Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
29 Aug 2026, 5:00 pmDue tomorrow
District Engineer, Zila Parishad, Dhanbad
District Engineer, Zila Parishad, Dhanbad
(2) Construction of a bathing ghat at Bauri Dhaura under Mandra Panchayat.
2026_ZPDH_117802_6
25/2026-27/DE/ZPDH/DHANBAD
Open Tender
Civil Works
Percentage
90 days
Baghmara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,250
₹13,000
Yes
24 Aug 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
29 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in hard soil-do-do-E/l. | 3.57 | M3 | 167.33 | ₹597.37 |
| 2 | Providing coarse clean sand filling in foundation Trenches sub-base & filling do - do- all compelet job as per technical specification and direction of E/I. | 0.25 | M3 | 589.51 | ₹147.38 |
| 3 | Providing desination 75 B in B/F/S –do-do- all Complete job as per technical specification & direction of E/I. | 12.64 | M2 | 330.34 | ₹4,175.5 |
| 4 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in foundation Do-do-all complete job as per technical specification and direction of E/I . | 0.96 | M3 | 5,218 | ₹5,009.28 |
| 5 | Providing and Laying P.C.C ,M150- (1:2:4) With Nominal mix of concrete Do-do-all complete job as per technical specification and direction of E/I . | 0.25 | M3 | 4,598.23 | ₹1,149.56 |
| 6 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Tie Beam Do-do-all complete job as per technical specification and direction of E/I . | 0.85 | M3 | 5,218 | ₹4,435.3 |
| 7 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Roof Beam Do-do-all complete job as per technical specification and direction of E/I . | 1.02 | M3 | 6,308.87 | ₹6,435.05 |
| 8 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Column Do-do-all complete job as per technical specification and direction of E/I . | 1.41 | M3 | 6,082.45 | ₹8,600.58 |
| 9 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Roof Slab Do-do-all complete job as per technical specification and direction of E/I . | 2.86 | M3 | 6,308.87 | ₹18,011.82 |
| 10 | Providing C.P (1:3) 12 mm thick with in with 5% cico over roof slab – Do - do - all complete job as per technical specification and direction of E/I. | 11.24 | M2 | 189.13 | ₹2,125.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.23 MB
BOQ_159242.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].