Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹7,951
Closing Date
31 Aug 2021, 4:30 pmClosed
Dean
College Of Fisheries, Lembucherra, West Tripura
Construction of Brood Stock Rearing facility tank under COE-Phase-II project
2021_CAU_642443_1
CAU-CF/6/2/COE-WORK(1)/1043 Dt.06/08/2021
Open Tender
Civil Works
Works
77 days
College Of Fisheries, Lembucherra
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,951
28 Sept 2021
9 Aug 2021
2 Sept 2021
9 Aug 2021
31 Aug 2021
9 Aug 2021
Earth work in excavation by mechanical means( Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. All kind of soil.
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work uoto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 3 graded stone aggregate 20 mm nominal size).
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level. Mild steel and Medium\Tensile steel bars.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size).
Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank.
First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12 mm cement plaster of mix: In cement mortar 1 : 3 ( 1 cement : 3 fine sand )
Neat cement punning.
Providing structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required.
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. al work - Exposed on wall. 40 mm dia. nominal bore
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability forhot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge. External work- 40 mm dia. nominal outer dia.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge. External work- 50 mm dia. nominal outer dia
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end): (a) 40 mm nominal bore
KESHAB SAHA
SABYA SACHI SAHA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .