This NIT is towards Painting Works for 6 Terminals under South Central Zone: Rajahmundry,
21000158-HD-11770
21000158-HD-11770
Open Tender
East Godavari, Andhra Pradesh
₹0
Exempted
26 Oct 2021
6 Oct 2021
26 Oct 2021
26 Oct 2021
6 Oct 2021 - 15 Oct 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Epoxy coat for tank roofs | Epoxy coat for tank roofs — AS PER SCOPE OF JOB ATTACHED. | - | Square Meters |
| 2 | Tank Painting Final Coat- 2nos | Tank Painting Final Coat- 2nos — AS PER SCOPE OF JOB ATTACHED. | - | Square Meters |
| 3 | Tank Painting Final Coat- 1 no | Tank Painting Final Coat- 1 no — AS PER SCOPE OF JOB ATTACHED. | - | Square Meters |
| 4 | Tank details lettering (1D) | Tank details lettering (1D) — LETTERING: SUPPLY AND PAINTING THE FOLLOWING ON THE SECOND SHELL OF THE TANKS IN BLACK ENAMEL PAINT.1.DIMENSIONS:- A) TANK NUMBER :230 MM HEIGHT,B) NAME OF PRODUCT :150 MM HEIGHT,C) TANK CAPACITY :80 MM HEIGHT,D) SIZE OF TANK:80 MM HEIGHT,E) SAFE FILLING HEIGHT,:80 MM HEIGHT,F) DATE PAINTED:80 MM HEIGHT,G) DATE COMMISSIONED.:80 MM HEIGHT,H) DATE OF CALIBRATION:80 MM HEIGHT,I) DATE OF HYDRO TESTING:80 MM HEIGHT,J) DUE DATE OF CLEANING:80 MM HEIGHT,2.IF ANY ADDITIONAL DETAILS ARE REQUIRED TO BE PAINTED, THE SAME SHALL BE PAINTED AT NO EXTRA COST. | - | Each |
| 5 | PIPELINE PAINTING - PRIMER | PIPELINE PAINTING - PRIMER — JOB INCLUDES PAINTING OF PIPELINES AS PER DETAILS MENTIONED IN TECHNICAL SPECIFICATIONS. JOB INCLUDES SUPPLY OF ALL TOOLS, TACKLES, CONSUMABLES, MANPOWER, SUPERVISION, PPE, CONSTRUCTION SAFETY, ALL AS PER DIRECTION OF HPCL. TECHNICAL SPECIFICATIONS: PAINTING OF FIRE HYDRANT AND FOAM LINE INVOLVES: (A) SURFACE PREPARATION SHOULD BE ONLY MANUAL CLEANING. RUST, MILL SCALE, SPATTERS, OLD COATINGS AND OTHER FOREIGN MATTER SHALL BE REMOVED BY SCRAPPING TOOLS, EMERY PAPER CLEANING, WIRE BRUSHING OR COMBINATION OF THE ABOVE METHODS. ON COMPLETION OF CLEANING, LOOSE MATERIAL SHALL BE REMOVED FROM THE SURFACE BY CLEAN RAGS AND THE SURFACE SHALL BE BRUSHED, SWEPT, DEDUCTED TO REMOVE ALL LOOSE MATTER. THE SURFACE OF THE PIPELINE SHALL BE CLEANED THOROUGHLY AND BARING THE PREVIOUS PAINT. THE EXPOSED PORTION SHALL NOT BE EXPOSED TO ATMOSPHERE FOR MORE THAN TWO HOURS. PLEASE NOTE THAT ALL THE FEASIBLE OLD PAINT HAS TO BE REMOVED BEFORE APPLYING THE PRIMER, NO ADDITIONAL COST WILL BE PAID FOR SURFACE CLEANING. PRIMER WILL BE ALLOWED ONLY AFTER PROPER SURFACE CLEANING AND APPROVAL FROM OFFICER, CONTRACTOR TO ENSURE THAT ALL THE NEARBY EQUIPMENT ARE COVERED TO PROTECT IT FROM PAINTS MARK, (B) SUPPLY, APPLICATION OF PRIMER COAT, SUPPLY AND APPLICATION: ONE COAT OF 75 MICRON ZINC PHOSPHATE AS PRIMER AND 100 MICRON EPOXY-HIGH BUILD MIO AS INTERMEDIATE OF APPROVED MAKE. RATE TO INCLUDE WASTAGE, MIXING THE PAINT PROPERLY AS PER MANUFACTURER'S SPECIFICATIONS, APPLYING WITH BRUSH/CONVENTIONAL/AIRLESS SPRAY GUN TILL 100 MICRON DFT OF PAINT THICKNESS IS OBTAINED, TESTING FOR THICKNESS, ETC. THE COAT OF THE PRIMER AND INTERMEDIATE SHALL BE SMOOTH AND EVEN, NOT SHOWING ANY TRACE OF BRUSH MARKS, THE COATED SURFACE SHALL BE OF UNIFORM SHINING SURFACE, EVEN AFTER THE ONE COAT IF THE SURFACE SMOOTHNESS OF THE PRIMER COATED IS NOT ACHIEVED THE CONTRACTOR SHALL PAINT THE PRIMER TILL THE SMOOTH SURFACE IS ACHIEVED AT NO EXTRA COST, (C) PAINT SUPPLY AND PAINTING: WITH FIRST QUALITY ACRYLIC POLYURETHANE PAINT OF APPROVED MAKE IN NOT LESS THAN TWO COATS OF 40 MICRONS EACH RATE TO INCLUDE WASTAGE, MIXING AS PER MANUFACTURERS SPECIFICATIONS, APPLYING IN TWO OR MORE COATS TO ACHIEVE 80 MICRON DFT (40 MICRON IN EACH COAT), USING CONVENTIONAL SPRAY GUN TILL THE REQUIRED DFT OF PAINT THICKNESS IS OBTAINED, TESTING FOR THICKNESS ETC. COLOUR SCHEME: AS ADVISED BY ENGINEER-IN- CHARGE. | - | Square Meters |
| 6 | PIPELINE PAINTING - FINISH | PIPELINE PAINTING - FINISH — JOB INCLUDES PAINTING OF PIPELINES AS PER DETAILS MENTIONED IN TECHNICAL SPECIFICATIONS. JOB INCLUDES SUPPLY OF ALL TOOLS, TACKLES, CONSUMABLES, MANPOWER, SUPERVISION, PPE, CONSTRUCTION SAFETY, ALL AS PER DIRECTION OF HPCL. TECHNICAL SPECIFICATIONS: PAINTING OF FIRE HYDRANT AND FOAM LINE INVOLVES: (A) SURFACE PREPARATION SHOULD BE ONLY MANUAL CLEANING. RUST, MILL SCALE, SPATTERS, OLD COATINGS AND OTHER FOREIGN MATTER SHALL BE REMOVED BY SCRAPPING TOOLS, EMERY PAPER CLEANING, WIRE BRUSHING OR COMBINATION OF THE ABOVE METHODS. ON COMPLETION OF CLEANING, LOOSE MATERIAL SHALL BE REMOVED FROM THE SURFACE BY CLEAN RAGS AND THE SURFACE SHALL BE BRUSHED, SWEPT, DEDUCTED TO REMOVE ALL LOOSE MATTER. THE SURFACE OF THE PIPELINE SHALL BE CLEANED THOROUGHLY AND BARING THE PREVIOUS PAINT. THE EXPOSED PORTION SHALL NOT BE EXPOSED TO ATMOSPHERE FOR MORE THAN TWO HOURS. PLEASE NOTE THAT ALL THE FEASIBLE OLD PAINT HAS TO BE REMOVED BEFORE APPLYING THE PRIMER, NO ADDITIONAL COST WILL BE PAID FOR SURFACE CLEANING. PRIMER WILL BE ALLOWED ONLY AFTER PROPER SURFACE CLEANING AND APPROVAL FROM OFFICER, CONTRACTOR TO ENSURE THAT ALL THE NEARBY EQUIPMENT ARE COVERED TO PROTECT IT FROM PAINTS MARK, (B) SUPPLY, APPLICATION OF PRIMER COAT, SUPPLY AND APPLICATION: ONE COAT OF 75 MICRON ZINC PHOSPHATE AS PRIMER AND 100 MICRON EPOXY-HIGH BUILD MIO AS INTERMEDIATE OF APPROVED MAKE. RATE TO INCLUDE WASTAGE, MIXING THE PAINT PROPERLY AS PER MANUFACTURER'S SPECIFICATIONS, APPLYING WITH BRUSH/CONVENTIONAL/AIRLESS SPRAY GUN TILL 100 MICRON DFT OF PAINT THICKNESS IS OBTAINED, TESTING FOR THICKNESS, ETC. THE COAT OF THE PRIMER AND INTERMEDIATE SHALL BE SMOOTH AND EVEN, NOT SHOWING ANY TRACE OF BRUSH MARKS, THE COATED SURFACE SHALL BE OF UNIFORM SHINING SURFACE, EVEN AFTER THE ONE COAT IF THE SURFACE SMOOTHNESS OF THE PRIMER COATED IS NOT ACHIEVED THE CONTRACTOR SHALL PAINT THE PRIMER TILL THE SMOOTH SURFACE IS ACHIEVED AT NO EXTRA COST, (C) PAINT SUPPLY AND PAINTING: WITH FIRST QUALITY ACRYLIC POLYURETHANE PAINT OF APPROVED MAKE IN NOT LESS THAN TWO COATS OF 40 MICRONS EACH RATE TO INCLUDE WASTAGE, MIXING AS PER MANUFACTURERS SPECIFICATIONS, APPLYING IN TWO OR MORE COATS TO ACHIEVE 80 MICRON DFT (40 MICRON IN EACH COAT), USING CONVENTIONAL SPRAY GUN TILL THE REQUIRED DFT OF PAINT THICKNESS IS OBTAINED, TESTING FOR THICKNESS ETC. COLOUR SCHEME: AS ADVISED BY ENGINEER-IN- CHARGE. | - | Square Meters |
| 7 | SPLY AND PAINTG OF LOGO | SPLY AND PAINTG OF LOGO — SUPPLY AND PAINTING THE LOGO SIGN OF THE 2.4 X 3.0 M SIZE FOR THE ABOVE GROUND TANKS ON THE TOP OR PENULTIMATE SHELL OR AS DIRECTED BY ENGINEERING-CHARGE. RATE TO INCLUDE FOR SUPPLY OF REQUIRED SHADE OF ENAMEL PAINTS OF HPCL APPROVED MANUFACTURER, SUPPLY AND ERECTION OF PIPE SCAFFOLDING AND PAINTING THE LOGO AS PER STANDARD DRAWING COMPLETE. LOGO SHOULD BE PAINTED AS PER REQUIRED COLOUR CODE. | - | Each |
| 8 | ERECTION OF STEEL | ERECTION OF STEEL — STEEL SCAFFOLDING: SCAFFOLDING WITH MS PIPES WHICH WILL BE RIGID TO WORK SAFELY AT HEIGHTS. TYPE SHALL BE OF DOUBLE TYPE. SCAFFOLDING HAS TO BE IN STEEL, ARRANGED BY THE CONTRACTOR AT HIS OWN COST FOR CARRYING OUT ENTIRE JOBS AT ALL HEIGHT AND PROVIDES ALL FACILITIES FOR PROPER INSPECTION OF SURFACE AT VARIOUS STAGES. MATERIAL HAS TO BE ERECTED AS PER SAFE METHODS. ROPES AND GUY WIRES SHALL NOT BE USED FOR TYING ETC. THE SCAFFOLDING PIPES. THE SCAFFOLDING SHALL BE OF STEEL AND SHALL NOT ENDANGER THE WORKER. SCAFFOLDING SHALL BE SUFFICIENTLY AWAY FROM THE TANK SHELL SO AS TO ENABLE THE WORKER TO WORK WITH EASE. THE SCAFFOLDING SHALL BE REMOVED BY THE CONTRACTOR PROMPTLY AFTER COMPLETION OF THE WORK. CONTRACTOR HAS TO RECTIFY THE DAMAGES MADE IN THE TANK BOTTOM AREA DUE TO ERECTION OF MS SCAFFOLDING AT FREE OF COST AFTER COMPLETION OF JOB SCAFFOLD ERECTION. A SCAFFOLD SHOULD BE DESIGNED, ERECTED, ALTERED AND DISMANTLED BY COMPETENT PEOPLE, WITH ALL SCAFFOLDING WORK UNDER THE SUPERVISION OF A COMPETENT PERSON. SCAFFOLDERS SHOULD ALWAYS ADOPT A SAFE SYSTEM OF WORK DURING THE ERECTION, ALTERING AND DISMANTLING OF SCAFFOLDS. THIS WILL USUALLY INCLUDE THE USE OF FALL ARREST EQUIPMENT. ALL SCAFFOLDS REQUIRE BRACING TO HELP PREVENT THEM FROM COLLAPSING. THE PLATFORM OF A GENERAL PURPOSE SCAFFOLD SHOULD BE AT LEAST FOUR BOARDS WIDE. ALL SCAFFOLDS, INCLUDING 'INDEPENDENT' SCAFFOLDS, SHOULD BE SECURELY TIED, OR OTHERWISE SUPPORTED. | - | Square Meters |
| 9 | SURFACE PREPARATION | SURFACE PREPARATION — SURFACE PREPARATION:HAND TOOL CLEANING USING WIRE BRUSH ETC. CONFORMING TO SSPC-SP-2 OR ST2 STANDARDSCOPE OF WORK:1.VENDOR HAS TO CARRY OUT THE SURFACE PREPARATION AS PER THE STANDARD GIVEN IN INSULATION SPECIFICATIONS.2.THE SURFACE HAS TO BE CAREFULLY PREPARED BEFORE APPLICATION OF THE PAINT/INSULATION. TOTALLY REMOVE ANY LOOSE OR DAMAGED COATING (I.E. COAL TAR ENAMEL, BITUMEN OR ANY OTHER PAINT,ETC.),RUST,MOISTURE,GREASE AND ANY OTHER FOREIGN MATTER. TO REMOVE OIL,GREASE,ETC. AN ORGANIC SOLVENT MAY BE USED LIKE PETROLEUM SPIRIT OR ETHANOL. AS PER ATTACHED SPECIFICATION WHEREVER REQUIRED SURFACE SHOULD BE CLEANED TO STANDARD ST-2 HAND TOOL CLEANING.3.ALL TOOLS AND TACKLES,MACHINES,MANPOWER AND ANY CONSUMABLES/NON CONSUMABLES FOR SURFACE PREPARATION ARE IN VENDOR’S SCOPE. | - | Square Meters |
| 10 | IQCM BANDS 1.2" TO 24" | IQCM BANDS 1.2" TO 24" — PAINTING OF BANDING, LETTERS, ARROWS ON PIPELINE-SUPPLY, PROVIDING AND PAINTING THE BANDING, LETTERS, ARROWS, WORDS OR SENTENCES (IN ENGLISH, AS DIRECTED AT SITE) ON PIPELINES AS PER IQCM GUIDELINES (OR WHERE EVER DIRECTED AT SITE BY HPCL) IN ENAMEL PAINT (OF HPCL APPROVED COLOUR AND SHADES) TO THE ENTIRE SATISFACTION OF HPCL ENGINEER-IN-CHARGE. THE RATE QUOTED SHOULD INCLUDE ALL NECESSARY EQUIPMENTS FOR PAINTING WORK. THE NUMBER OF PLACES ON PIPELINE WHERE LETTERING IS DONE WILL BE MEASURED AS ONE UNIT. E.G: 500 MILLIMETER DIAMETER-MS-A WITH BANDS WILL BE MEASURED AS ONE UNIT. ONLY ARROW HEAD WITH BANDS, IF ANY ALSO WILL BE MEASURED AS ONE UNIT. Suryapet Manadatory: No | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000158-HD-11770.pdf
TENDER_DOCUMENT • 25.67 MB
Download all tender documents and submit your bid