| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC ELITE CORNER P S ENGLISH BAZAR DIST MALDA PIN 732101 W B | MALDA | MALDA | WEST BENGAL | 732101 | L1 | Accepted-AOC l1 | |
| 2 | L2₹5.7 L+₹22,683.60 (4.13%)Rejected-AOC | L2 | Rejected-AOC l2 | |
| 3 | L3₹5.8 L+₹28,852.64 (5.25%)Rejected-AOC | L3 | Rejected-AOC l3 | |
| 4 | L4₹6.6 L+₹1.1 L (19.5%)Rejected-AOC | L4 | Rejected-AOC l4 | |
| 5 | L5₹7.0 L+₹1.5 L (26.7%)Rejected-AOC JITPUR NADIA TEHATTA 1 NADIA | NADIA | WEST BENGAL | L5 | Rejected-AOC l5 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
10 Mar 2025, 2:00 pmClosed
Registrar
Pundibari Cooch Behar
Construction of Vermi compost Unit and IRC fencing 20mtr and Repair Renovation work of Vermi Compost Unit of Dakshin Dinajpur Krishi Vigyan Kendra Majhian campus under Uttar Banga Krishi Viswavidyalaya Pundibari Cooch Behar
2025_UBKV_819757_4
NIeT-14 of 2024-25
Open Tender
CIVIL WORKS
Item Rate
60 days
KVK Dakshin Dinajpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹14,000
Yes
8 May 2025
25 Feb 2025
12 Mar 2025
25 Feb 2025
10 Mar 2025
25 Feb 2025
Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed..
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, (f) 25 mm to 30 mm shuttering without staging in foundation
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite lon, complete as per drawing and direction.(a) For works in foundation, basement and upto roof of ground floor/upto 4 m JSW/JSPL/SHYAM/SRMB/BMASL/ ELECROSTEEL/ SSL
Labour for Chipping of concrete surface before taking up Plastering work.
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (i) With 1:6 cement mortar. (c) 15 mm thick plaster
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:6 cement mortar (b) 20 mm thick plaster
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (ii) 25 mm. thick
Neat cement punning about 1.5mm thick in all,dado, window sill,floor etc NOTE:Cement 0.152 cu.m per100 sq.m.
M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete i) For roof truss works a) Span up to 12 Mtr
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforminnd hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.I) For structural members of specified sections weighing less than 22.5 Kg./m
Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed.
Fitting and fixing old pieces of asbestos, G.C.I. or C.I. sheets or plain sheets including closing old holes with washers and sheet-bolts and nuts, etc. and including fixing the same to supporting frame with necessary hook-bolts, washers, putty etc. (excluding cost of sheets). (Payment to be made on area of finished work.) (ii) With all new fittings including the cost thereof. (a) In roof
Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised "C" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. (III) 75 mm. x 75 mm. x 8 g.
Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor)b) With 0.63 mm thick sheet
Supplying fitting and fixing I.R.C. fabric mesh with covering battens including cost of screws etc complete (excluding the cost of battens). In ground floor. (j) 25mm x 25mm x 2.2mm x 2.2mm.
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
Cement washing including cleaning and smoothening surface thoroughly (cement to be used @15 kg./100 sq.m. of surface for one coat and @25 kg./100 sq.m of surface for two coats):External surface (Ground floor)(b) Two coats (on new works only).
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per anufacturer's specification.In Ground floor:(iii) Two coats.
a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface : With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. 20 mm
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .