Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LQualified Make: DUKE SAVE ENERGY PUMPS & PIPES
Model: DSP8MF60M-8 SURVEY NO 449 DEESA HIGHWAY NEAR JIO PETROL PUMP CHADOTAR PALANPUR BANASKANTHA GUJARAT 385001 UDYAM GJ 04 0009757 | BANAS KANTHA | GUJARAT | 385001 | Make: DUKE SAVE ENERGY PUMPS & PIPES
Model: DSP8MF60M-8 | ₹3.0 L | L1 | Qualified |
| 2 | L2₹3.0 LQualified Make: DUKE SAVE ENERGY PUMPS & PIPES
Model: DSP8MF60M-8 | Make: DUKE SAVE ENERGY PUMPS & PIPES
Model: DSP8MF60M-8 | ₹3.0 L | L2 | Qualified |
| 3 | L3₹3 LQualified Make: DUKE SAVE ENERGY PUMPS & PIPES
Model: DSP8MF60M-8 498 SADAR BAZAR JHANSI UTTAR PRADESH 284001 UDYAM UP 43 0003783 09AEJPJ6059H2Z5 B R MII STATUS AS VERIFIED | JHANSI | UTTAR PRADESH | 284001 | Make: DUKE SAVE ENERGY PUMPS & PIPES
Model: DSP8MF60M-8 | ₹3 L | L3 | Qualified |
Tender Value
₹3.0 L
EMD Value
Exempted
Closing Date
23 Sept 2025, 1:00 pmClosed
Submersible Pump Set (Three Phase) (V2) as per IS 8034:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6671674 Dated : 13-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8337821
GEM/2025/B/6671674
Two Packet Bid
Submersible Pump Set (Three Phase) (V2) as per IS 8034:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
15 days
Meeruben Dasharathpuri384225DHINOJ GRAM PANCHAYAT TA-CHANASMA DIST-PATAN
Total value wise evaluation
PRODUCT
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| DUKE SAVE ENERGY PUMPS & PIPES Three | DUKE SAVE ENERGY PUMPS & PIPES / DSP8MF60M-8 | HSN not specified by seller | 1 pieces | 299,600 | 299,600 |
1 document required · 1 mandatory
Exempted
28 Jan 2026
13 Sept 2025
23 Sept 2025
DUKE SAVE ENERGY PUMPS & PIPES Three | Brand:DUKE SAVE ENERGY PUMPS & PIPES | Model:DSP8MF60M-8 | HSN:HSN not specified by seller | Qty:1 pieces | UnitPrice:299,600 | Amount:299,600
contract_GEMC-511687763249174.pdf
GEM_CONTRACT • 0.06 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8337821.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid