| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.3 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹64.7 L+₹2.4 L (3.87%)Rejected-Finance NO 275 8TH CROSS STREET KODEESWARAN NAGAR TIRUNELVELI TOWN TIRUNELVELI 627006 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627006 | L2 | Rejected-Finance Rejected |
Tender Value
₹62.2 L
EMD Value
₹41,120
Closing Date
24 Jul 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
TAKKAR/INSPECTOR
ARULMIGU UDAIYAVAR VISHWANATHASWAMY TEMPLE
temple repair work and construction of 3 tier raja gopuram
2024_HRCE_457994_1
05/dated 24-06-2024
Open Tender
Civil Works - Others
Lump-sum
365 days
ARULMIGU UDAIYAVAR VISHWANATHASWAMY TEMPLE
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹41,120
5 Nov 2024
28 Jun 2024
24 Jul 2024
28 Jun 2024
24 Jul 2024
28 Jun 2024
Amount
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.
Proposed Rajgopuram Upto 25'0"
Existing Vimanam Upto 15'0"
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without demaging the vari vargams, racking out the joints, cleaning the surface with water, includinng all working in heights, hire charges for special tooks, brushes complete superficial area including all folds - 100sft.
Existing Vimanam Upto 15'0"
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime mortor 1:1.5 complete including shapping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embdding broken bricks of shaped/chiselled bricks, rough-plastering with Lime mortor 1:1.5 and finishing withfinal ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete inculding all axtra for folding and inculuding clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.
Proposed Rajgopuram Upto 25'0"
Existing Vimanam Upto 15'0" ( Nayam Theervai Only)
Painting with multicolour (Panchavarnam) good Emulson paints complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Proposed Rajgopuram Upto 25'0"
Existing Vimanam Upto 15'0"
Dismantling and Removal of Pressed Tiles & Weathering Course etc., including all labour charges for tools, scaffolding charges handling charges etc complete.,
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:1.5 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Flooring with Cut Stone,its not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1.5 etc complete.
Labour charges for Thorough scrapping of old plastered surface including all labour charges for tools, scaffolding charges handling charges etc complete.,
Plastering with Lime Mortar 1:1.5, 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coat with approved Emulsion over one coat of the Lime plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
Dismantling and Removal of Mangalore Tiled Roof without Roof Timbers etc., including all labour charges for tools, scaffolding charges handling charges etc complete.,
Dismantling and Removal of Wrought and put-up Framed Timbers in roofs / floors etc., including all labour charges for tools, scaffolding charges handling charges etc complete.,
Supplying and fixing in position of country wood scantling including all cost and conveyance charges.etc complete., complying with standard specification and as directed.
Supplying and fixing in position of country wood Reepar including all cost and conveyance charges.etc complete., complying with standard specification and as directed.
Supplying and fixing Mangalore Tile (420mm X 250mm) roofing including protruding portion of bolts in roof shall be covered with bitumen compound etc., complete complying with standard specification and as directed.
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Dismantling and Removal of Brick / Stone Masonry in Lime mortar walls under 3m high including cost and conveyance of all materials and labour charges with standard specification.
Dismantling and Removal of Doors and Windows including removal of frames, hinges and fastenings including cost and conveyance of all materials and labour charges with standard specification.
Clean removal of Old paint from the surface wood work in all floors including the cost of primer etc., complete complying with standard specification.
Repainting with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over existing primer coat in all floors complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Water washing the stone surfaces restoration by providingwater jet wash using appropriate methodology with lite tespal liquid ammonia to restore the originalities of the existing granite structure inclusive of hire charges of all tools and plants employed, scaffolding arranements, conveyence harge of all materials to site and labour for work etc.,completed as per standard specification.
Pointing the cut stone joints with Lime Mortor 1:1.5 20mm deep including cost of special tiles such bruch and watering, curing etc complete, as per standard specification.
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Centring upto grade beam
Roof slab, beam
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
for foundation
for Super structure
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Supply of cut stone for carrying out Garpagraham, Arthamandapam, Maha Mandapam, Thirumathil and other Temple Structures upto 10 feet length
walls
Pavukkal upto 10' height
Nilaikal upto 10' height
Floor
Labour charges for dressing and fixing ornamental cut stone work in lime mortar 1:1.5 including point with lime stone excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Chithiravanam
Ubapeedam
Adhistanam
Kalvari
Bothiyal vari
Kabothaga vari
Viyala vari
Pavukkal
Nilaikkal
Flooring
Inner vari
Special plastering for R.C.C. slab beam and sunshades with cement mortar 1:3, 10mm thick including cost and conveyance of all materials, labour for work, and all incidential charges such as scaffolding, finishing and curing as directed by the departmental officers etc., complete complying with the standard specification.
Providing granolithic floor finish 25 mm thickness of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Ornamental Brick masonry Lime Mortor1:2 using Stock (Country)bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor1:2 finishing the same with Lime Mortor1:2 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including Panchavarnam 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder) The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
Sudhai size above 1' 6" upto 2' 6"
Sudhai size above 2' 6" upto 3' 6"
Sudhai size above 3' 6" upto 4' 6"
Sudhai size above 4' 6" upto 5' 6"
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Best varnish two coats for wood works etc, complete complying with standard specifications.
Sub Total
PERUMAL KUMAR (BID ID -1090598)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_544471.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .