Loading…
Loading…
Tender Value
₹1.3 L
EMD Value
₹1,280
Closing Date
29 Jun 2026, 6:00 pm3d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, P. H. Works Division, Tharad
Shifting Alignment of Existing 350 mm dia. DI K-7 Pipeline from Ranpur offtake to Kumbhardi WTP Damaged due to SSNNL Work. Ta.Dharnidhar Dist: Vav-Tharad Under : M&R to BK-4 Ph-2B RWSS-2025-26
315691
05/2026-2027
Open
Civil Works - Water Works
Banaskantha
3 documents required · 3 mandatory
₹600
Executive Engineer, P. H. Works Division, Tharad
₹1,280
20 Jun 2026
20 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
Name of Work:- Shifting Alignment of Existing 350 mm dia DI K-7 Pipeline from
Ranpur offtake to Kumbhardi WTP Damaged due to SSNNL Work.
Ta.Dharnidhar Dist: Vav-Tharad
Under: M&R to BK-4 Ph-2B RWSS-2026-27
Estimated Cost : Rs.
Executive Engineer
Gujarat Water Supply & Sewerage Board
Public Health Works Division
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
Bid Documents for Design, Build & Operate Contract for
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
Name of Work- Shifting Alignment of Existing 350 mm dia DI K-7 Pipeline from Ranpur offtake
to Kumbhardi WTP Damaged due to SSNNL Work. Ta.Dharnidhar Dist: Vav-
Tharad Under: M&R to BK-4 Ph-2B RWSS-2026-27
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall
not be permitted to withdraw his bid on this account.
be free supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
in Schedule-B only will be considered for price evaluation & shall form a part of
the Contract Agreement.
and evaluation.
(7) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to
Schedule-C/5 separately for Schedule-C. The total shall be in line to the price
quoted in Schedule-C. The total shall be carried forward to Schedule-B for
comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with pro
(9) Each item is to be individually priced online and the amounts shall be added up
prices shall be left blank except where the item description requires the item
to be priced on "as applicable” basis. The item shall not be priced if it is “not
applicable” to the bidder’s design, in which case the bidder shall add the
words “NOT APPLICABLE”. The wording in the item description is for subject
matter guidance only; clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the
works covered under the bid and all liabilities and contractual obligations
whether separately specified or not. Items against which no prices are quoted
shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of
the bid document) in the prices quoted for other items.
for satisfactory working/safety of the system as specified, will not be
separately paid for by the Employer when executed and shall be deemed to be
already covered by other items and rates listed in the price sheets No extra
payment shall be given for any item which is required to complete and perform
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
fixed, during the pendency of the Contract. In case of any discrepancy noted in
carried over and arithmetic corrections if any will be considered for financial
evaluation of the bid.
(12) Schedule ‘D gives the basis of interim payment for construction of works.
(13) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates shall
also be deemed to include any works and setting out that may be required to
be carried out for laying out of all the works involved.
(14) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(16) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for testing.
(18) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
and the prices shall include all the equipments / materials / accessories and
services required as per the specifications. The bidder shall fill in the price
schedule furnished.
(20) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against labour
cess which is non refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of
the same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed
by the contractor and charges of inspection/ CSC agency without any work due
to misinformation shall be recovered from the contractor.
(24) The rates to be quoted by the Contractor must be exclusive of GST but inclusive of
all other taxes. GST should be paid extra on the admissible payment as per the
approved tender rates and condition of price variation; GST should be paid as per
prevailing rates at the time of payment. The TDS as per provision of IT rules and
(25) The rates to be quoted by the Contractor must be exclusive of GST but inclusive of
all other taxes as per Volume-I (B) General Condition of Contract, Clouse No.
(26) The rates quoted shall be inclusive of all taxes, duties and GST, which shall not
be paid extra. The TDS shall be deducted at source as per provision of IT rules
and GWSSB policy.
(27) The Bidders shall have to quote the rates in this tender keeping in view of the
GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
(28) The process requires that the bidder shall quote his price for the work
shall remain firm and fix during the entire period of performance of the
contract except price variation allowed for supply of MS pipe as per Volume-IB
Clause No. 59, General Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those particular
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No.
GEN-2010-595- (6)- M.I. Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time
to time and remaining amount if any shall be recovered from the final bill
before releasing the security deposit of the work. The contractor shall furnish
the statement showing the quantity of quarried materials / minerals from
whom purchased (with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty
payment to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along with
the evidence within time limit. In case of non compliance entire responsibility
shall be rest with the agency and required amount shall be recovered from any
due amount of the agency.
(32) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(33) Payment should be made after fund released by GWSSB.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: Shifting Alignment of Existing 350 mm dia DI K-7 Pipeline from Ranpur offtake to
Kumbhardi WTP Damaged due to SSNNL Work. Ta.Dharnidhar Dist: Vav-Tharad Under:
M&R to BK-4 Ph-2B RWSS-2026-27
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined in
more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda/Amendments to the above, for the execution of the above Contract, we the
undersigned offer to design, Engineer, procure, construct, complete, commission, operate and
maintain the whole of the said works for 5 years from the date of commissioning including
defects liability period as given in Conditions of Contract and in conformity with the drawings,
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed price of
Construction including free trial run for three months or such other sum as may be ascertained
in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspection and
testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any action
including termination of Contract and impose at his absolute discretion any penalties, and/or
reject the work.
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract within 15 (Fifteen) Days, inclusive of monsoons, from the date or receipt of
Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 90 days from the Last date of submission of the
bill and it shall remain binding upon us and may be accepted at any time before the expiry of
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract there to annex but until such agreement is
prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of value
specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in Appendix to
Bid and agree that they represent a fair estimate of the damages likely to be suffered by you in
the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
Name of Work : Shifting Alignment of Existing 350 mm dia DI K-7 Pipeline from Ranpur offtake
to Kumbhardi WTP Damaged due to SSNNL Work. Ta.Dharnidhar Dist: Vav-
Tharad Under: M&R to BK-4 Ph-2B RWSS-2026-27
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined in more
details in various sections of this bid document.
Schedule showing the approximately quantity of materials to be supplied to the contractor and at the
government store for the or to be executed by contractor and rate which way are to be charge.
Sr. material to Departmental Place of
Particular Quantity
No. be charge to Issue Rate Delivery
1 DI K-7 350 mm dia 150 Mtr 0 3858 dn. Store
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by the Engineer
in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own cost for
loading, unloading, and transporting safety to the site of work the cement stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in position shall be
provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available with the dept. will
be issued on request to the contractor. (for use in this contract only) at prevailing market rates or
departmental issue rates whichever is higher.
5. All the surplus materials supplied by the dept. As mentioned in schedule-A should be handed over to
the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness and soundness by
the contractor before taking the delivery of the materials from the Government.
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule are filled up by
the Executive Engineer, on the issue of form prior to the submission of the Tender.
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition, otherwise recovery at
the double rates will be affected in view of Clause 12.4.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
Name of Work:- “Shifting Alignment of Existing 350 mm dia DI K-7 Pipeline from Ranpur offtake
to Kumbhardi WTP Damaged due to SSNNL Work. Ta.Dharnidhar Dist: Vav-Tharad Under: M&R
to BK-4 Ph-2B RWSS-2026-27.”
SCHEDULE – ‘B’ (SCHEDULE OF PRICES)
Qty Unit Description of Item Rate Per Amount
Manufacture, Supply & Delivery of Ductile
Iron Flange socket spigot bends, tees,
reducers or any other specials as per BS-
EN-545/1995 Class-A series K12 suitable
for use with D.I.Pipes manufactured as per
IS:8329/1994delivery of specials is to be
made to GWSSB store or site of works any
where in Gujarat including all taxes,
liading, unloading, carting, stacking,
insurance, inspection charges, octroi etc.
complete. with external bitumen & zinc
coating & internal cement mortar lining
100.00 Kg. 350 & above Dia 151.00 Kg.
Excavation for pipe line trenches incl. all
safety provision using site rails and
stacking excavated stuff up to a lead of
mts. Cleaning the site etc. complete for lifts
and strata as specified including
Upto 1.50 m Depth
365.71 Cum. In all sorts of soil and soft murrum 91.23 Cum.
0.76 Cum. In hard rock / c.c 1:2:4 381.30 Cum.
1.50 m to 3.00 m Depth
25.00 Cum. In all sorts of soil and soft murrum 100.45 Cum.
Lowering, laying/resing and jointing C.I
S&S Spun pipes suitable for Tyton joints /
Mortar lined DI pipes of various Classes
with CI /MS specials of following diameters
in proper position, grade and alignment
as directed by Engineer-in-charge
including hydraulic testing etc. complete.
150.00 RMT. DI K-7 350mm Dia. 192.70 RMT.
Refilling of pipeline trenches incl. ramming,
watering, consolidating disposal of surplus
stuff as directed within a radius of 3 km.
1) Refilling As Directed.
388.59 Cum With awailable soil 22.55 Cum
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
Making job connection for old pipes in
connecting the pipeline with existing main
& inserted of specials incl. cost of
excavation, cutting of pipes, dewatering,
testing etc. complete incl. all jointing
materials etc. complete. (excluding cost of
specials pipe & fitting) Job work.
2.00 Job 350 & above Dia 2000.00 Job
Providing and laying cement concrete
1:2:4 (1- Cement : 2 Coarse sand : 4-
graded stone aggregates 20 mm nominal
size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
0.76 Cum For Canal Lining 3602.76 Cum
Transportation of pipe loading & unloading
with a crane, Dhanera sub. Dn Store to
2.00 trip For 350 mm DI Pipe 10557.00 trip
Removing of existing pipeline incl removal of
specials, valves jointing material including
Carting and stacking of removed material from
site of work to the department store as excl.
excavation and Reffiling
120.00 RMT. For Ex. Di K7 350 mm 88.15 RMT.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
1. As mentioned in the conditions of Contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable only for the
assessment of value of the work done for inclusion in any interim certificate for part payment to the
2. The Schedule specifies the procedure for all such assessment of the items specified in Schedule B.
3. Each item of Schedule-B has been divided into broad components. The Employer's Representative shall
assess the value of each component as indicated in paragraph 6 herein below.
4. Percentages are indicated against each component of each items specified in Schedule B, based on the
Employer's best appreciation of the value of the component as related to the total costs of the concerned
item as whole. A head titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he considers necessary but
cannot be covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the tenderer's
scheme and design and he should take this into account while quoting his lump sum prices for the items
specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the Employer's
Representative an initial bill of quantities to all major items, to be reviewed and updated periodically
with the Employer's Representative. This bill of quantities will be used for assessment of percentage
progress of the component at any stage. By measurement jointly taken by the Employer's Representative
and the Contractor, mutually agreed and entered in the measurement books in the form and by the
method approved by the Employer's Representative, and signed jointly by both the parties.
Signature of contractor
Executive Engineer
P. H. Works Dn., G.W.S.S.B
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL & ELECTRICALWORKS)
Percentage Payment to
Item Description of Items
a. On receipt of materials at project site 65 % of Quoted rate
b. Excavation, Lowering, laying and jointing 20 % of Quoted rate
c. Non-Destructive test and Destructive test of field joints
5 % of Quoted rate
etc. (RT/UT/PIUT)
d. On hydraulic testing and refilling and disposal surplus
5 % of Quoted rate
e. After commissioning 5 % of Quoted rate
a. On receipt of materials on site 70 % of Quoted rate
b. On erection 20 % of Quoted rate
c. On Hydraulic testing 5 % of Quoted rate
d. After commissioning 5 % of Quoted rate
3 PUMPING STATION / STAFF QUARTERS /
a. On approval of Designs 2.0 % of Quoted rate
b. On completion of Excavation & base slab 18.0 % of Quoted rate
c. On completion of vertical wall up to plinth (incl.
20.0 % of Quoted rate
Screen chamber)
d. Full supporting structure incl. ring beam and top slab 15.0 % of Quoted rate
e. On completion of pump house incl. fixing doors
10.0 % of Quoted rate
f. Plastering inside & outside with epoxy paint etc
10.0 % of Quoted rate
(completed with all respects)
g. Painting of letters, MS ladder pipe, railing and all
miscellaneous items such as snowcem paints in three 15 % of Quoted rate
coats etc. (completed with all respects)
h. After Completion 10 % of Quoted rate
4 Clear Water Sump
a. On approval of designs 2 % of Quoted rate
b. On completion of excavation and base slab 18 % of Quoted rate
c. On completion of vertical wall and braces 20 % of Quoted rate
d. Full supporting structure including column, ring beam
15 % of Quoted rate
and completion of top slab / dome
e. Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
f. Procurement and fixing of inlet, outlet, washout,
overflow pipes, valves, specials, chambers, lighting 10 % of Quoted rate
arrester conductor and specials at site
g. Water level indictor, painting of letters, M.S ladder,
pipes, railing and all miscellaneous items such as
15 % of Quoted rate
snowcem paint in three coats etc (Completed with all
respect) including water tightness test
h. On hydraulic testing 10 % of Quoted rate
5 Elevated Storage Reservoir
a On submission of Designs 2.5% of Quoted rate
b On approval of Designs 2.5% of Quoted rate
c On Completion of excavation 7.5% of Quoted rate
d On completion of staging height up to container 22.5% of Quoted rate
e On Completion of Floor container 22.5% of Quoted rate
f On Completion of walls of container 22.5% of Quoted rate
g On Completion of Roof of container with all related
20.0% of Quoted rate
piping and other works including hydro testing
6 All Electro-mechanical works and Instrumentation
1 On supply of material at work site in good condition 65% of Quoted rate
2 On erection of Equipment 20% of Quoted rate
3 After Sucessesful Testing & Commissioning of 10% of Quoted rate
Equipment(On Completion of Stipulated Trial Run)
7 Valve chambers
a. On completion works as per approved drawings 95% of Quoted rate
b. After commission of system 5% of Quoted rate
8 Operation and Maintenance
Every month in equal instalment based on Estimated For monthly Payment 1/12 th of
prices of O & M will be paid as per the Schedule of annual O & M price for the year
Terms and Condition of the the
For quarterly payment ¼ th of
annual O&M prices for the year
terms and Condition of the
9 Miscellaneous work
Volume-III, PRICE BID M&R to BK-4 Ph 2B RWSS
a. All other items such as encasing, columns support for 80% of quoted rate on
culvert, pipe bridges for Canal /Drain/ Khadi crossing, completion of works
internal roads, railway/highway crossing,
Anchor/thrust blocks, steel bridge for pipe crossing,
b. On commissioning of the system 20% of quoted rate
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Ann 4.pdf
Ann 5 Purchase Policy.pdf
Ann 6B shramyogi GR.pdf
Any 6A Labour Circular.pdf
Circular 26 SIGN BOARD.pdf
GR LD Deduction 10012018.pdf
GST GR.pdf
Mecilianius min.pdf
Min wages Circular.pdf
Royelty 18.06.19 New rate.pdf
Vigilace Unitmin.pdf
DMO_2941_01-Apr-2026_744.pdf
00_TITLE_Pg_0.pdf
02_VOL 1 B GCC 107_201.pdf
03_VOL 2B_1 Tech Spec Civil 202_318.pdf
04_Itemwise specification Specification 319_328.pdf
05_VOL 2B_1D_Vendor list 329.pdf
06_VOL 3 Price bid standard_pg 331_344.pdf
07_Special Note 345.pdf
01_VOL 1 A Technical Bid 1_106.pdf
Download all tender documents and submit your bid