| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.6 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹13.7 L+₹14,444 (1.07%)Rejected-Finance | 2 | Rejected-Finance higher rate |
Tender Value
₹12.7 L
EMD Value
₹31,775
Closing Date
17 Feb 2024, 6:00 pmClosed
SHANAVAS.E
Office of the Assistant Engineer,Vellavoor GP
Pro.No. 210/24 Retaining wall construction to Gramapanchayath office Compound
2024_LSGD_656629_1
5/23-24/AE/LIDEW/VLVR
Open Tender
Civil Works - Others
Item Rate
180 days
vellavoor GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹31,775
Yes
20 Mar 2024
9 Feb 2024
19 Feb 2024
9 Feb 2024
17 Feb 2024
9 Feb 2024
Amount
RETAINING WALL
2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD387299/2023-2024:Filling with departmental earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
Sreeram C
Bidder Name
DURAI BUILDERS
Sreeram C
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1014158.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .