000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 336600.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2767600.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 3265768.00 3091878.00 8.47
REPORT : This is an estimate amounting to Rs. 32,65,768/- (Rupees. Thirty two Lakhs Sixty five thousands Seven hundred & Sixty eight Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 16.09.2023 for its insulation resistance values, HV & LV magnetic balance test & open circuit test results are found satisfactory, But 1). the Test results of SC test found unsatisfactorily. Neutral drawing abnormal current in SC test 2). In winding resistance test YB phase shows high resistance compared to RY & BR.It is suspected that, “Y” phase both HV and LV winding faulty, Detailed inspection of internal live parts of the power transformer is to be carried out to ascertain the exact nature of fault at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2023-24/165-68 Dated 16.09.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: GEC India Limited OLTC Details: #REF! #REF! #REF!
Sl No: 214019/2 Make:Crompton parkinson Ltd England #REF! #REF! #REF!
Capacity: 5MVA Type: F317331300
YOM 1971 Sl No: 41370151 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 418V
Amperes HV: 87.5 LV: 262.43 Total Weight: 1270 Kg appx 1622
Vector Group DYn11 Volume of Oil: 760 ltrs(appx)
Untanking mass 12980 Kg Mass of Oil : 660 Kgs(appx)
Mass of Oil in Kg/Liters 3902Kg/ 4500 ltrs 3100
Total Mass 16882 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: GEC India Limited bearing Sl No: 214019/2
2 Fresh Transformer Oil: Oil released (5260= Ltrs) + 3% wastage is 157.8 Total Oil: 5417.8 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 5418 105.545 571842.81 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 26 469 12194 0 0 -169000.00
4 Miscellaneous towards unforseen requirements L/s 963.19 0.00 0.00 -273
Total amount of PART-A 585000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 173890.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.32 MT/ 30Mtr 80.00 0.00 29568.00 0.00 As per actuals in allotted station 985.6
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 12.32 2061.00 0.00 25391.52 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 12.320 186.00 0.00 2291.52 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 250 973.00 243250.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 779 939.00 731481.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2865 248.00 710520.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 5260 5.32 0.00 27983.20 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 0 2654.04 0.00 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 16.88 186.00 0.00 3140.05 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 16.88 2061.00 0.00 34793.80 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 16.88 MT/ 30Mtr 80.00 0.00 40516.80 0.00 As per actuals in allotted station 40512 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 973.16 57.77 -916000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 250.00 569.00 142250.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 26.00 0.00 469.00 12194.00 Good
Total amount of 'PART-C' 173890.00 -85140.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 17.03.2023 for its insulation resistance values, Further By using multimeter continuity checked. R phase HV-Ground, Y phase HV-Ground & B phase HV-Ground found continuity for different taps.(IR values of HV (R+Y+B) to EARTH is 2 MOhms) Drained out the oil upto inspection chamber, no finding observed and opened the top cover of OLTC no findings obserbed. For conducting the test for Open Circuit and Short Circuit while giving 3 ph power supply to HV side the “Y” phase fuse blown out immediately & unable to process the further transformer tests. From the above results. it is suspected that, HV side of transformer winding grounded, Hence recommended for thorough inspection at repairer bay. It can not be attended at site.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: No. BGK/BDM/AEE/AE/ 2022-23/417-22 Date: 18.03.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-09/24 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2925066 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000-09/24
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00 2341631.00 8.47
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot
The subject power transformer is tested on site, on 01.03.2021 for its insulation resistance values, HV & LV magnetic balance test & Short circuit test and open circuit test results are satisfactory, But insulation between HV and LV may be detoriated i.e PI value is only 0.28. It can not be attended at site.Hence recommended for reconditioning of insulation may be done at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2020-21/380-83 Dated 01.03.2021. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C
vii. HV bushing
viii. LV bushing
ix. wiring cable for above relays
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-08042 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2822589 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
SLNO Particulars Amount
1 Material Cost
2 Labour/Erection/Dismantaling Charges and Testing & Commissioning Charges
3 Cost of Civil engineering works
4 Basic Rate(Sum of SlNo.1to 3 )
5 Area of Specific loading Rates on Basic Rates (SlNo4)Wherever applicable
6 Appliacable GST on SLNo.4&5
7 Cost of the Estimate(Sum of SlNo.4 to 6)
8 Statutory Charges Such as PTCC, Electrical Inspectorate Payment towards Civic Bodies
9 Forest Clerance/ Crop Cut Compensation
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Mallur.
Name plate details of power transformer OLTC Details
Make: Crompton Greaves Ltd Off Load Tap Changer
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11
Core and Winding Mass 7800 Kg
Mass of Oil in Kg/Liters 3900Kg/ 4500 ltrs 11100
Total Mass 15000 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Total 4635 ('----a)
Empty oil barrels (Good) 22.18 appr. 22 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7800 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2340 ('----c)
Only copper winidng weight ( 80% of c) 1872 ('----d)
Only Solid insulation weight ( 20% of c) 468
For 1 Limb winding weight (d/3) 624 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1872
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1622 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 4635 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.00
8. Loading of the faulty power transformer from the site. 11.100
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: GEC Make: Crompton Greaves
Capacity: 5MVA Type: F.3.17/33/100
YOM 1985 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 610 Kg
Untanking Mass 5900 Kg Oil is selector Switch tank: 660Kg/760 Ltrs
Mass of Oil in Kg/Liters 2870Kg/ 3300 ltrs Total weight : 1270Kg 11100
Total Mass 14500 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3300
Wastage 3% 121.8
Empty oil barrels (Good) 20.01 appr. 20 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5900 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1770 ('----c)
Only copper winidng weight ( 80% of c) 1416 ('----d)
Only Solid insulation weight ( 20% of c) 354
For 1 Limb winding weight (d/3) 472 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1416
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1266 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 250
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 4060 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 14.50
8. Loading of the faulty power transformer from the site. 10.970 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: Techno Power Corporation Make CTR
Capacity: 5MVA Type EO16
YOM 2008 YOM 2007
Volts at No load HV: 33KV LV: 11KV Steps 16
Amperes HV: 87.4 LV: 262.4 Weight/ volume wothout oil 393 Kg
Vector Group DYn11 Oil 327Kg/380 ltr
Untanking Mass 10465 Kg Direction of Power flow HV to LV: 100%,
Volume of Oil in Liters 3100 ltrs LV to HV:--- 11100
Transport Mass 13100Kg Frequency 50 Hz
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Empty oil barrels (Good) 17.15 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 10465 10.46 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3139.5 ('----c)
Only copper winidng weight ( 80% of c) 2511.6 ('----d)
Only Solid insulation weight ( 20% of c) 627.9
For 1 Limb winding weight (d/3) 837.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2511.6
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 2261.6 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 200
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 3480 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.10
8. Loading of the faulty power transformer from the site. 9.980 9983.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Alagawadi.
Name plate details of power transformer OLTC Details
Make: Kirloskar Off Load Tap Changer
Sl No: 80 SG-018/2
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11 15370
Core and Winding Mass 7230 5922.5
Mass of Oil in Kg/Liters 5923Kg/ 5150 ltrs
Total Mass 15370 Kg 9447.5
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4400
Wastage 3% 154.5
Empty oil barrels (Good) 25.38 appr. 26 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7230 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2169 ('----c)
Only copper winidng weight ( 80% of c) 1735.2 ('----d)
Only Solid insulation weight ( 20% of c) 433.8
For 1 Limb winding weight (d/3) 578.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1735.2
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1485.2 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 5304.5 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.30
8. Loading of the faulty power transformer from the site. 9.400
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Muragundi
Name plate details of power transformer OLTC Details
Make: GEC Make: CTR
Capacity: 5MVA Type: -
YOM 2008 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 720 Kg
Untanking Mass 5500 Oil is selector Switch tank: 380 Ltrs 13500
Mass of Oil in Kg/Liters 3800Kg/ 3300 ltrs Total weight : 1157 Kg 3795
Total Mass 13500 Kg 9705
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3000
Wastage 3% 101.4
Empty oil barrels (Good) 16.66 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5500 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1650 ('----c)
Only copper winidng weight ( 80% of c) 1320 ('----d)
Only Solid insulation weight ( 20% of c) 330
For 1 Limb winding weight (d/3) 440 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1320
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1170 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 3380 6613 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.50 3887
8. Loading of the faulty power transformer from the site. 9613.000 6713 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: GEC India Limited Make:Crompton parkinson Ltd England
Volts: 33kV/11kV Sl No: 41370151
Amps: 87.5A/262.43 A Rated Step Voltage: 418V
Untanking Mass: 12980 kgs Total Weight: 1270 Kg appx
Mass of Oil: 3902 kgs Volume of Oil: 760 ltrs(appx) 1270
Volume of Oil: 4500 Ltrs Mass of Oil : 660 Kgs(appx)
Transport Mass: 16882 Kgs
Total Mass: 16882 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Wastage 3% 157.8
Total 5418 Litre ('----a)
Empty oil barrels (Good) in Nos Total 26
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 12980 12.98 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3894 ('----c)
Only copper winidng weight ( 80% of c) 3115.2 ('----d)
Only Solid insulation weight ( 20% of c) 779
For 1 Limb winding weight (d/3) 1038.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 3115.2
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2865 Appr 250Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 5260
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 16.88
8. Loading of the faulty power transformer from the site in Tons 12.320
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Haligeri.
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-08042 Type: E016
Volts: 33kV/11kV Sl No: 2822589
Amps: 87.4A/262.4 A Rated Step Voltage: 412.5V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-09/24 Type: E016
Volts: 33kV/11kV Sl No: 2925066
Amps: 87.4A/262.4 A Rated Step Voltage: 413V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani
Sl. No. Particulars Material Erection Transit Insuranace Total
1 Material cost 1374649.54 1374649.54
2 Labour charges 432863.43 432863.43
3 Transit Insuranace 10000.00 10000.00
5 Apllicable GST on Sum SLNo- 4 0.00 0.00 0.00 0.00
6 Cost of estimate (Sum of Sl No 4 to 5) 1374649.54 432863.43 10000.00 1817512.97
Tender Component 0.00 0.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Sl. No Particulars As per Sanctioned Estimate Cost
1a Materials Cost (Exclusive of GST) Material Supplied by HESCOM 481900.30 1199894.3
1 b Materials Cost (Exclusive of GST) Material Supplied by Agency 1390004.78 #REF!
2a Labour Charges (Exclusive of GST) Carried out by HESCOM Employees 0.00
2b Labour Charges (Exclusive of GST) Carried out by Agency 432863.43
3 Basic Rate (Sum of SLNo.1a, 1b, 2a & 2b ) 2304768.51 1822868.21
4 Area Specific Loading on Basic rates (Slno-3) Wherever applicable 0.00 2150984.485
5 Apllicable GST on Sum SLNo- 3&4 414858.33
6 Cost of Estimate (Sum of SlNo-3 to 5) Amount Put to tender 2719626.84
7 Satutory Charges as per actual + Applicable GST on Satutory Charges (Inspectorate Charges, Civic Body Chrges, Compensation etc.,) 0.00
8 Total Cost of the estimate(Sum of SlNo.6 &7 ) 2719626.84
REPORT: The provisional estimate Rs. 2498315/- for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
The existing 5MVA,33/11KV Power transformer No.3, Make:GEC, Sl. No.: 214017/3, YOM:1971 at 33/11KV Sub-Station Mangsuli in O & M Division, HESCOM, Athani was experienced a trouble on dated 25.09.2025 around 11:45 am at the same 5MVA Power Transformer No-3 was tripped on OC and BH relays. After releasing gas from the BH relay and resetting the protection, a test charge was taken at 12:25 pm. However, the transformer tripped again immediately on OC and EF Relay. And the same was intimated to the BDM Staff HESCOM Chikkodi. The Asst. Executive Engineer(El), BDM Sub-Division, HESCOM Chikkodi along with staff had visited the station and observed carried out detailed testing of the transformer. The results revealed a shift of current towards neutral from the B-phase during the short circuit test, which is an anomaly. Furthermore, a large current was recorded in the LV MBT test on the neutral side, indicating a possible B-phase winding damage. During inspection, the top lid of the main transformer tank was opened to verify the firmness of the windings, which was found satisfactory. However, metallic granules were noticed inside the tank, and a burning smell of oil was observed, therefore, the above said troubled Power Transformer has to be shifted to the Power Transformer repair center for rectification and detail analysis of the quantum of damage internaly occured. Hence, The Assistant Executive Engineer(El) BDM Sub-Division HESCOM Chikkodi had declared that the above said 5MVA, 33/11KV Power Transformer was failed and submitted the detail report vide their office letter No CKD/AEE(El)/BDM/2025-26/125 Dated:26.09.2025 3780
This provisional estiamte is prepared as per the test results obtained and based on physical through inspection of Power Transformer at the site during test. However, actual quantity/ cost of estimate will be submitted after the detail inspection of all the internal parts of the subject power transformer by joint inspection committe constituted under the chairmanship of Honrable DT HESCOM Hubballi and members Chief Engineer O&M Zone, HESCOM, Belagavi, Executive Engineer (Ele) 33KV S&L Division, HESCOM, Belagavi and convener Executive Engineer (Ele) MRT Division, HESCOM, Belagavi.
Therefore, this estimate is prepared for repairs and reconditioning of faulty 5MVA, 33/11KV Power Transformer Make: GEC, Sl No: 214017/3, YOM:1971 which was failed on 26.09.2025 at 3X5MVA, 33/11KV MUSS, Mangsuli. The necessary spares and adequate labour charges are included in this estimate. Hence kindly requested to sanction the estimate at an early.
CERTIFICATE: I have personally visited the spot & prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Junior Engineer(Ele.)
33/11 MUSS, HESCOM,
CERTIFICATE: I have personally visited the spot & got prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Assistant Executive Engineer(Ele)
33KV S&L Sub-Division, HESCOM, Athani
Executive Engineer (Ele.) Superintending Engineer (El.
33KV S&L Division, HESCOM, Belagavi. O&M Circle, HESCOM, Chikkodi
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Name plate details of power transformer OLTC Details
Make: GEC Make CG
Capacity: 5MVA Type F317.33/300
YOM 1971 YOM NA 12320
Volts at No load HV: 33KV LV: 11KV Steps -
Amperes HV: 87.5 LV: 262.5 Weight/ volume without oil 610 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660kg/750 Ltrs
Untanking Mass 6670 kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3902Kg/ 4500 ltrs 1.422413793 157.5
Transport Mass 16882 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
2 EHV Grade Fresh Transformer Oil: O (5250+157.5= Ltrs) + 3% wastage is 115.89 Total Oil: 5408 Ltrs as per CSR-2023-24(Page No.24 SlNo-120 Item No.15.01) Ltrs 5408 105.545 570787.36 0 5250 5250 3863.00 18.94761905 3863 1295318
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2023-(PageNo-16 of 86 SlNo-120 Item No-15.01) Nos 26 469 12194.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 118.00 0.00 11400 5407.5
5 Sub-Total amount of PART-A 583099.36 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 481900.2975 #REF!
Total amount of PART-A 481900
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116(12.32 MT X 10Mtrs )= 123.2 Per MT/ Mtr 123.20 80.00 0.00 9856.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Nandagaon (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3850.00 130900.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3850.00 130900.00
iii. Transition resistors No's 3 3500.00 10500.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 5250 5.32 0.00 27930.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 5525.00 5525.00 0.00
iii. WTI relay No 1 6340.00 6340.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 5000.00 10000.00 0.00
vi. LV bushing No 2 3500.00 7000.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm ( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(16.882MT*30Mtr) Per MT/ Mtr 506.46 80.00 0.00 40516.80 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 16.88 1134.00 0.00 19144.19 7500 4000 140282.57
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 26 0.00 469.00 12194.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 85621.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani
Name plate details of power transformer OLTC Details
Make: GEC Make CG
Capacity: 5MVA Type F317.33/300
YOM 1971 YOM NA 12320
Volts at No load HV: 33KV LV: 11KV Steps -
Amperes HV: 87.5 LV: 262.5 Weight/ volume without oil 610 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660kg/750 Ltrs
Untanking Mass 6670 kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3902Kg/ 4500 ltrs 1.422413793 157.5
Transport Mass 16882 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
2 EHV Grade Fresh Transformer Oil: (4500+750= Ltrs) + 3% wastage is 157.5Total Oil: 5408 Ltrs as per HESCOM common SR-2025-26 page no 143, Sl.No: 155, item no:15.01 material code: 601400, For KL= 79911.00, For per ltr Rs:79.911/- Ltrs 5408 79.911 432158.69 0 5250 5250 3863.00 18.94761905 3863
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2025-26, (PageNo-53, SlNo-731, Item No-69.19) Nos 26 451 11726.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 118.00 0.00 11400 5407.5
5 Sub-Total amount of PART-A 444002.69 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 366944.3702 #REF!
Total amount of PART-A 366944
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116 (12.32 MT X 10Mtrs )= 123.2 Per MT/ Mtr 123.20 80.00 0.00 9856.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Mangsuli (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.32 1655.00 0.00 20389.60 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.32 1655.00 0.00 20389.60
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3800.00 129200.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3800.00 129200.00
iii. Transition resistors No's 3 2000 6000.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 5250 5.32 0.00 27930.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 2747.76 2747.76 0.00
iii. WTI relay No 1 2662.00 2662.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 4500.00 9000.00 0.00
vi. LV bushing No 2 3500.00 7000.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 (actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(16.882MT*30Mtr) Per MT/ Mtr 506.46 80.00 0.00 40516.80 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 16.88 1134.00 0.00 19144.19 7500 4000 140282.57
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 26 0.00 469.00 12194.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 85621.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 585000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1846000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 336600.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2767600.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 3265768.00 3091878.00 8.47
REPORT : This is an estimate amounting to Rs. 32,65,768/- (Rupees. Thirty two Lakhs Sixty five thousands Seven hundred & Sixty eight Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 16.09.2023 for its insulation resistance values, HV & LV magnetic balance test & open circuit test results are found satisfactory, But 1). the Test results of SC test found unsatisfactorily. Neutral drawing abnormal current in SC test 2). In winding resistance test YB phase shows high resistance compared to RY & BR.It is suspected that, “Y” phase both HV and LV winding faulty, Detailed inspection of internal live parts of the power transformer is to be carried out to ascertain the exact nature of fault at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2023-24/165-68 Dated 16.09.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: GEC India Limited OLTC Details: #REF! #REF! #REF!
Sl No: 214019/2 Make:Crompton parkinson Ltd England #REF! #REF! #REF!
Capacity: 5MVA Type: F317331300
YOM 1971 Sl No: 41370151 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 418V
Amperes HV: 87.5 LV: 262.43 Total Weight: 1270 Kg appx 1622
Vector Group DYn11 Volume of Oil: 760 ltrs(appx)
Untanking mass 12980 Kg Mass of Oil : 660 Kgs(appx)
Mass of Oil in Kg/Liters 3902Kg/ 4500 ltrs 3100
Total Mass 16882 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: GEC India Limited bearing Sl No: 214019/2
2 Fresh Transformer Oil: Oil released (5260= Ltrs) + 3% wastage is 157.8 Total Oil: 5417.8 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 5418 105.545 571842.81 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 26 469 12194 0 0 -169000.00
4 Miscellaneous towards unforseen requirements L/s 963.19 0.00 0.00 -273
Total amount of PART-A 585000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 173890.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.32 MT/ 30Mtr 80.00 0.00 29568.00 0.00 As per actuals in allotted station 985.6
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 12.32 2061.00 0.00 25391.52 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 12.320 186.00 0.00 2291.52 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 250 973.00 243250.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 779 939.00 731481.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2865 248.00 710520.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 5260 5.32 0.00 27983.20 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 0 2654.04 0.00 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 16.88 186.00 0.00 3140.05 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 16.88 2061.00 0.00 34793.80 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 16.88 MT/ 30Mtr 80.00 0.00 40516.80 0.00 As per actuals in allotted station 40512 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 973.16 57.77 -916000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 250.00 569.00 142250.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 26.00 0.00 469.00 12194.00 Good
Total amount of 'PART-C' 173890.00 -85140.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 17.03.2023 for its insulation resistance values, Further By using multimeter continuity checked. R phase HV-Ground, Y phase HV-Ground & B phase HV-Ground found continuity for different taps.(IR values of HV (R+Y+B) to EARTH is 2 MOhms) Drained out the oil upto inspection chamber, no finding observed and opened the top cover of OLTC no findings obserbed. For conducting the test for Open Circuit and Short Circuit while giving 3 ph power supply to HV side the “Y” phase fuse blown out immediately & unable to process the further transformer tests. From the above results. it is suspected that, HV side of transformer winding grounded, Hence recommended for thorough inspection at repairer bay. It can not be attended at site.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: No. BGK/BDM/AEE/AE/ 2022-23/417-22 Date: 18.03.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-09/24 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2925066 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000-09/24
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00 2341631.00 8.47
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot
The subject power transformer is tested on site, on 01.03.2021 for its insulation resistance values, HV & LV magnetic balance test & Short circuit test and open circuit test results are satisfactory, But insulation between HV and LV may be detoriated i.e PI value is only 0.28. It can not be attended at site.Hence recommended for reconditioning of insulation may be done at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2020-21/380-83 Dated 01.03.2021. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C
vii. HV bushing
viii. LV bushing
ix. wiring cable for above relays
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-08042 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2822589 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
SLNO Particulars Amount
1 Material Cost
2 Labour/Erection/Dismantaling Charges and Testing & Commissioning Charges
3 Cost of Civil engineering works
4 Basic Rate(Sum of SlNo.1to 3 )
5 Area of Specific loading Rates on Basic Rates (SlNo4)Wherever applicable
6 Appliacable GST on SLNo.4&5
7 Cost of the Estimate(Sum of SlNo.4 to 6)
8 Statutory Charges Such as PTCC, Electrical Inspectorate Payment towards Civic Bodies
9 Forest Clerance/ Crop Cut Compensation
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Mallur.
Name plate details of power transformer OLTC Details
Make: Crompton Greaves Ltd Off Load Tap Changer
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11
Core and Winding Mass 7800 Kg
Mass of Oil in Kg/Liters 3900Kg/ 4500 ltrs 11100
Total Mass 15000 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Total 4635 ('----a)
Empty oil barrels (Good) 22.18 appr. 22 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7800 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2340 ('----c)
Only copper winidng weight ( 80% of c) 1872 ('----d)
Only Solid insulation weight ( 20% of c) 468
For 1 Limb winding weight (d/3) 624 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1872
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1622 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 4635 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.00
8. Loading of the faulty power transformer from the site. 11.100
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: GEC Make: Crompton Greaves
Capacity: 5MVA Type: F.3.17/33/100
YOM 1985 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 610 Kg
Untanking Mass 5900 Kg Oil is selector Switch tank: 660Kg/760 Ltrs
Mass of Oil in Kg/Liters 2870Kg/ 3300 ltrs Total weight : 1270Kg 11100
Total Mass 14500 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3300
Wastage 3% 121.8
Empty oil barrels (Good) 20.01 appr. 20 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5900 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1770 ('----c)
Only copper winidng weight ( 80% of c) 1416 ('----d)
Only Solid insulation weight ( 20% of c) 354
For 1 Limb winding weight (d/3) 472 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1416
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1266 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 250
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 4060 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 14.50
8. Loading of the faulty power transformer from the site. 10.970 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: Techno Power Corporation Make CTR
Capacity: 5MVA Type EO16
YOM 2008 YOM 2007
Volts at No load HV: 33KV LV: 11KV Steps 16
Amperes HV: 87.4 LV: 262.4 Weight/ volume wothout oil 393 Kg
Vector Group DYn11 Oil 327Kg/380 ltr
Untanking Mass 10465 Kg Direction of Power flow HV to LV: 100%,
Volume of Oil in Liters 3100 ltrs LV to HV:--- 11100
Transport Mass 13100Kg Frequency 50 Hz
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Empty oil barrels (Good) 17.15 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 10465 10.46 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3139.5 ('----c)
Only copper winidng weight ( 80% of c) 2511.6 ('----d)
Only Solid insulation weight ( 20% of c) 627.9
For 1 Limb winding weight (d/3) 837.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2511.6
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 2261.6 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 200
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 3480 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.10
8. Loading of the faulty power transformer from the site. 9.980 9983.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Alagawadi.
Name plate details of power transformer OLTC Details
Make: Kirloskar Off Load Tap Changer
Sl No: 80 SG-018/2
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11 15370
Core and Winding Mass 7230 5922.5
Mass of Oil in Kg/Liters 5923Kg/ 5150 ltrs
Total Mass 15370 Kg 9447.5
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4400
Wastage 3% 154.5
Empty oil barrels (Good) 25.38 appr. 26 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7230 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2169 ('----c)
Only copper winidng weight ( 80% of c) 1735.2 ('----d)
Only Solid insulation weight ( 20% of c) 433.8
For 1 Limb winding weight (d/3) 578.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1735.2
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1485.2 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 5304.5 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.30
8. Loading of the faulty power transformer from the site. 9.400
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Muragundi
Name plate details of power transformer OLTC Details
Make: GEC Make: CTR
Capacity: 5MVA Type: -
YOM 2008 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 720 Kg
Untanking Mass 5500 Oil is selector Switch tank: 380 Ltrs 13500
Mass of Oil in Kg/Liters 3800Kg/ 3300 ltrs Total weight : 1157 Kg 3795
Total Mass 13500 Kg 9705
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3000
Wastage 3% 101.4
Empty oil barrels (Good) 16.66 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5500 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1650 ('----c)
Only copper winidng weight ( 80% of c) 1320 ('----d)
Only Solid insulation weight ( 20% of c) 330
For 1 Limb winding weight (d/3) 440 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1320
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1170 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 3380 6613 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.50 3887
8. Loading of the faulty power transformer from the site. 9613.000 6713 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: GEC India Limited Make:Crompton parkinson Ltd England
Volts: 33kV/11kV Sl No: 41370151
Amps: 87.5A/262.43 A Rated Step Voltage: 418V
Untanking Mass: 12980 kgs Total Weight: 1270 Kg appx
Mass of Oil: 3902 kgs Volume of Oil: 760 ltrs(appx) 1270
Volume of Oil: 4500 Ltrs Mass of Oil : 660 Kgs(appx)
Transport Mass: 16882 Kgs
Total Mass: 16882 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Wastage 3% 157.8
Total 5418 Litre ('----a)
Empty oil barrels (Good) in Nos Total 26
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 12980 12.98 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3894 ('----c)
Only copper winidng weight ( 80% of c) 3115.2 ('----d)
Only Solid insulation weight ( 20% of c) 779
For 1 Limb winding weight (d/3) 1038.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 3115.2
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2865 Appr 250Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 5260
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 16.88
8. Loading of the faulty power transformer from the site in Tons 12.320
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Haligeri.
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-08042 Type: E016
Volts: 33kV/11kV Sl No: 2822589
Amps: 87.4A/262.4 A Rated Step Voltage: 412.5V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-09/24 Type: E016
Volts: 33kV/11kV Sl No: 2925066
Amps: 87.4A/262.4 A Rated Step Voltage: 413V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Repair and Reconditioning of faulty 5MVA, 33/11KV Power transformer of Make: Techno Power Corporation, Sl No: TPC/33/11500008037, YOM : 2008 which was failed at 33/11KV MUSS, Benadi in Chikodi Taluka in O&M Division, HESCOM, Chikodi
Sl. No. Particulars Material Erection Transit Insuranace Total
1 Material cost 1210100.00 1210100.00
2 Labour charges 394381.17 394381.17
3 Transit Insuranace 10000.00 10000.00
5 Apllicable GST on Sum Sl No- 4 0.00 0.00 0.00 0.00
6 Cost of estimate (Sum of Sl No 4 to 5) 1210100.00 394381.17 10000.00 1614481.17
Tender Component 0.00 0.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Sl. No Particulars As per Sanctioned Estimate Cost
1a Materials Cost (Exclusive of GST) Material Supplied by HESCOM 481900.30 1199894.3
1 b Materials Cost (Exclusive of GST) Material Supplied by Agency 1390004.78 #REF!
2a Labour Charges (Exclusive of GST) Carried out by HESCOM Employees 0.00
2b Labour Charges (Exclusive of GST) Carried out by Agency 432863.43
3 Basic Rate (Sum of SLNo.1a, 1b, 2a & 2b ) 2304768.51 1822868.21
4 Area Specific Loading on Basic rates (Slno-3) Wherever applicable 0.00 2150984.485
5 Apllicable GST on Sum SLNo- 3&4 414858.33
6 Cost of Estimate (Sum of SlNo-3 to 5) Amount Put to tender 2719626.84
7 Satutory Charges as per actual + Applicable GST on Satutory Charges (Inspectorate Charges, Civic Body Chrges, Compensation etc.,) 0.00
8 Total Cost of the estimate(Sum of SlNo.6 &7 ) 2719626.84
REPORT: The provisional estimate Rs. 2498315/- for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
The existing 5MVA,33/11KV Power transformer No.3, Make:GEC, Sl. No.: 214017/3, YOM:1971 at 33/11KV Sub-Station Mangsuli in O & M Division, HESCOM, Athani was experienced a trouble on dated 25.09.2025 around 11:45 am at the same 5MVA Power Transformer No-3 was tripped on OC and BH relays. After releasing gas from the BH relay and resetting the protection, a test charge was taken at 12:25 pm. However, the transformer tripped again immediately on OC and EF Relay. And the same was intimated to the BDM Staff HESCOM Chikkodi. The Asst. Executive Engineer(El), BDM Sub-Division, HESCOM Chikkodi along with staff had visited the station and observed carried out detailed testing of the transformer. The results revealed a shift of current towards neutral from the B-phase during the short circuit test, which is an anomaly. Furthermore, a large current was recorded in the LV MBT test on the neutral side, indicating a possible B-phase winding damage. During inspection, the top lid of the main transformer tank was opened to verify the firmness of the windings, which was found satisfactory. However, metallic granules were noticed inside the tank, and a burning smell of oil was observed, therefore, the above said troubled Power Transformer has to be shifted to the Power Transformer repair center for rectification and detail analysis of the quantum of damage internaly occured. Hence, The Assistant Executive Engineer(El) BDM Sub-Division HESCOM Chikkodi had declared that the above said 5MVA, 33/11KV Power Transformer was failed and submitted the detail report vide their office letter No CKD/AEE(El)/BDM/2025-26/125 Dated:26.09.2025 3780
This provisional estiamte is prepared as per the test results obtained and based on physical through inspection of Power Transformer at the site during test. However, actual quantity/ cost of estimate will be submitted after the detail inspection of all the internal parts of the subject power transformer by joint inspection committe constituted under the chairmanship of Honrable DT HESCOM Hubballi and members Chief Engineer O&M Zone, HESCOM, Belagavi, Executive Engineer (Ele) 33KV S&L Division, HESCOM, Belagavi and convener Executive Engineer (Ele) MRT Division, HESCOM, Belagavi.
Therefore, this estimate is prepared for repairs and reconditioning of faulty 5MVA, 33/11KV Power Transformer Make: GEC, Sl No: 214017/3, YOM:1971 which was failed on 26.09.2025 at 3X5MVA, 33/11KV MUSS, Mangsuli. The necessary spares and adequate labour charges are included in this estimate. Hence kindly requested to sanction the estimate at an early.
CERTIFICATE: I have personally visited the spot & prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Junior Engineer(Ele.)
33/11 MUSS, HESCOM,
CERTIFICATE: I have personally visited the spot & got prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Assistant Executive Engineer(Ele)
33KV S&L Sub-Division, HESCOM, Athani
Executive Engineer (Ele.) Superintending Engineer (El.
33KV S&L Division, HESCOM, Belagavi. O&M Circle, HESCOM, Chikkodi
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Name plate details of power transformer OLTC Details
Make: GEC Make CG
Capacity: 5MVA Type F317.33/300
YOM 1971 YOM NA 12320
Volts at No load HV: 33KV LV: 11KV Steps -
Amperes HV: 87.5 LV: 262.5 Weight/ volume without oil 610 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660kg/750 Ltrs
Untanking Mass 6670 kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3902Kg/ 4500 ltrs 1.422413793 157.5
Transport Mass 16882 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
2 EHV Grade Fresh Transformer Oil: O (5250+157.5= Ltrs) + 3% wastage is 115.89 Total Oil: 5408 Ltrs as per CSR-2023-24(Page No.24 SlNo-120 Item No.15.01) Ltrs 5408 105.545 570787.36 0 5250 5250 3863.00 18.94761905 3863 1295318
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2023-(PageNo-16 of 86 SlNo-120 Item No-15.01) Nos 26 469 12194.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 118.00 0.00 11400 5407.5
5 Sub-Total amount of PART-A 583099.36 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 481900.2975 #REF!
Total amount of PART-A 481900
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116(12.32 MT X 10Mtrs )= 123.2 Per MT/ Mtr 123.20 80.00 0.00 9856.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Nandagaon (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3850.00 130900.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3850.00 130900.00
iii. Transition resistors No's 3 3500.00 10500.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 5250 5.32 0.00 27930.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 5525.00 5525.00 0.00
iii. WTI relay No 1 6340.00 6340.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 5000.00 10000.00 0.00
vi. LV bushing No 2 3500.00 7000.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm ( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(16.882MT*30Mtr) Per MT/ Mtr 506.46 80.00 0.00 40516.80 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 16.88 1134.00 0.00 19144.19 7500 4000 140282.57
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 26 0.00 469.00 12194.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 85621.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Repair and Reconditioning of faulty 5MVA, 33/11KV Power transformer of Make: Techno Power Corporation, Sl No: TPC/33/11500008037, YOM : 2008 which was failed at 33/11KV MUSS, Benadi in Chikodi Taluka in O&M Division, HESCOM, Chikodi
Name plate details of power transformer OLTC Details
Make: Techno Power Corporation Make CTR
Capacity: 5 MVA Type E016
Volts at No load NNP Steps 412.5 V
Amperes NNP Weight/ volume without oil - 1.162079511 1.136363636 1.153254741
Vector Group Dyn11 Oil 380 Ltrs
Untanking Mass 9765 Kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 2635 Kgs/3100 Ltrs 1.422413793 157.5
Transport Mass 12400 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
2 Fresh Transformer Oil: Oil released (3100 + 380 = 3480 Ltrs) + 3% wastage is 104 Toatal Oil: 3584 Ltrs as per CSR--2025-26, Page No. 143, Sl No. 155, Item No.15.01 Ltrs 3480 79.91 278086.80 0 5250 5250 3863.00 18.94761905 3863 3480
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2025-26-(PageNo-53, SlNo-731 Item No-69.19) Nos 17 451 7667.00 0 12060 157.5 115.89 115.89 104.4
4 Miscellaneous towards unforseen requirements L/s 40.20 11400 5407.5
5 Sub-Total amount of PART-A 285794.00 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 236193.3884 #REF!
Total amount of PART-A 236193
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116(9.05 MT X 10Mtrs )= 90.45 Per MT/ Mtr 90.45 80.00 0.00 7236.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Nandagaon (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 9.045 1655.00 0.00 14969.48 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 9.045 1655.00 0.00 14969.48
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 30 973.00 29190.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 150 776.00 116400.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3800.00 129200.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 3 3800.00 11400.00
iii. Transition resistors No's 3 2000 6000.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 3375 5.32 0.00 17955.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 2747.76 2747.76 0.00
iii. WTI relay No 1 2662.00 2662.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 3 4500.00 13500.00 0.00
vi. LV bushing No 4 3500.00 14000.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm ( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 13.12 2061.00 0.00 27040.32
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 13.12 2061.00 0.00 27040.32 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(16.882MT*30Mtr) Per MT/ Mtr 393.60 80.00 0.00 31488.00 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 13.12 1134.00 0.00 14878.08 7500 4000 101800.31
27 Miscellaneous towards unforseen requirements L/S 62.96 84.45 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 30.00 569.00 17070.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 150.00 133.00 19950.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 3 1.50 569.00 853.50 Scrap 161.43
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 1076.20 -155591.30
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 17 0.00 469.00 7973.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 54551.10
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 585000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1846000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 336600.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2767600.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 3265768.00 3091878.00 8.47
REPORT : This is an estimate amounting to Rs. 32,65,768/- (Rupees. Thirty two Lakhs Sixty five thousands Seven hundred & Sixty eight Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 16.09.2023 for its insulation resistance values, HV & LV magnetic balance test & open circuit test results are found satisfactory, But 1). the Test results of SC test found unsatisfactorily. Neutral drawing abnormal current in SC test 2). In winding resistance test YB phase shows high resistance compared to RY & BR.It is suspected that, “Y” phase both HV and LV winding faulty, Detailed inspection of internal live parts of the power transformer is to be carried out to ascertain the exact nature of fault at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2023-24/165-68 Dated 16.09.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: GEC India Limited OLTC Details: #REF! #REF! #REF!
Sl No: 214019/2 Make:Crompton parkinson Ltd England #REF! #REF! #REF!
Capacity: 5MVA Type: F317331300
YOM 1971 Sl No: 41370151 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 418V
Amperes HV: 87.5 LV: 262.43 Total Weight: 1270 Kg appx 1622
Vector Group DYn11 Volume of Oil: 760 ltrs(appx)
Untanking mass 12980 Kg Mass of Oil : 660 Kgs(appx)
Mass of Oil in Kg/Liters 3902Kg/ 4500 ltrs 3100
Total Mass 16882 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: GEC India Limited bearing Sl No: 214019/2
2 Fresh Transformer Oil: Oil released (5260= Ltrs) + 3% wastage is 157.8 Total Oil: 5417.8 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 5418 105.545 571842.81 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 26 469 12194 0 0 -169000.00
4 Miscellaneous towards unforseen requirements L/s 963.19 0.00 0.00 -273
Total amount of PART-A 585000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 173890.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.32 MT/ 30Mtr 80.00 0.00 29568.00 0.00 As per actuals in allotted station 985.6
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 12.32 2061.00 0.00 25391.52 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 12.320 186.00 0.00 2291.52 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 250 973.00 243250.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 779 939.00 731481.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2865 248.00 710520.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 5260 5.32 0.00 27983.20 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 0 2654.04 0.00 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 16.88 186.00 0.00 3140.05 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 16.88 2061.00 0.00 34793.80 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 16.88 MT/ 30Mtr 80.00 0.00 40516.80 0.00 As per actuals in allotted station 40512 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 973.16 57.77 -916000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 250.00 569.00 142250.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 26.00 0.00 469.00 12194.00 Good
Total amount of 'PART-C' 173890.00 -85140.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 17.03.2023 for its insulation resistance values, Further By using multimeter continuity checked. R phase HV-Ground, Y phase HV-Ground & B phase HV-Ground found continuity for different taps.(IR values of HV (R+Y+B) to EARTH is 2 MOhms) Drained out the oil upto inspection chamber, no finding observed and opened the top cover of OLTC no findings obserbed. For conducting the test for Open Circuit and Short Circuit while giving 3 ph power supply to HV side the “Y” phase fuse blown out immediately & unable to process the further transformer tests. From the above results. it is suspected that, HV side of transformer winding grounded, Hence recommended for thorough inspection at repairer bay. It can not be attended at site.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: No. BGK/BDM/AEE/AE/ 2022-23/417-22 Date: 18.03.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-09/24 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2925066 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000-09/24
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00 2341631.00 8.47
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot
The subject power transformer is tested on site, on 01.03.2021 for its insulation resistance values, HV & LV magnetic balance test & Short circuit test and open circuit test results are satisfactory, But insulation between HV and LV may be detoriated i.e PI value is only 0.28. It can not be attended at site.Hence recommended for reconditioning of insulation may be done at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2020-21/380-83 Dated 01.03.2021. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C
vii. HV bushing
viii. LV bushing
ix. wiring cable for above relays
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-08042 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2822589 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
SLNO Particulars Amount
1 Material Cost
2 Labour/Erection/Dismantaling Charges and Testing & Commissioning Charges
3 Cost of Civil engineering works
4 Basic Rate(Sum of SlNo.1to 3 )
5 Area of Specific loading Rates on Basic Rates (SlNo4)Wherever applicable
6 Appliacable GST on SLNo.4&5
7 Cost of the Estimate(Sum of SlNo.4 to 6)
8 Statutory Charges Such as PTCC, Electrical Inspectorate Payment towards Civic Bodies
9 Forest Clerance/ Crop Cut Compensation
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Mallur.
Name plate details of power transformer OLTC Details
Make: Crompton Greaves Ltd Off Load Tap Changer
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11
Core and Winding Mass 7800 Kg
Mass of Oil in Kg/Liters 3900Kg/ 4500 ltrs 11100
Total Mass 15000 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Total 4635 ('----a)
Empty oil barrels (Good) 22.18 appr. 22 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7800 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2340 ('----c)
Only copper winidng weight ( 80% of c) 1872 ('----d)
Only Solid insulation weight ( 20% of c) 468
For 1 Limb winding weight (d/3) 624 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1872
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1622 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 4635 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.00
8. Loading of the faulty power transformer from the site. 11.100
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: GEC Make: Crompton Greaves
Capacity: 5MVA Type: F.3.17/33/100
YOM 1985 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 610 Kg
Untanking Mass 5900 Kg Oil is selector Switch tank: 660Kg/760 Ltrs
Mass of Oil in Kg/Liters 2870Kg/ 3300 ltrs Total weight : 1270Kg 11100
Total Mass 14500 Kg
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3300
Wastage 3% 121.8
Empty oil barrels (Good) 20.01 appr. 20 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5900 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1770 ('----c)
Only copper winidng weight ( 80% of c) 1416 ('----d)
Only Solid insulation weight ( 20% of c) 354
For 1 Limb winding weight (d/3) 472 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1416
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1266 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 250
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 4060 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 14.50
8. Loading of the faulty power transformer from the site. 10.970 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Khanagaon.
Name plate details of power transformer OLTC Details
Make: Techno Power Corporation Make CTR
Capacity: 5MVA Type EO16
YOM 2008 YOM 2007
Volts at No load HV: 33KV LV: 11KV Steps 16
Amperes HV: 87.4 LV: 262.4 Weight/ volume wothout oil 393 Kg
Vector Group DYn11 Oil 327Kg/380 ltr
Untanking Mass 10465 Kg Direction of Power flow HV to LV: 100%,
Volume of Oil in Liters 3100 ltrs LV to HV:--- 11100
Transport Mass 13100Kg Frequency 50 Hz
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Empty oil barrels (Good) 17.15 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 10465 10.46 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3139.5 ('----c)
Only copper winidng weight ( 80% of c) 2511.6 ('----d)
Only Solid insulation weight ( 20% of c) 627.9
For 1 Limb winding weight (d/3) 837.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2511.6
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 2261.6 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 200
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 3480 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.10
8. Loading of the faulty power transformer from the site. 9.980 9983.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Alagawadi.
Name plate details of power transformer OLTC Details
Make: Kirloskar Off Load Tap Changer
Sl No: 80 SG-018/2
Volts at No load HV: 33KV LV: 11KV
Amperes HV: 87.5 LV: 262.5
Vector Group DYn11 15370
Core and Winding Mass 7230 5922.5
Mass of Oil in Kg/Liters 5923Kg/ 5150 ltrs
Total Mass 15370 Kg 9447.5
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4400
Wastage 3% 154.5
Empty oil barrels (Good) 25.38 appr. 26 Barrels
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg 7230 7.8 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2169 ('----c)
Only copper winidng weight ( 80% of c) 1735.2 ('----d)
Only Solid insulation weight ( 20% of c) 433.8
For 1 Limb winding weight (d/3) 578.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1735.2
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1485.2 Appx. 250Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) 5304.5 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 15.30
8. Loading of the faulty power transformer from the site. 9.400
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer failed at 33/11 KV MUSS Muragundi
Name plate details of power transformer OLTC Details
Make: GEC Make: CTR
Capacity: 5MVA Type: -
YOM 2008 Serivice Voltage: 33KV
Volts at No load HV: 33KV LV: 11KV Normal working current: 65.33A
Amperes HV: 87.53 LV: 262.5A No of service taping position : 17
Vector Group DYn11 Tap Changer excluding Oil : 720 Kg
Untanking Mass 5500 Oil is selector Switch tank: 380 Ltrs 13500
Mass of Oil in Kg/Liters 3800Kg/ 3300 ltrs Total weight : 1157 Kg 3795
Total Mass 13500 Kg 9705
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3000
Wastage 3% 101.4
Empty oil barrels (Good) 16.66 appr. 17 Barrels
PART B- REPAIR WORK
1. Weight of core and Winding 5500 5.9 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 1650 ('----c)
Only copper winidng weight ( 80% of c) 1320 ('----d)
Only Solid insulation weight ( 20% of c) 330
For 1 Limb winding weight (d/3) 440 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 1320
4. Providing re-insulation to HV/LV winding excluding of provoding new winding with insulation 1170 Appx. 150Kgs provision made for new winding
5. Providing CRGO Core (Appx.) 350
6. Filling of oil to the main tank and OLTC tank, filtering the oil includingfiltering till attainment of prescribed BDV values (--a) 3380 6613 350
7. Loading of the repaired good power transformer with oil & all its accessories after testing. 13.50 3887
8. Loading of the faulty power transformer from the site. 9613.000 6713 10970.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: GEC India Limited Make:Crompton parkinson Ltd England
Volts: 33kV/11kV Sl No: 41370151
Amps: 87.5A/262.43 A Rated Step Voltage: 418V
Untanking Mass: 12980 kgs Total Weight: 1270 Kg appx
Mass of Oil: 3902 kgs Volume of Oil: 760 ltrs(appx) 1270
Volume of Oil: 4500 Ltrs Mass of Oil : 660 Kgs(appx)
Transport Mass: 16882 Kgs
Total Mass: 16882 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 4500
Wastage 3% 157.8
Total 5418 Litre ('----a)
Empty oil barrels (Good) in Nos Total 26
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 12980 12.98 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 3894 ('----c)
Only copper winidng weight ( 80% of c) 3115.2 ('----d)
Only Solid insulation weight ( 20% of c) 779
For 1 Limb winding weight (d/3) 1038.4 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 3115.2
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2865 Appr 250Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 5260
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 16.88
8. Loading of the faulty power transformer from the site in Tons 12.320
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Haligeri.
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-08042 Type: E016
Volts: 33kV/11kV Sl No: 2822589
Amps: 87.4A/262.4 A Rated Step Voltage: 412.5V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Calculation Sheet for preparing estimate for repairing of faulty 5MVA 33/11KV Power Transformer-1 failed at 33/11 KV MUSS Bidari
Power transformer name plate details OLTC Details:
Make: Techno power Corporation Bangalore Make: CTR
Sl No: TPC/33/11/5000-09/24 Type: E016
Volts: 33kV/11kV Sl No: 2925066
Amps: 87.4A/262.4 A Rated Step Voltage: 413V
Untanking Mass: 9765 kgs Total Weight: 720 Kg appx
Mass of Oil: 2635 kgs Volume of Oil: 380 ltrs(appx)
Volume of Oil: 3100 Ltrs Mass of Oil : 327 Kgs(appx)
Transport Mass: 12400 Kgs
Total Mass: 12400 Kgs
Part-A HESCOM PORTION
Fresh Transformer Oil (Main tank + OLTC + Wastage 3%) Main Tank 3100
Wastage 3% 104.4
Total 3584 Litre ('----a)
Empty oil barrels (Good) in Nos Total 17
PART B- REPAIR WORK
1. Providing new winding- weight of core and Wdg in Kgs 9765 9.765 Tons ('----b)
2. Copper winding Weight including solid insulation ( 30% of b) 2929.5 ('----c)
Only copper winidng weight ( 80% of c) 2343.6 ('----d)
Only Solid insulation weight ( 20% of c) 586
For 1 Limb winding weight (d/3) 781.2 ('----e)
3. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2343.6
4. Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation- Two Limbs Wdg ( 3 X e) 2194 Appr 150Kg provision made for new winding
5. Providing CRGO Core (always Considered as 100Kg) 100
6. Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values (--a) in Litre 3480
7. Loading of the repaired good power transformer with oil & all its accessories after testing in Tons. 12.40
8. Loading of the faulty power transformer from the site in Tons 9.438
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC Sl. No.: 214021/2, YOM: 1971, which was failed at 2X5MVA, 33/11KV MUSS, Sankonatti in Athani Taluka in O&M Division, HESCOM, Athani
Sl. No. Particulars Material Erection Transit Insuranace Total
1 Material cost 1378149.54 1378149.54
2 Labour charges 450471.63 450471.63
3 Transit Insuranace 10000.00 10000.00
5 Apllicable GST on Sum SLNo- 4 0.00 0.00 0.00 0.00
6 Cost of estimate (Sum of Sl No 4 to 5) 1378149.54 450471.63 10000.00 1838621.17
Tender Component 0.00 0.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Sl. No Particulars As per Sanctioned Estimate Cost
1a Materials Cost (Exclusive of GST) Material Supplied by HESCOM 481900.30 1199894.3
1 b Materials Cost (Exclusive of GST) Material Supplied by Agency 1390004.78 #REF!
2a Labour Charges (Exclusive of GST) Carried out by HESCOM Employees 0.00
2b Labour Charges (Exclusive of GST) Carried out by Agency 432863.43
3 Basic Rate (Sum of SLNo.1a, 1b, 2a & 2b ) 2304768.51 1822868.21
4 Area Specific Loading on Basic rates (Slno-3) Wherever applicable 0.00 2150984.485
5 Apllicable GST on Sum SLNo- 3&4 414858.33
6 Cost of Estimate (Sum of SlNo-3 to 5) Amount Put to tender 2719626.84
7 Satutory Charges as per actual + Applicable GST on Satutory Charges (Inspectorate Charges, Civic Body Chrges, Compensation etc.,) 0.00
8 Total Cost of the estimate(Sum of SlNo.6 &7 ) 2719626.84
REPORT: The provisional estimate Rs. 2498315/- for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
The existing 5MVA,33/11KV Power transformer No.3, Make:GEC, Sl. No.: 214017/3, YOM:1971 at 33/11KV Sub-Station Mangsuli in O & M Division, HESCOM, Athani was experienced a trouble on dated 25.09.2025 around 11:45 am at the same 5MVA Power Transformer No-3 was tripped on OC and BH relays. After releasing gas from the BH relay and resetting the protection, a test charge was taken at 12:25 pm. However, the transformer tripped again immediately on OC and EF Relay. And the same was intimated to the BDM Staff HESCOM Chikkodi. The Asst. Executive Engineer(El), BDM Sub-Division, HESCOM Chikkodi along with staff had visited the station and observed carried out detailed testing of the transformer. The results revealed a shift of current towards neutral from the B-phase during the short circuit test, which is an anomaly. Furthermore, a large current was recorded in the LV MBT test on the neutral side, indicating a possible B-phase winding damage. During inspection, the top lid of the main transformer tank was opened to verify the firmness of the windings, which was found satisfactory. However, metallic granules were noticed inside the tank, and a burning smell of oil was observed, therefore, the above said troubled Power Transformer has to be shifted to the Power Transformer repair center for rectification and detail analysis of the quantum of damage internaly occured. Hence, The Assistant Executive Engineer(El) BDM Sub-Division HESCOM Chikkodi had declared that the above said 5MVA, 33/11KV Power Transformer was failed and submitted the detail report vide their office letter No CKD/AEE(El)/BDM/2025-26/125 Dated:26.09.2025 3780
This provisional estiamte is prepared as per the test results obtained and based on physical through inspection of Power Transformer at the site during test. However, actual quantity/ cost of estimate will be submitted after the detail inspection of all the internal parts of the subject power transformer by joint inspection committe constituted under the chairmanship of Honrable DT HESCOM Hubballi and members Chief Engineer O&M Zone, HESCOM, Belagavi, Executive Engineer (Ele) 33KV S&L Division, HESCOM, Belagavi and convener Executive Engineer (Ele) MRT Division, HESCOM, Belagavi.
Therefore, this estimate is prepared for repairs and reconditioning of faulty 5MVA, 33/11KV Power Transformer Make: GEC, Sl No: 214017/3, YOM:1971 which was failed on 26.09.2025 at 3X5MVA, 33/11KV MUSS, Mangsuli. The necessary spares and adequate labour charges are included in this estimate. Hence kindly requested to sanction the estimate at an early.
CERTIFICATE: I have personally visited the spot & prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Junior Engineer(Ele.)
33/11 MUSS, HESCOM,
CERTIFICATE: I have personally visited the spot & got prepared this estimate as per CSR 2023-24, MWSR-2023-24 , KPWDSR-2023-24 and Revised MWSR-2016 and 2019 for the most economical & safe way of execution of works.
Assistant Executive Engineer(Ele)
33KV S&L Sub-Division, HESCOM, Athani
Executive Engineer (Ele.) Superintending Engineer (El.
33KV S&L Division, HESCOM, Belagavi. O&M Circle, HESCOM, Chikkodi
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC, Sl No: 214017/3, YOM:1971, which was failed at 3X5MVA, 33/11KV MUSS, Mangsuli in Kagwad Taluka in O&M Division, HESCOM, Athani on dated: 26.09.2025 at 33/11KV sub-station, Mangsuli.
Name plate details of power transformer OLTC Details
Make: GEC Make CG
Capacity: 5MVA Type F317.33/300
YOM 1971 YOM NA 12320
Volts at No load HV: 33KV LV: 11KV Steps -
Amperes HV: 87.5 LV: 262.5 Weight/ volume without oil 610 Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660kg/750 Ltrs
Untanking Mass 6670 kg Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3902Kg/ 4500 ltrs 1.422413793 157.5
Transport Mass 16882 Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
2 EHV Grade Fresh Transformer Oil: O (5250+157.5= Ltrs) + 3% wastage is 115.89 Total Oil: 5408 Ltrs as per CSR-2023-24(Page No.24 SlNo-120 Item No.15.01) Ltrs 5408 105.545 570787.36 0 5250 5250 3863.00 18.94761905 3863 1295318
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2023-(PageNo-16 of 86 SlNo-120 Item No-15.01) Nos 26 469 12194.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 118.00 0.00 11400 5407.5
5 Sub-Total amount of PART-A 583099.36 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 481900.2975 #REF!
Total amount of PART-A 481900
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116(12.32 MT X 10Mtrs )= 123.2 Per MT/ Mtr 123.20 80.00 0.00 9856.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Nandagaon (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.320 1655.00 0.00 20389.60
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3850.00 130900.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3850.00 130900.00
iii. Transition resistors No's 3 3500.00 10500.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 5250 5.32 0.00 27930.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 5525.00 5525.00 0.00
iii. WTI relay No 1 6340.00 6340.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 5000.00 10000.00 0.00
vi. LV bushing No 2 3500.00 7000.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm ( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 16.88 1655.00 0.00 27939.71 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(16.882MT*30Mtr) Per MT/ Mtr 506.46 80.00 0.00 40516.80 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 16.88 1134.00 0.00 19144.19 7500 4000 140282.57
27 Miscellaneous towards unforseen requirements L/S 52.50 37.77 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 26 0.00 469.00 12194.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 85621.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBBALLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repair and reconditioning of faulty 5MVA, 33/11KV Power Transformer of Make: GEC Sl. No.: 214021/2, YOM: 1971, which was failed at 2X5MVA, 33/11KV MUSS, Sankonatti in Athani Taluka in O&M Division, HESCOM, Athani
Name plate details of power transformer OLTC Details
Make: GEC Make CG
Capacity: 5MVA Type F317-33-300
YOM 1971 YOM - 12320
Volts at No load HV: 33KV LV: 11KV Steps -
Amperes HV: 87.5 LV: 262.5 Weight/ volume without oil 610Kg 1.162079511 1.136363636 1.153254741
Vector Group DYn11 Oil 660Kg/750 Ltrs
Untanking Mass - Direction of Power flow HV to LV: 100%, LV to HV:--- 5250
Volume of Oil in Liters 3902Kg/ 4500 ltrs 1.422413793 157.5
Transport Mass 17212Kg Frequency 50 Hz 4050 14380-(3300+750) 5407.5
PART-A: HESCOM PORTION 121.5 4050 8629 25.75
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Remarks 4171.5 14220
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA Fresh oil to be supplied by HESCOM and shall be collected by the succesful bider through their own vehicle. #REF! 25.75238095
Make:GEC, Sl No:214021/2, YOM: 1971 4200 25.75
2 EHV Grade Fresh Transformer Oil: (4500+750= Ltrs) + 3% wastage is 157.5 Total Oil: 5407.5 Ltrs as per HESCOM common SR-2025-26 page no 143, Sl.No: 155, item no:15.01 material code: 601400, For KL= 79911.00, For per ltr Rs:79.911/- Ltrs 5407.5 79.911 432118.73 0 5250 5250 3863.00 18.94761905 3863
3 210 Ltrs capacity empty oil barrels(Good) as per CSR-2025-26, (PageNo-53, SlNo-731, Item No-69.19) Nos 26 451 11726.00 0 12060 157.5 115.89 115.89
4 Miscellaneous towards unforseen requirements L/s 91.41 0.00 11400 5407.5
5 Sub-Total amount of PART-A 443936.14 0.00 #REF! 9473
6 Since, above materials will be supplied from the departmental, 21% on above total to be deloaded 366889.374 #REF!
Total amount of PART-A 366889
PART-B: REPAIR WORKS 123.2 part C #REF!
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks 168.82
1 Moving the faulty power transformer to the loading point from the place in sub-station.Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per CSR-2023-24, Part-II, Sl.No-9(a) of Pg.No-116 (12.65 MT X 10Mtrs )= 126.5 Per MT/ Mtr 126.50 80.00 0.00 10120.00 As per actual quantity to be taken while preparing the bill. 291 3.092783505 94.70 39996 506.46
2 Loading of faulty power transformer main tank fitted with active parts (without oil) and transformer accessories such as radiators, Conservator tank rail wheels etc at 33/11KV MUSS, Sankonatti (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.65 1655.00 0.00 20935.75 168.82 168.82 291 40000 400
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S 0.00 0.00 0.00 0.00 5000.00 To be paid as per actual
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Mangsuli, Athani in appropriate transport vehicle i.e using Appropriate Transport Vehicle (KPTCL SR 2021-22, Page No.: 19, Sl. No.: 39, Item No.: A3) (Upto 250Kms.11 to 20 MT truck and trailer(actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer. 5857.5
5 Unloading of faulty power transformer with active parts & accessories at repairer's premises. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 12.65 1655.00 0.00 20935.75
6 Dismantling faulty transformer for joint inspection at repairers premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc, in the presence of HESCOM authorised representative. As per CSR 2023-24, Part-III, Sl No. 3 of Page 140. 5MVA 1 28290.00 0.00 28290.00
7 Providing new windings with insulation in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding.As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(ii).` Kgs 50 973.00 48650.00 0.00 Exact quantity will be known after joint survey. 875.7
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3B(i). Kgs 300 939.00 281700.00 0.00 Exact quantity will be known after joint survey. 845.1
9 Providing re-insulation to HV/LV windings wherever necessary for total weight of windings except solid insulation. of all the 3 limbs As per MWSR 2023-24 Part-III, Page-148, Sl.No-3C(i). Kgs 2000 248.00 496000.00 0.00 Exact quantity will be known after joint survey.
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour. As per MWSR 2023-24 Part-III, Page-148, Sl.No-3A(i). Kgs 200 776.00 155200.00 0.00 Exact quantity will be known after joint survey.
11 Repairing & overhauling of Off load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per CSR 2023-24, Part-III, Sl No. 4.A of Page 149. 5MVA 1 19643.00 0.00 19643.00
12 Replacement of faulty spares of OLTC/Divertor switch (spares shall be procured from the original manufacturers only)
i. Fixed contacts No's 34 3800.00 129200.00 Exact quantity will be known after joint survey.
ii. Moving contacts No's 34 3800.00 129200.00
iii. Transition resistors No's 3 2000 6000.00
iv. Tie rod with nuts No's 4 6250.00 25000.00
v. Miscellaneous OLTC materials. L/S 1 2000.00 2000.00
13 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting out side the tank with enamel paint after thorough cleaning including the cost of materials including the painting of radiators at site/ Firm. As per CSR 2023-24, Part-III, Sl No. 1(B) of Page 146. 5MVA 1 20269.00 0.00 20269.00
14 Re assembly of core and winding. As per CSR 2023-24, Part-III, Sl No. 5(E) of Page 142. 5MVA 1 33089.00 0.00 33089.00
15 Drying out the assembly of core and winding in oven / vacuum chamber, till the specified insulation resistance values are obtained. (Including cost of material and labour). As per CSR 2023-24, Part-III, Sl No. 5(B)(ii) of Page 141. 5MVA 1 39359.00 0.00 39359.00
16 Tanking the assembly giving connection, providing new gaskets and insulating materials conforming to relevant ISS putting back the cover, tightening the fixtures, fixing the bushing etc, including the cost of all materials like gaskets insulating material,Bolts & Nuts etc., and Labour. Other accessories at repairer work to facilitate the testing. As per CSR 2023-24, Part-III, Sl No. 1(C) of Page 147. 5MVA 1 18768.00 0.00 18768.00
17 Filling oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV values including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per MWSR 2023-24 Part-III, Page-142, Sl.No-5F. Ltrs 5250 5.32 0.00 27930.00
18 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) 0.00
i. Silica gel breather (2Nos) As per CSR 2023-24, Part-III, Sl No. 1(A) of Page 133. Set 1 2963.00 2963.00 0.00 Exact quantities will be known after joint survey.
ii. OTI Relay No 1 2747.76 2747.76 0.00
iii. WTI relay No 1 2662.00 2662.00 0.00
iv. BH Relay As per MWSR 2023-24 Part-3, Page No.138, Sl No: 6(A) No 1 8743.00 8743.00 0.00
v. HV bushing No 2 4500.00 9000.00 0.00
vi. LV bushing No 3 3500.00 10500.00 0.00
vii.Wiring cable for above relays Set 0 8000.00 0.00 0.00
viii.Transition resistors No 0 3500.00 0.00 0.00
xi. MOG As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 5(b) No 1 7410.00 7410.00 0.00
xii.Oil surge Relay (OSR)As per KPTCL 2023-24 Part-3, Page No.138, Sl No: 6(B) No 1 3743.00 3743.00 0.00
xi.. Radiator VALVES with gaskets 50 to 200 mm( KPTCL SR 2023-24 Page 135, sl,no.3, Item No.III) No 6 2223.00 13338.00 0.00
xi. VARIOUS TYPES OF VALVES No 6 4423.38 26540.28 0.00
19 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR-2023-24 Part-III, Page No. 143, Sl.No-7(b) 5MVA 1 18987.00 0.00 18987.00
20 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR 2023-24 Page No.144, Sl no: 7 c 5MVA 1 7605.05 0.00 7605.05
21 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actual
22 Loading of repaired good power transformer with oil & all its accessories (total mass as per name plate) at repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 17.21 2061.00 0.00 35469.81
23 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle As per MWSR-2019, Part-II, Sl No.39(a) (iii), Page: 96 (actual distance to be taken while billing) KMs 250 105.42 0.00 26355.00 The actual destignation and distanace will be known only after allotment of subject work to the tenderer.
24 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) repairer's premises after testing. (As per KPWD SR. 2023-24, the rates for loading of the 5MVA, 33/11KV Power transformer is not available and hence, the rates for loading of the power transformer is taken from the previous MW SR 2021-22. Pg. No. 7 item No. 25.05 Sl.No.:183 i.e Rs. 1655 per MT) MT 17.21 2061.00 0.00 35469.81 15193.8
25 Moving the repaired good power transformer to the plinth at the allotted sub-station. Maximum allowable distance is 50Mtrs (More than 50Mtrs approval of the D(T) has to be obtained) As per MWSR-2023-24 Part-II PageNo-116 Slno-9(a)(17.21MT*30Mtr) Per MT/ Mtr 516.36 80.00 0.00 41308.80 As per actual quantity to be taken while preparing the bill. 0.5627333333 506.46
26 Assembling of transformer parts Such as Radiators, Conservator tank, Breather, Base wheels, earthing of Trf, filling oil into the transformer main tank and conservator tank etc. for the total weight of the transformer MWSR-2023-24, Part-II, Page No: 116, sl No: 9(b) MT 17.21 1134.00 0.00 19516.14 7500 4000 157890.77
27 Miscellaneous towards unforseen requirements L/S 52.50 65.52 11500.00 5857.5
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
PART-C: CREDIT PORTION
Sl No Particulars Unit Nos Kgs Rate Material Cost Remark
1 Repaired good 5MVA power transformer of Make: GEC, Sl No: 214017/3, YOM: 1971 repaired by the work awarded agency) with oil and all its accessories No 1 VA VA VA Repaired good
2 Released copper wire as per MWSR-2023-24, Part-III, Sl No. 10(A) PageNo .139 Kgs - - 50.00 569.00 28450.00 Scrap
3 Released CRGO core laminations as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 Kgs - - 200.00 133.00 26600.00 Scrap
4 Released fixed contacts (OLTC) MWSR-2023-24, Part-III, Sl No. 10(a) PageNo .139 No's / kgs 34 8.50 569.00 4836.50 Scrap 914.77
5 Released Moving contact MWSR-2023-24, Part-III, Sl No. 10(a) Page No .139 No's / kgs 34 17.00 569.00 9673.00 Scrap 8980.93
6 Released BH, OTI, WTI, Silica gel breather ets iron scrap per as per MWSR-2023-24, Part-III, Sl No. 10(B) PageNo .139 No's/kg 1 No each 25.00 41.00 1025.00 Scrap 9895.70 -146771.80
7 210 Ltrs capacity empty oil barrels CSR-2023-24CSR-2023-4(PageNo-33 of 81 SlNo-614 Item No-69.19) No 26 0.00 469.00 12194.00 Good
8 Released HV Rod No's / kgs 3 3.00 315.90 947.70 Scrap
9 Released LV Rod No's / kgs 4 6.00 315.90 1895.40 Scrap
10 Released MOG No's 1 Scrap
11 Released Oil surge Relay (OSR) No's 1 Scrap
12 Released Radiator VALVES No's 6 Scrap
13 Released VARIOUS TYPES OF VALVES No's 6 Scrap
14 Released Transition resistors No's 3 Scrap
15 Released Tie rod with nuts No's 4 Scrap
Total amount of 'PART-C' 85621.60
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S&L Sub-Division,HESCOM, Athani 33/11KV MUSS HESCOM, Mangsuli.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 585000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1846000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 336600.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2767600.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 3265768.00 3091878.00 8.47
REPORT : This is an estimate amounting to Rs. 32,65,768/- (Rupees. Thirty two Lakhs Sixty five thousands Seven hundred & Sixty eight Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 16.09.2023 for its insulation resistance values, HV & LV magnetic balance test & open circuit test results are found satisfactory, But 1). the Test results of SC test found unsatisfactorily. Neutral drawing abnormal current in SC test 2). In winding resistance test YB phase shows high resistance compared to RY & BR.It is suspected that, “Y” phase both HV and LV winding faulty, Detailed inspection of internal live parts of the power transformer is to be carried out to ascertain the exact nature of fault at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2023-24/165-68 Dated 16.09.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: GEC bearing Sl No: 214019/2) which was failed on 16.09.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: GEC India Limited OLTC Details: #REF! #REF! #REF!
Sl No: 214019/2 Make:Crompton parkinson Ltd England #REF! #REF! #REF!
Capacity: 5MVA Type: F317331300
YOM 1971 Sl No: 41370151 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 418V
Amperes HV: 87.5 LV: 262.43 Total Weight: 1270 Kg appx 1622
Vector Group DYn11 Volume of Oil: 760 ltrs(appx)
Untanking mass 12980 Kg Mass of Oil : 660 Kgs(appx)
Mass of Oil in Kg/Liters 3902Kg/ 4500 ltrs 3100
Total Mass 16882 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: GEC India Limited bearing Sl No: 214019/2
2 Fresh Transformer Oil: Oil released (5260= Ltrs) + 3% wastage is 157.8 Total Oil: 5417.8 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 5418 105.545 571842.81 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 26 469 12194 0 0 -169000.00
4 Miscellaneous towards unforseen requirements L/s 963.19 0.00 0.00 -273
Total amount of PART-A 585000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 173890.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.32 MT/ 30Mtr 80.00 0.00 29568.00 0.00 As per actuals in allotted station 985.6
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 12.32 2061.00 0.00 25391.52 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 12.320 186.00 0.00 2291.52 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 250 973.00 243250.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 779 939.00 731481.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2865 248.00 710520.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 5260 5.32 0.00 27983.20 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 0 2654.04 0.00 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 16.88 186.00 0.00 3140.05 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 16.88 2061.00 0.00 34793.80 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 16.88 MT/ 30Mtr 80.00 0.00 40516.80 0.00 As per actuals in allotted station 40512 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 973.16 57.77 -916000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 250.00 569.00 142250.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 26.00 0.00 469.00 12194.00 Good
Total amount of 'PART-C' 173890.00 -85140.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred Only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
The subject power transformer is tested on site, on 17.03.2023 for its insulation resistance values, Further By using multimeter continuity checked. R phase HV-Ground, Y phase HV-Ground & B phase HV-Ground found continuity for different taps.(IR values of HV (R+Y+B) to EARTH is 2 MOhms) Drained out the oil upto inspection chamber, no finding observed and opened the top cover of OLTC no findings obserbed. For conducting the test for Open Circuit and Short Circuit while giving 3 ph power supply to HV side the “Y” phase fuse blown out immediately & unable to process the further transformer tests. From the above results. it is suspected that, HV side of transformer winding grounded, Hence recommended for thorough inspection at repairer bay. It can not be attended at site.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: No. BGK/BDM/AEE/AE/ 2022-23/417-22 Date: 18.03.2023. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 09/24) which was failed on 17.03.2023 at 33/11KV S/S Bidari of Jamkhandi taluka, O&M Division, HESCOM., Jamkhandi.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-09/24 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2925066 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000-09/24
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Sl. No Particulars Total
1a Materials Cost (Exclusive of GST) Materials supplied by HESCOM 390000.00
1b Materials Cost (Exclusive of GST) Materials supplied by Agency 1403000.00
2a Labour charges (Exclusive of GST) Carried out by ESCOM 0.00
2b Labour charges (Exclusive of GST) Carried out by Agency 287000.00
3 Basic rate ( Sum of Sl no.1a,1b,2a & 2b 2080000.00
5 Cost of Estimate (Sum of Sl No. 3 & 4) (Amount Put To Tender) 2454400.00 2341631.00 8.47
REPORT : This is an estimate amounting to Rs. 24,54,400/- (Rupees. Twenty four Lakhs Fifty four thousands Four hundred only) has been prepared for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot
The subject power transformer is tested on site, on 01.03.2021 for its insulation resistance values, HV & LV magnetic balance test & Short circuit test and open circuit test results are satisfactory, But insulation between HV and LV may be detoriated i.e PI value is only 0.28. It can not be attended at site.Hence recommended for reconditioning of insulation may be done at repairer bay.
This estimate is prepared as per The detailed test report of this office Assistant Executive Engineer (El), BDM Sub-Division, Bagalkot vide letter No: BGKT/AEE/AE/BDM/2020-21/380-83 Dated 01.03.2021. However actual quantity/cost estimate will be submitted after the inspection of the active parts of the power transformer by inspection commitee constituted by honarable DT HESCOM, CEE Belagavi,EEE MRT, EEE PMC and EEE Nodal Officer of juridiction. All the provisions for men and materials has been made in the estimate. Hence this estimate may kindly be sanctioned and repair work may please be entrusted to any of the reputed repairer, since this division do not have sufficient skilled manpower and equipments/infrastructure facility.
CERTIFICATE : Certified that, I have personally visited the spot and prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
CERTIFICATE : Certified that, I have personally visited the spot and got prepared this estimate MWSR 2016, MWSR-2019 and Revised KPTCL SR-2023 for the most economical & safe way of execution of works.
Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM., Bagalkot.
" Counter Signed "
Executive Engineer (Ele)
MRT Division, HESCOM., Belgaum.
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C
vii. HV bushing
viii. LV bushing
ix. wiring cable for above relays
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Provisional estimate for repairing of faulty 33/11KV, 5MVA Power Transformer (Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042) which was failed on 01.03.2021 at 33/11KV S/S Haligeri of Badami taluka, O&M Division, HESCOM., Bagalkot.
Name plate details of power transformer OLTC Details #REF! #REF! #REF!
Make: Techno power Corporation Bangalore OLTC Details: #REF! #REF! #REF!
Sl No: TPC/33/11/5000-08042 Make: CTR #REF! #REF! #REF!
Capacity: 5MVA Type: E016
YOM 2008 Sl No: 2822589 #REF! #REF! #REF!
Volts at No load HV: 33KV LV: 11KV Rated Step Voltage: 412.5V
Amperes HV: 87.4 LV: 262.4 Total Weight: 720 Kg appx 1622
Vector Group DYn11 Volume of Oil: 380 ltrs(appx)
Untanking mass 9765 Kg Mass of Oil : 327 Kgs(appx)
Mass of Oil in Kg/Liters 2635Kg/ 3100 ltrs 3100
Total Mass 12400 Kg 93
PART-A: HESCOM PORTION
Sl No Particulars Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks
1 Faulty 33/11KV, 5MVA Power Transformer without oil and with all other accessories. No 1 VA VA VA VA 0.00
Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042
2 Fresh Transformer Oil: Oil released (3480= Ltrs) + 3% wastage is 104.4 Total Oil: 3585 Ltrs as per CSR--2023-24 Sl No. 120, Item No.15.01, Page No 8. Ltrs 3584 105.545 378273.28 0 0 Fesh Oil to be supplied by HESCOM and shall be collected through your own vehicle. The oil shall be filled in presence of HESCOM authorities. 3480 104.4 3584.4
3 210 Ltrs capacity empty oil barrels(Good) as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. Nos 17 469 7973 0 0 26000.00
4 Miscellaneous towards unforseen requirements L/s 3753.72 0.00 0.00 -273
Total amount of PART-A 390000.00 0.00 0.00 0.00 #REF!
PART-B: REPAIR WORKS part C 112769.00
Sl No Description of works Unit Qty Rate Material Cost Labour Charges Transit Risk Insurance Remarks Total #REF!
1 Moving the faulty power Transformer to the nearest loading point at 33/11KV MUSS Haligeri. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 9.438 MT/ 30Mtr 80.00 0.00 22651.20 0.00 As per actuals in allotted station
2 Loading of the faulty Transformer tank with active parts and accessories at 33/11KV MUSS, Haligeri as per MWSR--2019 Sl No. 40(a),Page No 98. MT 9.438 2061.00 0.00 19451.72 0.00 2431.98
3 Transit risk insurance for faulty power transformer from site to repairer's premises. L/S --- --- 0.00 0.00 4000.00 To be paid as per actuals
4 Transportation of faulty power transformer with active parts or accessories from 33/11KV MUSS Haligeri Bagalkote in appropriate transport vehicle i.e using 10 MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(2) of Pg.No-96 (Upto 250Kms: Rs.105.42 per Km, greater than 250Kms: Rs.81.99.00 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 81.99 0.00 20497.50 0.00 The actual destination & distance will be known only after allotment of subject work to the tenderer. 96.7482 14.7582 18.9756 27.594 4138.38 8199 7932.68 9674
5 Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. As per CSR-2023-24 page 140, Sl No. 2 MT 9.438 186.00 0.00 1755.47 0.00 81.99 105.425 153.3 22991 84.75294604 79.3268 81.98305085
6 Dismentling of faulty power transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core & winding, separation of HV/LV coils, conducting of preliminary tests required for assessment of repair work to be undertaken, dismentling of core etc., in the presence of HESCOM authorized representative. As per Revised MWSR 2016 Part-III, Page 157 Sl.No-3 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 12654.13559 14931.88
7 Providing new windings in place of damaged winding including cost of materials, labour, drying etc., (Both HV & LV) - per kg of winding. As per CSR--2023-24 Sl No. 3C(ii) a & b,Page No 148. Kgs 150 973.00 145950.00 0.00 0.00 Exact quantity will be known during joint servey.
8 Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight As per CSR--2023-24 Sl No. 3B(i) a & b,Page No 148. Kgs 586 939.00 550254.00 0.00 0.00 Exact quantity will be known during joint servey. 166.75 13.18 880084 8.8 4.38
9 Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. of all the 3 limbs As per CSR--2023-24 Sl No. 3C(i) a & b,Page No 148. Kgs 2194 248.00 544112.00 0.00 0.00 Aproximate qty is taken, Exact quantity will be known during joint servey. 30.015
10 Providing new CRGO lamination to the core in place of damaged lamination wherever necessary including cost of materials and labour As per CSR--2023-24 Sl No. 3A(i) a & b,Page No 148 Kgs 100 776.00 77600.00 0.00 0.00 Exact quantity will be known during joint servey.
11 Repairing & overhauling of On load tap changer/Divertor switch including change of oil, lubrication & repalcement of gaskets and other necessary parts which are locally available. As per MWSR 2016, Part III, page No. 156, Sl No.7(a) 5MVA 1 14931.88 0.00 14931.88 0.00 8mva rate availble 2862.36 12654.13559 14931.88
Spares for OLTC/Divertor switch (spares to be procured from the original manufacturers only) Exact quantity will be known during joint survey.
i. Fixed contacts No 3 3000.00 9000.00 As per approximate market rates(assuming that the tap has operated from 5-10
ii. Moving contacts Set 3 3000.00 9000.00
iii. Transition resistors Set 3 5900.00 17700.00
iv. Tie rod with nuts No 0 1200.00 0.00
12 Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of materials, including the painting of radiators at site/firm. As per MWSR 2016 Part-III, Sl.No-8 of Pg.No-156 5MVA 1 16289.08 0.00 16289.08 0.00
13 Re-assembly of core & winding. As per MWSR 2016 Part-III, Sl.No-9 of Pg.No-155 5MVA 1 14931.88 0.00 14931.88 0.00 4828.14 14040 12654.13559 14931.88
14 Drying out the assembly of core and winding in oven/vaccum chamber till the specified insulation resistance values are obtained (including cost of materials and labour). As per MWSR 2016 Part-III, Sl.No-10 of Pg.No-155 5MVA 1 19004.37 0.00 19004.37 0.00 26823 78000 16105.39831 19004.37
15 Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like gasket, insulating materials, bolts & nuts etc., and labour. Other accessories at repairer's work to facilitate the testing. As per MWSR 2016 Part-III, Sl.No-11 of Pg.No-155 5MVA 1 11198.25 0.00 11198.25 0.00 15327 18085.86
16 Filling of oil to the main tank and OLTC tank, filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum BDV value shall be 50KV. Note: The fresh transformer oil will be supplied by HESCOM. As per CSR--2023-24 Sl No. 5F,Page No 142 Ltrs 3480 5.32 0.00 18513.60 0.00
17 Replacement of faulty spares of transformer (shall be procured from the original manufacturers) Exact condition will be known during joint servey.
i. Silica gel breather (2Nos) As MWSR 2016 Part-III,Page-153,Sl.No-26 Set 1 561.69 561.69 0.00 0.00 476.01264
ii. OTI Relay As per MWSR 2016 Part-III, Page No.153, Sl No: 21 No 1 2747.76 2747.76 0.00 0.00 2328.612468
iii. BH Relay As per CSR--2023-24 Sl No. 6A,Page No 138 No 1 8743.00 8743.00 0.00 0.00 1062
iv. WTI with 4 contacts, 15 meters capillary length with built in CCU RTD and external remote indicator, range 0-150 deg C No 1 2654.04 2654.04 0.00 0.00 2249.186441
vii. HV bushing No 3 2000.00 6000.00 0.00 0.00
viii. LV bushing No 3 2000.00 6000.00 0.00 0.00
ix. wiring cable for above relays Set 1 6000.00 6000.00 0.00 0.00
x. Various types of valves (As per MWSR 2016 Part-III Sl No: 27, page No: 153 No 1 4423.38 4423.38 0.00 0.00 3748.627119 5219.5884
18 Testing the transformer for routine tests as per IS: 2026-1983. As per CSR--2023-24,Part-III Sl No. 7B, (a) & (b) Page No 143 5MVA 1 18987.00 0.00 18987.00 0.00
19 Supervising and commissioning of transformer in the presence of MRT staff as and when the transformer is ready for commissioning. As per CSR--2023-24 Sl No. 7C,Page No 144 5MVA 1 7605.00 0.00 7605.00 0.00
20 Transit risk insurance for repaired good power transformer from repairer's premises to the allotted sub-station. L/S - - - - 0.00 0.00 5000.00 To be paid as per actuals
21 Loading of repaired Transformer tank with active parts or accessories at firm's works after testing. As per CSR--2023-24 Sl No. 2,Page No 140 MT 12.40 186.00 0.00 2306.40 0.00 2431.98
22 Transportation of repaired good power transformer with active parts or accessories from repairers premises to alloted sub station in appropriate transport vehicle i.e using11-20MT Truck & Trailer. As per MWSR-2019, Part-II, Sl.No-39A(3) of Pg.No-96 (Upto 250Kms: Rs.105.42per Km, greater than 250Kms: Rs.81.99 per Km Excluding GST) Note: The rates are for up & down journey. In case if the distance travelled is less than or equal to 250Kms, the minimum distance travelled shall be considered as 250Kms only. KMs 250 105.42 0.00 26355.00 0.00 Actual destination & distance will be known only after allotment of repaired good transformer. 124.3956 96.7482 89.3390
23 Unloading of repaired good power transformer at the allotted sub-station with all its accessories. (Total mass as per name plate) As per MWSR-2019 Part-II, page No:98 Sl No. 40(b) MT 12.40 2061.00 0.00 25556.40 0.00 370.98
24 Moving the repaired good Transformer to the plinth at alloted sub-station Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained) as per CSR--2023-24 Sl No. 9, Item No.(a), Page No 116 Per MT/ Mtr 12.40 MT/ 30Mtr 80.00 0.00 29760.00 0.00 As per actuals in allotted station 2061
25 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., for the total weight of the Tr (Conservator tank, Breather, Base wheels, earthing of Trf,etc. As per CSR--2023-24 Sl No. 9B,Page No 116 MT 2.00 1134.00 0.00 2268.00 0.00
26 Miscellaneous towards unforseen requirements L/S 254.12 5.37 -473000.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
PART-C: CREDIT PORTION 496.32 772.63534
Sl No Particulars Unit Qty Rate Material Cost Remarks
1 Repaired good 5MVA power transformer of Make: Techno Power Corporation bearing Sl No: TPC/33/11/5000 08042 , YOM: 2008 (repaired by the work awarded agency) with oil and all its accessories No 1 - - VA VA Repaired good 70.38
2 Released copper wire As per CSR--2023-24 Sl No. 10A,Page No 139 Kgs - - 150.00 569.00 85350.00 Scrap 391
3 Released CRGO core laminations As per CSR--2023-24 Sl No. 10C,Page No 139 Kgs - - 100.00 133.00 13300.00 Damaged
4 Released fixed contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 2.00 569 1138.00 Scrap
5 Released moving contacts (OLTC) As per CSR--2023-24 Sl No. 10A,Page No 139 No.s/Kg 1.00 569 569.00 Scrap
6 Released transition resistors (OLTC) Set 3 NV Scrap
7 Released HV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap
8 Released LV Rod As per CSR--2023-24 Sl No. 10A,Page No 139 No's / kgs 3 3.00 569.00 1707.00 Scrap 2
9 Released BH, OTI, WTI,Silica gel breather,ie rod with nuts and various valves as per CSR--2023-24 Sl No. 10B,Page No 139. No's/kg 1 No each 25.00 41.00 1025.00 Scrap
10 210 Ltrs capacity empty oil barrels as per CSR--2023-24 Sl No. 614, Item No.69.19, Page No 33. No 17.00 0.00 469.00 7973.00 Good
Total amount of 'PART-C' 112769.00 -24019.00
Assistant Engineer (Ele) Assistant Executive Engineer (Ele)
BDM Sub-Division, HESCOM, Bagalkote BDM Sub-Division, HESCOM, Bagalkote
Executive Engineer (Ele)
MRT Division, HESCOM, Belagavi
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Abstract BGM Zone.xlsx
Others - Abstract BGM Zone • 0.42 MB
3 Nandagaon Estimate.xlsx
Others - 3 Nandagaon Estimate • 0.17 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
5 Shedbal Estimate.xlsx
Others - 5 Shedbal Estimate • 0.17 MB
2 Mangsuli Estimate.xlsx
Others - 2 Mangsuli Estimate • 0.17 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
1 Benadi Estimate.xlsx
Others - 1 Benadi Estimate • 0.17 MB
Annexures.doc
Others - Annexures • 0.15 MB
tender document 758.doc
Others - tender document 758 • 1.58 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
4 Sankonatti Estimate.xlsx
Others - 4 Sankonatti Estimate • 0.17 MB
13 FD417EXP Circular.pdf
Others - 13 FD417EXP Circular • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].