Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹4,640
Closing Date
21 Jul 2026, 4:00 pm
Wildlife Warden Chenab Division,Kishtwar
Kishtwar
Upgradation of Ganyan Hut Kiyar Nallah by way of chain Link fencing 200 rft under Head Mitigation Plan of Kishtwar High Altitude National Park during 2026 27
2026_FD_314707_1
NIT 15 OF 2026-27 Upgradation Ganyan Hut Kiyar
Open Tender
Civil Works
90 days
Kiyar, Dachhan.
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Chenab Division,Kishtwar
₹4,640
6 Jul 2026
6 Jul 2026
22 Jul 2026
6 Jul 2026
21 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 11.7 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) including all lift carriages Complete job | 1.95 | Cum | - | - |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah including all lift carriages Complete job | 7.8 | Cum | - | - |
| 4 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like:1 Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah including all lift carriages Complete job | 23.35 | Cum | - | - |
| 5 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors,balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering ,all work upto floor V level including all lift carriages Complete job | 3.5 | Cum | - | - |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | 3.45 | Qtl | - | - |
| 7 | Centring and shuttering including strutting, propping, etc.and removal of form for suspended floors, roofs, landings, balco-nies and access platform with water proof ply 12mm thick | 27.9 | Sqm | - | - |
| 8 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)including all lift carriages Complete job | 79 | Sqm | - | - |
| 9 | Provision for Plantation of Climbers over the Den as per desired by site inchrge | 5 | LS | - | - |
| 10 | Carriage of materials from source to site of work by M.T.Sand av. Distance HL 1500 Mtr | 16.45 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1019644.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid